ML20039E748
| ML20039E748 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 12/18/1981 |
| From: | Martin T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Hukill H METROPOLITAN EDISON CO. |
| References | |
| NUDOCS 8201110292 | |
| Download: ML20039E748 (2) | |
See also: IR 05000289/1981013
Text
7s TvmilTTED HEREY/ITH
7g
Comm lu CFR 2.700 INFORMATIONCO@S@
ENcv
'
'
..
..
,
'
DEC 18 1981
,
Docket No. 50-289
sn
6
A
Metropolitan Edison Company
p
RECyggggO
B
ATTN: Mr. H. D. Hukill
-
d4N 7
~
Vice President and Director of TriI-l
-
P. O. Box 480
g.
- aure
NMg
Middletown, Pennsylvania 17057
p
N
Gentlemen:
'
M
$
Subject:
Inspection 50-289/81-13
This refers to the routine safeguards inspection conducted by Mr. R. J.
Bailey of this office on May 11-15, and 21-22, 1981, at Three Mile Island
Nuclear Station, Unit 1, Middletown, Pennsylvania, of activities authorized
by NRC License No. DPR-50 and to the discussions of our findings held by
Mr. Bailey with yourself and members of your staff at the conclusion of the
inspection.
Areas examined during this inspection are described in the Office of Inspection
and Enforcement Inspection Report which is enclosed with this letter.
Within these areas, the inspection consisted of selective examinations of
procedures and representative records, interviews with personnel, and
observations by the inspectors.
Our inspectors also verified the steps you had taken to correct the items
of noncompliance brought to your attention in letters dated November 20,
1979, September 25, 1980,and October 16, 1980.
We have no further questions
regarding your action at this time.
Based on the results of this inspection, it appears that one of your activities
was not conducted in full compliance with NRC requirements, as set forth in
the Notice of Violation, enclosed herewith as Appendix A.
This item of
noncompliance has been categorized into the levels described in the Federal
j
Regi~ ster Notice (45 FR 66754) dated October 7, 1980. You are required to
respond to this letter and in preparing your response, you should follow
'
the instructions in Appendix A.
!
In accordance with Section 2.790(d) of the NRC's " Rules of Practice," Part
2, Title 10, Code of Federal Regulations, documentation of findings of your
control and accounting procedures for safeguarding special nuclear materials
.
and your facility security measures for physical protection are deemed to
l
be commercial or financial information within the meaning of 10 CFR 9.5(a)(4)
l
and shall be subject to disclosure only in e.ccordance with the provisions
l
of 10 CFR 9.12; therefore, the enclosures to this letter, and your response
to this letter will not be placed in the Public Document Room and will
receive limited distrE ution.
~
R1:DETI
f DETI
(R1:DETI
R1 RPI
'E^
'
ficKeown/wb
.
etlipj.f Joyne
Ke attj
I M L'.l 2 %r_2
11/1'!81
u-i
TRANS"!TTED HEr~"fiTH
0 00
9
!
G
CFR 2.790 INFORMAHON
l
ENCLOSURES TRAN3MliTEu h usiTH
CONTAIN 10 CFR 2.790 INFORMATION
1
.-
..
.
.
~
.
..
Metropolitan Edison Company
2
DEC 18 1981
Should you have any questions concerning this inspection, we will be pleased
to discuss them with you.
Sincerely,
w id
.
~
[s
as T. Martin, Director,
Division of Engineering and
Technical Inspection
Enclosures:
1.
Appendix A, Notice of Violation (Contains 2.790(d) Information)
2.
Office of Inspection and Enforcement
Inspection Report Number 50-289/81-13 (Contains 2.790(d) Information)
cc:
R. J. Toole, Operations and Maintenance Director, TMI-1 (w/rpt cover
sheet only)
C. W. Smyth, Supervisor, TMI-l Licensing (w/rpt cover sheet only)
E. G. Wallace, Manager, PWR Licensing (w/rpt cover sheet only)
J. B. Liberman, Esquire (w/rpt cover sheet only)
G. F. Trowbridge, Esquire (w/rpt cover sheet only)
Public Document Room (PDR) (w/rpt cover sheet only)
Local Public Document Room (LPOR) (w/rpt cover sheet only)
Nuclear Safety Information Center (NSIC) (w/rpt cover sheet only)
NRC Resident Inspector (w/encis)
Commonwealth of Pennsylvania (w/rpt cover sheet only)
bec;
Region I Docket Room (with concurrences) (w/rpt cover sheet only)
L. Barrett, Deputy Program Director, TMI Program Office (w/rpt cover
sheet only)
D. Skanson, OELD: HQ (w/rpt cover sheet only)
Chief, Operational Support Section (w/o encis)
0FFICIAL RECORD COPY
l
.
ENCLOSURES TRANSMITTED HERE"!iTH
CONTAIN 10 CFR 2.700 INFORMANN
,