_ - _ _ __

INSTRUMENTATION FIRE DETECTION INSTRUMENTATION LIMITING CONDITION FOR OPERATION 3.3.3.8 As a minimum, the fire detection instrumentation for each fire detection zone shown in Table 3.3-11 shall be OPERABLE.

APPLICABILITY: Whenever equipment in that fire detection zone is required to be OPERABLE. #

ACTION:

With one or more of the fire detection instrument (s) shown in Table 3.3-11 inoperable:

a.

Within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> establish a fire watch patrol to inspect the zone (s) with the inoperable instrument (s) at least once per hour.

Fire zones located inside primary containment (during Modes 1 and 2) and in high radiation areas are exempt from this requirement.

b.

Restore the inoperable instrument (s) to OPERABLE status within 14 days or, in lieu of any other report required by Specification 6.9.1, prepare and submit a Special Report to the Commission pursuant to Specification 6.9.2 within the next 30 days outlining the action taken, the cause of the inoperability and the plans and schedules for restoring the instrument (s) to OPERABLE status.

c.

The provisions of Specifications 3.0.3 and 3.0.4 are not applicable.

SURVEILLANCE REQUIREMENTS 4.3.3.8.1 Each of the above required fire detection instruments shall be demonstrated OPERABLE at lease once per 6 months by performance of a CHANNEL FUNCTIONAL TEST. * ##

l 4.3.3.8.2 The NFPA Code 72D Class A supervised circuits supervision associated with the detector alarms of each of the above required fire detection instruments shall be demonstrated OPERABLE at least once per 6 months. * ##

l 4.3.3.8.3 The non-supervised circuits between the local panels in Specification 4.3.3.8.2 and the control room shall be demonstrated OPERABLE at least once per 31 days.

ARKANSAS - UNIT 2 3/4 3-43 doo$K o h h p

PEWT

~

___-.___._--___--___-__-_____._______-._-___m-._.__d

The fire detection instruments located within the containment are not required to be OPERABLE during the performance of Type A Containment Leakage Rate Tests.

The minimum number of fire detectors and circuits required inside the containment shall be functionally tested during each cold shutdown exceeding 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> unless performed during the previous six months.

i.Il fire detectors located inside the containment and their associated circuits shall be tested during each refueling outage.

Detectors and circuits inaccessable during normal operations due to high radiation levels shall be functionally tested each time modes of operation are established which reduce the radiation to an acceptable level (for more than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />) unless performed during the previous 6 months. All fire detectors located in high radiation areas shall be tested at least once per refueling cycle.

ARKANSAS --UNIT 2 3/4 3-43a

TABLE 3.3-11 FIRE DETECTION INSTRUMENTS INSTRUMENT LOCATION MINIMUM INSTRUMENTS OPERABLE HEAT SMOKE 1.

Containment North Penetration Area-Upper (2033-K) 2/ Area 2/ Area North Penetration Area-Lower (2033-K) 2/ Area 2/ Area South Penetration Area-Upper (2032-K) 2/ Area 2/ Area South Penetration Area-Lower (2032-K) 2/ Area 2/ Area 2.

Cable Spreading (2098-L)

Line Heat 4

1/ tray 3.

Switchgear Room Room 2100-Elev. 372 (2100-Z) 2 Room 2101-Elev. 372 (2101-AA) 2 4.

Remote Shutdown Panels (2154-E) 1 5.

Emergency Diesel Generator Rooms Room 2093-Elev. 369 (2093-P) 2 (Flame) 2 Room 2094-Elev. 369 (2094-Q) 2 (Flame) 2 6.

Diesel Fuel Storage Vaults 1/ Vault 7.

Penetration Rooms North Penetration Area-Upper (2133J) 2/Rcom North Penetration Area-Lower (2112-88) 2/Reom South Penetration Area-Upper (2137-I) 2/ Room South Penetration Area-Lower (2111-T) 2/ Room 8.

Containment Purge Air j

Equipment Area (2156-A) 2-l l'

9.

Heating & Ventilation Air Intake Area-Elev. 386 (2114-I) 2 10.

Tank Room-Elev. 386 (2115-I) 2 (Numbers in parentheses refer to fire zone designations in the AP&L Fire Hazards Analysis) l ARKANSAS - UNIT 2 3/4 3-44 l

l L

TA8LE 3.3-11 (continued)

FIRE DETECTION INSTRUMEt;TS INSTRUMENT LOCATION MINIMUM INSTRUMENTS OPERABLE HEAT SMOKE 11.

Health Physics, Locker Line Heat #

1/Rooe Area, Control Access Arta-1/ tray.

