Text
d y
y u.
m y
g..
.g tg 9
A g
s s
DISTRIBUTION Docket DEC 171981 NRC PDR L PDR Docket Nos. 50-443 LB#3 Reading FMiraglia and 50-444 JLee LWheeler TERA Mr. William C. Tallman Chairman & Chief Executive OI&E(3)
Officer m
ACRS(16)
N Public Service Company of New Hampshire
/
d @Tk Post Office Box 330 p
Manchester, New Hampshire 03105 O
D-r u#.
'6 O
Dear Mr. Tallman:
9
Subject:
FSAR Chapter 13.1 Review
+
2 fTf@
On January 4 - 6, 1982, members of the NRC staff from the Region Office will be meeting with applicant representatives in Manchester and Seabrook as part of their review of FSAR Section 13.1.
The Region personnel perfomed a preliminary review and identified areas for which additional clarification is required.
Enclosed is a description of the staff's specific concerns.
This list will provide a framework for discussions during the January 4 - 6 ineetings. Your representatives should be prepared to describe the responses to these concerns at that time.
Sincerely, Frank J. Miraglia, Chief Licensing Branch #3 Division of Licensing
Enclosure:
As stated cc w/ encl:
See next page 8201140020 811217 PDR ADOCK 05000443 A
PDR,
o"'">.DL:.LBy..,
.R
=='>..LWtte.er:.lt...n W gl.ia...
1.eU7al......1.e/p3.....
NRCFORM 318 410 00l NRCM O240 OFFICIAL RECOFiD COPY
"* '*32* *2(
SEABROOK i
i i
.Will iam C. Tallman l
Chairman and Chief Executive Officer Public Service Company of New Hampshire l
P. O. Box 330 Manchester, New Hampshire 03105 John A. Ritscher, Esq.
E. Tupper Kinder, Esq.
Ropes and Gray Assistant Attorney General 225 Franklin Street Office of Attorney General Boston, Massachusetts 02110 208 State House Annex Concord, New Hampshire 03301 Mr. Bruce B. Beckley, Project Manager Public Service Company of New Hampshire The Honorable Arnold Wight c
P. O. Box 330 New Hampshire House of Representatives Manchester, New Hampshire 03105 Science, Technology and Energy Committee State House G. Sanborn Concord, New Hampshire 03301 U. S. NRC - Region I
- xgN.631) Par.ki$ tenue
- K i n g Io f P rU s sl a, Mu.4%i ew;;J.bt@c @;MJWERe.si den tlIn s pec to
~
'Penn s~yl vani a.
19406 Seabrook Nucl' ear Power Station
~
c/o U. S. Nuclear Regulatory Commission Ms. Elizabeth H. Weinhold P. O. Box 1149 3 Godfrey Avenue S'eabrook, New Hampshire 03874 Henpton, New Hampshire 03842 Mr. John DeVincentis, Project Manager
~
Rcbert A. Sactus. Esq.
Yankee Atomic Electric Cc.pany O'Neill, Backus and Spielman 1671 Worcester Road 116 Lowell Street Farmingham, Massachusetts 01701 Manchester, New Hampshire 03105 Mr. G. F. Cole, Project Manager Nonnan Ross, Esq.
United Engineers and Constructors 30 Francis Street 30 South 17tk Street Brookline, Massachusetts 02146 Post Office Box 8223 Philadelphia, Pennsylvania 19101 Karin P. Sheldon, Esq.
Sheldon, Hannon f. Weiss Mr. W. Wright, Project Manager 1725 1 Street, N. W.
Westinghouse Electric Corporation Washington, D. C.
20006 Post Office Box 355 Pittsburg, Pennsylvania 15230 Laurie Burt, Esq.
Of fice of the Assistant Attorney General Thomas Oignan, Esq.
Environnental Protection Division Ropes and Gray One Ashburton Place 225 Franklin Street Boston, Massachusetts 02108 Boston, Massachusetts 02110 D. Pierre G. Caneron, Jr., Esq.
General Counsel Public Service Company of New Hampshire P. O. Box 330 l
Manchester, New Hampshire 03105 I
l l
,m..-
~.
l
Et4 CLOSURE o-
,N 630 IE Region l' for Licensee Qualification Branch 630.1 In regard to the professional members of the PStiH corporate organization described in FSAR Section 13.1.1.1, provide the following:
(a) The technical and educational background and PWR experience of individuals assigned ;to the manag'ement of Seabrook Project activities, including identification and qualifications of the management official in overall charge of nuclear power.
(b) The qualification requirements forithose professional staff members not yet assigned.
(c) Specific milestone points for assignment of individuals to the staff.
630.2 In regard to the contracting with YtJSD for operational support services, described in FSAR Section 13.1,_
provide the following:
A description of the colntrhct bbtween -PS$'N.M'd. Yt4SD','MSr?6N51,<N*WW
(~....4yQivpt.i An' L.:&%c%?D~ Y WN t%'@'n m%2r 4.r"=2*':
~
a ~
an including
~'
oversight ' nd control pro' visions th'at exist at' the various levels below the level of the PSl;H Executive Vice President.
(b) The number, by discipline, of professional persons at Yt;SD assigned or expected to be assigned to the Seabrook Project at the time cf clant s ta'-tuo.
(c) The qualifications of those Yt1SD persons assigned to support the Seabrook Project and a description of the qualifications of those to be assigned at the time of plant startup.
(d)
The expected proportion of time Yt1SD personnel will be assigned to the Seabrook Project, at the time of plant startup, if they have assignments to other projects.
630.3 In regard to FSAR Section 13.1 provide the folloviing:
(a) A description of the relationship between the nuclear oriented sections of the PStiH organization to the rest of the cor; orate organization.
(b) A description of the provisions made for support of nuclear activities by other sections of the corporate organization.
630A In regard to FSAR Section 13.1.1.2 provide a description of the capabilities of the training center staff, or alternatives, to provide instruction in engineering topics such as heat t rans fe r,
fluid flow and thermodynamics.
6 30.5 In regard to FSAR Section 13.1 and 14.2, it is our positier. r at 9c cr m er.t e tec!'"i cc ' t t a f -~ be ut il l:ed " t o miti3'