ML20039G755
| ML20039G755 | |
| Person / Time | |
|---|---|
| Site: | Fort Calhoun |
| Issue date: | 01/08/1982 |
| From: | William Jones OMAHA PUBLIC POWER DISTRICT |
| To: | Clark R Office of Nuclear Reactor Regulation |
| References | |
| RTR-NUREG-0737, RTR-NUREG-737, TASK-2.B.2, TASK-3.D.3.4, TASK-TM LIC-82-013, LIC-82-13, NUDOCS 8201190098 | |
| Download: ML20039G755 (1) | |
Text
-
1
.l l:'
Omaha Public Power District OMAMA. NEBRASMA 6810p a TELEPHONE 536 4000 AREA CODE 402 1623 MARNEW
^
January 8, 1982 LIC-82-013 o
J N
I8, U
~
Mr. Robert A. Clark, Chief lj q
U. S. Nuclear Reculatory Commission p~ ' ' " '. 3 !292x ;
Office of Nuclear Reactor Regulation C,
Division of Licensing U
Operating Reactors Branch No. 3 g/
's Washington, D.C.
20555
/-
.e r
- z.,,, o
Reference:
Docket No. 50-285
Dear Mr. Clark:
The Omaha Public Power District's letter dated December 28, 1981 provided a status update on the implementation of tasks at the Fort Calhoun Station required by NUREG-0737, " Clarification of TMI Action Plan Requirements." Specifically, Enclosure 1 to the subject letter stated that the implementation of Item II.B.2 of NUREG-0737, regarding j
piant shielding modifications, is presently in progress and will not be completed until April 1,1982 for the reasons stated. This letter 1
transmits further information regarding the plant shielding modifi-cations.
Included as part of the plant shielding modification project is the installation of additional control room shielding. The control room shielding modification project was addressed in the District's letter dated August 7,1981, as part of the implementation of NUREG-0737, Item III.D.3.4, " Control Room Habitability." The August 7, 1981 letter stated that the control room shielding modifications would be completed by January 1, 1982. Since the control room shielding modification is one element of the plant shielding project, the expected completion date is April 1, 1982.
Sincerely, l
B o
w' W. C. Jones Division Manager Production Operations 09 WCJ/KJM/TLP/RWS:jmm
// y cc: LeBoeuf, Lamb, Leiby & MacRae
/0 1333 New Hampshire Avenue, N.W.
Washington, C.C.
20036 8201190098 820108 PDR ADOCK 05000295 P
pop
RE3JLAT33Y INFORMATION DISTRI3d? ION SYSTE4 (RIOS)
ACCESSION N3R: 3201173379
)30.3 ATE: 92/01/0S N3TARIZE3: NO 33CXET
- FACIL:50-295 : ort C91houn Station, Unit 1,
Omahe puolic Power Dist 05000285
~
AUTH.NAME AJTi3R A* FILI 4 TION JONESe a.C.
3naha Puolic Power District RECIP.NAME RECI'IENT.AFFILIATI3N CLAR4,a.A.
Joerating Reactors Branch 3 SJ3 JECT: Advises that TMI Action Plan Iten II.3.2 re cient shielding nods 5 Iten III.T.3.4 re' control roon hooitaoility will se conoleted oy oE0431.
I DISTRIO9 TION C33E: 404bS COPIES RECEIVED:LTR j.'ENCLffl SIZE TITLE: Resoonse to'NJRE3 -3737/NUREGa0660 T4I Action Plan Ramts (OL's)
NOTES:
9ECI*11NT C03IES RECIDIENfi COPIES 10 C33E/NAME LITTR ENCL 10 CODE /NAME LTTR ENCL <
ACTION:
3RB #3 3C' 01.
7 1
INTERNAL: ELD 1
l)
IE 12 2
M IE/0E3.3IR 33 1
L IE/3EP/EP03-1 IE/DE2/EPLa 3
i NRR/DE DIR 21 1
NRR/CE'/ AOCSEi 22 1
NRR/DE/A341El23 1
L NRR/DE/43SA 17 1
NR9/0HFS DIR-28 1
NRR/34FS/)EPY27 1
NR9/0L DIR 14 1
NRR/DL/AOLI 16 1
NRR/0L/A009 15 1
NRR/)L/3RA3-13 3
3 NRR/DSI A333 27 1
NR9/DSI 219 2'4 1
N43/OSI/a)12-31 1
i 199/DSI/A)*S 25 1
NR9/DSI/A31*i25 1
NRR/DSI/ RAS 1
1RR/OST 3IR-30 1
L NRR/3ST/A)T-32 1
9E3 FILE 04 1
EXTERNAL: ACRS 34 10 i n FE4A-REP DIV 1
IND3,J 3TA99E3 1
LP39 03 1
NSIC.
05 1
L NTIS 1
f l
l 1
l L4't C)
TOTAL NUWSER OF,CD'IES 9E3JIRED: LTTR 52 ENCL si
.