Elev. 386 (2136-I)

12. Area North of Stair No. 200 2

Elev. 372 (2107-N) 13.

Pump Room-Elev. 372 (2106-R) 1

14. MCC & Corridor-Elev. 374 Line Heat 2

& 372 (2109-U) 1/ tray 15.

Hot Machine Shop-Elev. 354 (2068-DD) 2 16.

Tank Room, Access Area, 1/ Area Pump Area-Elev. 354 (2073-DD) 17.

Upper South Piping Penetration Room 2

Elev. 360 (2084-DD) 18.

Electrical Equipment Room 2

Elev. 354 (2076-HH) 19.

Upper North Piping Penetration Room 2

Elev. 356 (2081-HH) 20.

Pump Room-Elev. 329 (2024-JJ) 1 21.

Pump Room - Elev. 329 (2025-JJ) 1 22.

Tank Room, Pump Room 1/ Room

  • Elev. 335 (2040-JJ) 23.

Lower South Piping Penetration 2

Elev. 335 (2055-JJ) 24.

Pipwey, Equipment Access 1/ Area Elev. 335 (2223-KK) 25.

General Access-Elev. 317 (2006-LL) 2 (Numbers in parentheses refer to fire zone designations in the AP&L Fire Hazards Analysis)

  • No detectors in room 2038
  1. 0nly in room 2139 ARKANSAS - UNIT 2 3/4 3-44a

~.-

,,,_.s

TABLE 3.3-11 (continued)

FIRE DETECTION INSTRUMENTS INSTRUMENT LCCATION MINIMUM INSTRUMENTS OPERABLE Heat Smoke 26.

Pump Area-Elev. 317 (2007-LL) 2 27.

Pump Area-Elev. 317 (2010-LL) 1 28.

Gallery Access-Elev. 317 (2011-LL) 4 29.

Pump Area-Elev. 317 (2014-LL) 2 30.

Condensate & Demineralizer Area 8

Elev. 354 (2200-MM) 31.

Service Water Pump Area, Intake Structure 2/ Room (Numbers in parentheses refer to fire zone designations in the AP&L Fire Hazards Analysis) 3 I

l l

l l'

i l

i ARKANSAS - UNIT 2 3/4 3-44b l

1

, ~. - -,

PLANT SYSTEMS SPRAY AND/0R SPRINKLER SYSTEMS LIMITING CONDITION FOR OPERATION 3.7.10.2 The following spray and/or sprinkler systems shall be OPERABLE:

a.

Emergency Diesel Generator Rooms Room 2093 - Elev. 369' Room 2094 - Elev. 369' 1

b.

North Penetration Areas, Inside Containment Elev. 386' Elev. 374'6" c.

South Penetration Areas, Inside Containment.

Elev. 386' Elev. 374'6" d.

North Penetration Room, Reactor Auxiliary Building Elev. 386' Elev. 374'6" e.

South Penetration Room, Reactor Auxiliary Building Elev. 386' Elev. 374'6" f.

Cable Spreading Room - Elev. 372' g.

Diesel Fuel Storage Vaults h.

Corridor to Lower South Electrical Penetration Room Rooms 2104, 2105, 2109-Elev. 374'6" & 372 i.

Corridor behind Control Room Room 2139-Elev. 386'

~

APPLICABILITY: Whenever equipment in the spray / sprinkler protected areas is required to be OPERABLE:

i, ARKANSAS - UNIT 2 3/4 7-33

ACTION:

a.

With one or more of the above required spray and/or sprinkler systems inoperable, establish a continuous fire watch with backup fire suppression equipment for the unprotected area (s) within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />; restore the system to OPERABLE' status within-14 days or, in lieu of any other_ report required by Specification 6.9.1, prepare and submit a Special Report to'the Commission pursuant to Specification 6.9.2 within the next-30 days outlining the action taken, the cause of the inoperability and the plans and schedule for restoring the system to OPERABLE status.

b.

The provisions of Specification 3.0.3 and 3.0.4 are not applicable.

ARKANSAS - UNIT 2 3/4 7-33a

,{f

'~,

PLANT SYSTEMS FIRE HOSE STATIONS LIMITING CONDITION FOR OPERATION 3.7.10.3 The Fire hose stations shown in Table 3.7-7 chall be OPETABLE.

APPLICABILITY: Whenever equipment in the areas protected by the fire hose stations is required to be OPERABLE.

ACTION:

a.

With one or more of the fire hose stations outside containment l

shown in Table 3.7-7 inoperable, route an additional equivalent capacity fire hose to the unprotected area (s) from an OPERABLE hose station within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, b.

