Forwards Cost/Fuel Load Schedule & Progress Update for Nov 1981.Facility 97% Complete as of 811124
ML20039E536
Person / Time
Site: Zimmer
Issue date: 12/15/1981
From: Borgmann E
CINCINNATI GAS & ELECTRIC CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
NUDOCS 8201110008
Download: ML20039E536 (6)


Text

e e- -...

e l

THE CINCINNATI GAS & ELECTRIC COMPANY sg-CINCINN ATI. OHIO 4520i i

December 15, 1981 E'. A. BORGM AN N PRINCIPAL STAJF scecon wcc passioc,a DIR

%Isl _

D/D loa 9 U. S. N'Jclear Regulatory Commission 4/D br O___I l

Office of Inspection and Enforcement g h py, I

l Region III g

MgETI fM l

Glen Ellyn, Illinois 61037 DEP&OE File Attention: James G. Keppler Regional Director

Subject:

Wm. H. Zimmer Nuclear Power Station - Clermont County, Ohio Construction / Fuel Load Schedule and Progress Update November, 1981.

Gentlemen:

Please be advised regarding the above subject that this project is considered 97.0% complete as of November 24, 1981.

Attached are copies of the form showing actual dates and status of various activities.

l l-Please feel free to contact us if there are any questions or conraents.

Very truly yours, o

Q THE CINCINNATI GAS & ELECTRIC

+

COMPANY g

g7 2"

By p eius88 -f E. A. BORGMANN 8Ts$onog1" 9

Senior Vice President EAB:bm 4

a cc: Wm. H. Lovelace W. F. Christianson, NRC Resident Inspector DEC 3 i BO' l

8201110008 811215 PDR ADOCK 05000358 R

PDR I

j de2[6' \\

DOCKET NO. 50-358 El ACTUAL DATES & STATUS BER CONSTRUCTION MILESTONES AND ACTIVITIES STATUS DATE FOR H-48 WM. H. ZIMMER NUCLEAR POWER STATION Activity Activity Est.

I-J Numbers (Description & Account Numbers)

Started Complete Status 0 8005 Pobilize 3-71 6-71 Comp 1.

0 8014 Tenden Tunnel & Backfill 10-72 5-73 Cotpl.

0 8155 Install Diesel Generator and Oil Tank Building (1220) 5-74 9-79 Ccepl.

n 8235 Install Condensate Water Storage Tank (2491-3310) 6-74 10-75 Compl.

i 0 8245 Install Reactor Clean-Up System Demir.eralizers (2423-5110,5250,5410) (2427-5410) 7-75 11-75 Ceral.

l0 8265 Install RHR Pumps (2425-5110) 7-75 2-78 Compl.

0 8270 Install RHR Heat Exchangers (2425-5210) 11-75 11-75 Conpl.

0 8280 Construct Radioactive Waste Facility (1260) 4-74 12-78 Compl.

0 8315 Install Motor Control Centers (MCC's) and 480 Volt Unt: Substation (4711-7470.7490)(4718-7470) 19-7s 5 78 Compl.

0 8320 Install Instrumentation Air System (2652) 6-76 4-79 Ccmpl.

l 0

833J Install Recirculating Piping (2641) 11-72 5-79 Compl.

0 8341 Install Reactor Building Closed Coolinq Water Systc.n (2573) 7-75 5-79 Compl.

0 8350 Install HPCS, LPCS and ADS Systems (2647) 2648) & M S Relief Valves 10-75 5-79 Compl.

0 8365 Install Standby Liquid Control System (2681) (2422) 2-76 5-79 Comp 1.

0 8370 Process Contral & Lcgic Instrumentation Calibration (2470) 8-75 2-82 Est.

97%

'O 8400 Install 6.9KV Reserve Power Supply (4715) 10- 75 6-77 Compl.

i f

1 cr 9

t

?

e a

-I-J NUMBERS (Description & Account Nun.bers)

Activity Activity Est.

'd Started Completed Status j

i 0

8405 Install Conduit and Cable Trays (4750-7110, 7180. 7120)

G-73 5-81 Co=pl.

