ML20039F592
| ML20039F592 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 12/23/1981 |
| From: | Martin T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Morisi A BOSTON EDISON CO. |
| Shared Package | |
| ML20039F593 | List: |
| References | |
| NUDOCS 8201130129 | |
| Download: ML20039F592 (2) | |
See also: IR 05000293/1981032
Text
r
--
/Ef!it
-
-
f * JJG-
DEC 2 E 1981
gf-,7- #2
Docket No. 50-293
Boston Edison Company M/C Nuclear
ATTN: Mr. A. V. Morisi
<d
g
Nuclear Operations
Support Manager
Ca
p
800 Boylston Street
RECElVED
Boston, Massachusetts 02199
'
E
JAN 111982Q
'
Gentlemen:
g e m:am uwm3
W 'Y * (3
i
[f
Subject:
Inspection No. 50-293/81-32
-
v3
This refers to the routine safety inspection conducted by Dr. Ji
of
this office on November 2-6, 1981 at Pilgrim Nuclear Power Station Unit 1,
Plymouth, Massachusetts of activities authorized by NRC License No. DPR-35 and
to the discussions of our findings held by Dr. J. W. Chung with Mr. : R. D.
Machon and other members of your staff at the conclusion of the inspection.
.
Areas examined during this inspection are described in the Office of Inspection
and Enforcement Inspection Report which is enclosed with this letter. Within
these areas the inspection consisted of selective exami1ations of procedures
and representative records, interviews-with personnel, and observations by the
inspector.
Our inspector also verified the steps you have taken to correct the items of
noncompl.iance brought to your attention in a letter dated February 19, 1981.
We have no further questions regarding your action at this time.
Within the scope of this inspection, no items of noncompliance were observed.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and'the enclosed inspection report will be placed in the NRC's
Public Document Room. .If this report contains any information that you (or
your contractors) believe to be exempt from disclosure under 10 CFR 9.5(a)(4),
,
it is necessary that you (a) notify this office by telephone within ten (10)
'
days from the date of this letter of your intention to. file a request for
withholding; and (b) submit within 30 days from the date of this_ letter a
written application to this office to withhold such information. Consistent
with section 2.790(b)(1), any such application must be accompanied by an
affidavit executed by the owner of the information which identifies the document
or part sought to be withheld, and which contains a full statement of the
reasons on the basis which it is claimed that the information should be withheld
RI:DETh
RI:DETI
RI:DETI
RI:DE
Chung/gwe
Bettenhausen
E
T.M rtin
/d/
JFFICIAL ECORD COPY
B201130129 811223
4f@
'
PDR ADOCK 05000293
i
_
.
.
Boston Edison Company M/C Nuclear
'2
from public disclosure. This section further requires the statement to address
with specificity the considerations listed in 10 CFR 2.790(b)(4).
The information
sought to be withheld shall be incorporated as far as possible into'a separate
part of the affidavit.
If we do not hear _from you in this regard within the..
specified. periods noted above, the report will be placed in the Public Document
Room. The telephone notification of your intent to request withholding, or
any request for an extension of the 10 day period which you believe necessary,
should be made to the Supervisor, Files, Mail and Records, USNRC, Region I, at
(215) 337-5223.
No reply to this letter is required. Your cooperation with us in this matter
is appreciated.
Sincerely,
f
1
h5
g Thomas T. Martin, Director
Division of Engineering and Technical
Inspection
Enclosure: Office of Inspection and Enforcement Inspection
Report Number 50-293/81-32
cc w/ encl:
R. D. Machon, Nuclear Operations Manager - Pilgrim Station
.
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
Commonwealth of Massachusetts (2)
-NRC Resident Inspector
bec w/ encl:
Region I-Docket Room (with concurrences)
Chief, Operational Support Section (w/o encis)
E. J. Brunner, RI
0FFICIAL RECORD COPY