The provisions of Specifications 3.0.3 and 3.0.4 are not applicable.

SURVEILLANCE REQUIREMENTS 4.7.10.3 Each of the fire hose stations shown in Table 3.7-7 shall 'tue demonstrated OPERABLE:

a.

At least once peq 31 days by visual inspection of the station accessible during plant operations to assure all required equipment is at the station.

b.

At least once per 18 months by visual inspection of_the stations not accessible during plant operations to ascure all required equipment is at the station.

c.

At least once per 18 months by:

1.

Removing the hose for inspection and re-racking, and 2.

Replacement of all degraded gaskets in couplings.

d.

At least once per 3 years by:

1.

Partially opening each hose station valve to verify valve OPERABILITY and no flow blockage.

2.

Conducting a hose hydrostatic test at a pressure at least 50 psig greater than the maximum pressure available at that hose station.

pQ ARKANSAS - UNIT 2 3/4 7-35 w'4

-.,m

!s

]

\\

m-m N

c. tAA x

x

, v s\\t y ;'

2g M

I

.x v,

g N

s. j f' M Q

\\

',g a

y t

s

.x TABLE 3.7-7J~

2 y

+

i

~

.\\

-4 f

s FIRE HOSE STATIU,MS.

\\ A s3 r

c s 3

1,.2

.g s

,,R ELEVATION % ' HOSE RACK #

t LOCATION--

x

./

.+

(

N

.0_4,..

2*3U 7

Spent Fuel Area 4

ty-s t

N,,'E

'40(;

Ouf.sideCPCRoora

+

'2-32.

s s

N3 a ;

q..

.s

?,.

.s s

Corridor' West if Cotstrol Roc kend "

1 7

-Upper South Elec. Penet. Room' M 86 2 25

"~6 s1 t

.I 1

\\

.O-Turbine ~ Bldg. outside _ Control',Roora s;&'386sen

~ 2-lh.c-s Corridorout.sideluncifRoomdree

' N 38'6' 2-38 l

- - ~

x

.t.

+,

x,

%u~

,a

\\ ',

s 4 t 2tP.9 s '

Stairway 2001 outsids of Cable '

\\, 372

(

x; N + 1 Spreading Room s 1'

l -,

w.

8 Corridor outside of Lowe[r NoN. -. _ \\.-

'" " i+2'28. >

y 8

ii~

372 Elec. Penet. Room

'S

\\

~'

3 g

e

, Corridor North of Cable Sp(eading 372

2-39]

Room s

_. x s s

s

.s, s,

. ' Corridor OUtsid'e of UpperlNor'th a 372 1-37 t

Elec. Penet. Room'

?'. 7 s '

% - g}

ss

's_

3

zg Corridor South of Upper South O N 354 _ J

_' '2-27

' Piping Pecet.s Poom E-c' c

3 y Corridor outside of Piping Penet.

,.s c2-24 o

%~

335 s

Areas s

+

a s

,x

~

m.

J Corridor North of St.?irwa['y 20D1 335 2 -

c, Turbine euilding outside of Upper

'368 2-20 North Electrica.l.. Equipment Room s

4

/

~ JCorridor.' East ~of Lower South.

335 '

2-40

~

Piping Penetration ~Arca

,Ny j

~

fi 4

e

.,q.

Ger.eral Acc'hss Area'

.' s;'-

317 's - 41

~

'r General'ttcess,. Area. f C

s31['

2-42

~

?. x.-

y 3.. -

j

- G.,

y

- s s

p.

w

\\

g.

s

(

y-c.

a s

q'-

ARKANSAS - UNIT 2 y 3/,4 7-36 '

x n

g s.

<~

sy g

s 4,--

n !

'%z'

    • \\

_ -f-w --

- ' ;~. %

g.

m N

q

,..g.

k og w

h s_[\\g

  • t-

/

E 4

l w

's/',b'

"' }.

g'

'S e.i h.

3

')

-5

. i f

g g.

s 2 (. g.l '

. s t

( :-

-w

~

y V', J.,#

s l'

x b

..-Q,.',_,

i.

i.

u: 4,. - -

4a.

..t-

- +

TABLE 3.7-7 (continued)

FIRE HOSE STATIONS

.0 CATION ELEVATION HOSE RACK #

Containment 426-6 2-43 426-6 2-44 405-6 2-45 405-6 2-46 386 2-47 386 2-48 376-6 2-49 376-6 2-50 357 2-51 357 2-52 336-6 2-53 336-6 2-54 336-6 2-55 L