0 8410 Install 6.8KV and 4.16KV Auxiliary Switchgear (4712) 11-75 7-79 Compl.

O 8415 Install Cables (Instrumentation, Control and Power) (XXXX-7310 thru 7370)(XXXX-7210 thru 7270:

2-76 11-81 Compl.

0 8420 Perform Construction Testing on Cables (Megger, Continuity, Etc.)

CG&E 2-76 12-81 Est.

95%

0 8425 Install Batteries and Chargers (4722-7550, 7560) 4-76 2-77 Compl.

l 0

8435 Install Process Instruments (2650-0000) (2470-0000) 6-76 2-82 Est.

97%-

l

'f 0

8520 HPCS and LPCS Actuation and Partial Flow Test CG&E 5-81 4-82 Est.

50%

0 8525 RCIC Actuation and Partial Flow Test 7-81Est 4-82 Est.

3%

j a

0 8530 RHR System Actuation and Flow Test 7-81Est 4-82 Est 10%

a 10-79 3-82 Est.

40%

0 8535 Stand-by Liquid Control System Actuation Flow Test

=

0 8540 Recirculation Pump Cold Flow and Vibration Test 4-81 1-82 Est.

40%

a 0

8545 Integrated Diesel Generator Synchronizing Test 4-82Est 5-82 Est.

29%

a 10-78 3-82 Est.

46%

l 0

8550 Service Water System and Closed Water Systems Test a

11-78 10-79 Compi.

0 8555 Battery Capacity Test a

0 8570 DC Inverter / Diverter. System Test 10-80 4-82 Est.

81%

j a

4-79 4-81 Compl.

0 8575 Control Rod Drive Hydraulic System Test a

10-79 3-82 Est.

75%

O 8590 Feedwater and Condensate System Test (2 Elements) a l

0 8585 Instrument Air System Test 7-79 2-81 Compl.

a 0

8590 Fire Protection System Test 6-79 442 Est.

75%

0 8595 Flamability Control System (HG)12-81Est 4-82 Est.

0%

/

i t

e i

/

^

Fe:e 3 Il I-J Numb *rs (D:scription & Account Numbers)

Activity Activity Est.

Start *d Complet-d Status 0

8510' Reactor Building Vent System Test CG1E 9-80 5-81 Est.

78%

0 8730 Speical !!uclear Material License Issued CG',E 4-77 7-78 Ccmpi.

l 0

8735 Applicant Sumbits Emergency Plan CCLE 9-75 11-77 Cocpl.

9-75 5-77 Comp 1.

0 8740 Applicant Submits Security Plan CG&E 0

8745 Applicant Submits Quality Assurance Program for Operations CG&E 9-75 12-77 Comp 1.

7-82 Est.

7-82 Est.

0%

l O.

8750 Applicant's Review and Approval of Test Results CG&E 4-77 7-82 Est.

25%

0 8755 Applicant's Preparation of Power Ascension Test Program CG1E 8-75 2 -82 Est.

90 %

0 8805 Install Control Room Consoles and Equipment (2475)(2471) 0 8810 Accumulation of Environnental Data (One (1) or Two (2) Years)

Ccep1.

12-75 5-80 Comp 1.

0 8820 Install and Calibrate riuclear Instrumentation (2474) 8-75 8-78 Compl.

0 8900 Install Pr imary Switchyard CGEE 4-74 6-81 Comp 1.

0 8905 Install Off-Gas Systems (2685) (2462)

I 5-75 2-77 Comp 1.

0 8240 Install Condensate Suction Header to RCIC System (2642) (2634) l 5-71 6-71 Comp 1.

8005 8015 Prepare Site (1100) 8015 8050 Install Reactor Building Foundation (1211) 6-73 10-73 Compl.

10-73 2 -8 2 Est.

91%

Install Drywell and Suppression Chamber and Reactor Pressure Vessel Pedestal (2213) (2411) 8050 8200

! 8055 8325 Construct Reactor Bulding and Integral Structures (1210) 10-73 9-79 Comp 1.

10-73 6-78 Ccep1.

8050 8145 Construct Turbine / Generator Foundation (3514) 8-76 7-78 Comp 1.

8055 8915 Install Off-Gas Stack (2466-3610) 9-73 5-76 Comp 1.

8075 8920 Install Secondary Heat Sinks (Cooling Towers)(3571) 12-73 11-74 Comp 1.

8115-8120 Install Containment Penetraticns (Sleeves in Liner) (2213-3770)

,f k

h a

/

e

[J r -g -

rg Activity Activity Est.

'yI-JNumbers (Description & Account Numbers)

Started Complet?

Status _

J 8140 8275 Install Service Water Intake Structures (1280) 8-74 10-78 Compl.

Install Condenser, Turbine Generator and Piping)(Exclusive of Condensate and 8145 8910 Feedwater Piping (3531) (3511) 8-75 12 Compl.

8150 8285 Install Feedwater and Condensate Water System (2623) (2634) 1-75 5-79 Compi 8155 8445 Install Diesel Generator (2487-5160) 5-76 8-78 Compl.

, -82 Est.

92%

1 7-76 8165 8430 Install Drywell Air Cooler System (2624) 2-75 l'.-7 7 Co :pl.

S175 8180 Install Containment 8iological Shiciding (2213-3750,2740,2720,2730).

8200 8300 Install Reactor Pressure Vessel (00 Site) (2411-5310) 11-75 1-76 Comp 1.

l 8205 8230 Install Recirculating Pu r:p (2412-5110) 9-75 12-78 Compl.

l 8210 8325 Install Main Steam Lines to MSIV 9-75 3-77 t rpl.

8215 8465 Install Control Red Drive System (2414)(2684) 7-75 4-79 Compl.

8220 8440 Install Reactor Internals (2411-5610) 10-75 4-79 Comp 1.

8245 8335 Install Reactor Clean-U;) System Pipe, Fittings & Valves (2643-6540,6640) 2-76 10-78 Compl.

8270 8350 Install RiiR Pipe, Fittings and Valves (2646-6540) 10-75 10-78 Compl.

t 11-72 1-81 Compl.

l.

8275 8470 Install Cnoling Water Ploes and Controls (2621) (WS SYS) 11-75 3-81 Compl.

I 8280 8605 Install Radioactive Waste System and Radiation Monitorinq System (2682)(2686)(2683)(2387)(2685) 8300 8450 Install Piping Connected to Primary System Comoonents (2640) 10-75 5-79 Compl.

3-75 6-8 2Est.

92%

8305 8475 Install Pine Hancers and Restraints All Systems (XXXX-6550,6450,6650,6750,2213,3910) 8310 8315 Install Main Steam Pipe to Turbine Stop Valve (2631) LB Pipe 4-75 5-1-77 Comp 1.

12-76 6-81 Compl.

8450 8500 Initial Flush cf Systems (XXXX,6890) 8500 8515 Perform Reactor Cold Hydrostatic Test 5-78 7-78 Comp 1.

3 3-78 7-8 2 Est.

95%

8515 8600 Complete Base Lire Inspecticas CGLE i

w'

,99

(

f 4-

-- ee 2_.---.e-_..;..

rep 5 r

Activity Activity Est.

g j

I-J Nu-bers (Description & Account Nue:bers)

Startvd

'Compl*tt Status 8600 8700 Perform Leak Rate Test CG&E 3-32 Est.

5 -E2 Est.

01 l

6-82 Est.

6-82 Est.

0%

8605 8615 Test Radioactive System and Radiation Monitorino System 5-82 Est.

5-82 Est.

0%

8700 8800 Integrated System Test S-79 S-79 Corpl.

l~

8740 8815 Special Nuclear Material Delivered i

7-82 Est.

7-82 Est.

C j

8800 8950 Applicant Submits Test Results 7-82 Est.

11-82 Est.-

0%

=

8950 8990 Power Ascension

?

I J

I t

I i

e f

]

I t

1

/-

e W

e

.