THE CINCINNATI GAS & ELECTRIC COMPANY sg-CINCINN ATI. OHIO 4520i i
December 15, 1981 E'. A. BORGM AN N PRINCIPAL STAJF scecon wcc passioc,a DIR
%Isl _
D/D loa 9 U. S. N'Jclear Regulatory Commission 4/D br O___I l
Office of Inspection and Enforcement g h py, I
l Region III g
MgETI fM l
Glen Ellyn, Illinois 61037 DEP&OE File Attention: James G. Keppler Regional Director
Subject:
Wm. H. Zimmer Nuclear Power Station - Clermont County, Ohio Construction / Fuel Load Schedule and Progress Update November, 1981.
Gentlemen:
Please be advised regarding the above subject that this project is considered 97.0% complete as of November 24, 1981.
Attached are copies of the form showing actual dates and status of various activities.
l l-Please feel free to contact us if there are any questions or conraents.
Very truly yours, o
Q THE CINCINNATI GAS & ELECTRIC
+
COMPANY g
g7 2"
By p eius88 -f E. A. BORGMANN 8Ts$onog1" 9
Senior Vice President EAB:bm 4
a cc: Wm. H. Lovelace W. F. Christianson, NRC Resident Inspector DEC 3 i BO' l
8201110008 811215 PDR ADOCK 05000358 R
PDR I
j de2[6' \\
DOCKET NO. 50-358 El ACTUAL DATES & STATUS BER CONSTRUCTION MILESTONES AND ACTIVITIES STATUS DATE FOR H-48 WM. H. ZIMMER NUCLEAR POWER STATION Activity Activity Est.
I-J Numbers (Description & Account Numbers)
Started Complete Status 0 8005 Pobilize 3-71 6-71 Comp 1.
0 8014 Tenden Tunnel & Backfill 10-72 5-73 Cotpl.
0 8155 Install Diesel Generator and Oil Tank Building (1220) 5-74 9-79 Ccepl.
n 8235 Install Condensate Water Storage Tank (2491-3310) 6-74 10-75 Compl.
i 0 8245 Install Reactor Clean-Up System Demir.eralizers (2423-5110,5250,5410) (2427-5410) 7-75 11-75 Ceral.
l0 8265 Install RHR Pumps (2425-5110) 7-75 2-78 Compl.
0 8270 Install RHR Heat Exchangers (2425-5210) 11-75 11-75 Conpl.
0 8280 Construct Radioactive Waste Facility (1260) 4-74 12-78 Compl.
0 8315 Install Motor Control Centers (MCC's) and 480 Volt Unt: Substation (4711-7470.7490)(4718-7470) 19-7s 5 78 Compl.
0 8320 Install Instrumentation Air System (2652) 6-76 4-79 Ccmpl.
l 0
833J Install Recirculating Piping (2641) 11-72 5-79 Compl.
0 8341 Install Reactor Building Closed Coolinq Water Systc.n (2573) 7-75 5-79 Compl.
0 8350 Install HPCS, LPCS and ADS Systems (2647) 2648) & M S Relief Valves 10-75 5-79 Compl.
0 8365 Install Standby Liquid Control System (2681) (2422) 2-76 5-79 Comp 1.
0 8370 Process Contral & Lcgic Instrumentation Calibration (2470) 8-75 2-82 Est.
97%
'O 8400 Install 6.9KV Reserve Power Supply (4715) 10- 75 6-77 Compl.
i f
1 cr 9
t
?
e a
-I-J NUMBERS (Description & Account Nun.bers)
Activity Activity Est.
'd Started Completed Status j
i 0
8405 Install Conduit and Cable Trays (4750-7110, 7180. 7120)
G-73 5-81 Co=pl.
0 8410 Install 6.8KV and 4.16KV Auxiliary Switchgear (4712) 11-75 7-79 Compl.
O 8415 Install Cables (Instrumentation, Control and Power) (XXXX-7310 thru 7370)(XXXX-7210 thru 7270:
2-76 11-81 Compl.
0 8420 Perform Construction Testing on Cables (Megger, Continuity, Etc.)
CG&E 2-76 12-81 Est.
95%
0 8425 Install Batteries and Chargers (4722-7550, 7560) 4-76 2-77 Compl.
l 0
8435 Install Process Instruments (2650-0000) (2470-0000) 6-76 2-82 Est.
97%-
l
'f 0
8520 HPCS and LPCS Actuation and Partial Flow Test CG&E 5-81 4-82 Est.
50%
0 8525 RCIC Actuation and Partial Flow Test 7-81Est 4-82 Est.
3%
j a
0 8530 RHR System Actuation and Flow Test 7-81Est 4-82 Est 10%
a 10-79 3-82 Est.
40%
0 8535 Stand-by Liquid Control System Actuation Flow Test
=
0 8540 Recirculation Pump Cold Flow and Vibration Test 4-81 1-82 Est.
40%
a 0
8545 Integrated Diesel Generator Synchronizing Test 4-82Est 5-82 Est.
29%
a 10-78 3-82 Est.
46%
l 0
8550 Service Water System and Closed Water Systems Test a
11-78 10-79 Compi.
0 8555 Battery Capacity Test a
0 8570 DC Inverter / Diverter. System Test 10-80 4-82 Est.
81%
j a
4-79 4-81 Compl.
0 8575 Control Rod Drive Hydraulic System Test a
10-79 3-82 Est.
75%
O 8590 Feedwater and Condensate System Test (2 Elements) a l
0 8585 Instrument Air System Test 7-79 2-81 Compl.
a 0
8590 Fire Protection System Test 6-79 442 Est.
75%
0 8595 Flamability Control System (HG)12-81Est 4-82 Est.
0%
/
i t
e i
/
^
Fe:e 3 Il I-J Numb *rs (D:scription & Account Numbers)
Activity Activity Est.
Start *d Complet-d Status 0
8510' Reactor Building Vent System Test CG1E 9-80 5-81 Est.
78%
0 8730 Speical !!uclear Material License Issued CG',E 4-77 7-78 Ccmpi.
l 0
8735 Applicant Sumbits Emergency Plan CCLE 9-75 11-77 Cocpl.
9-75 5-77 Comp 1.
0 8740 Applicant Submits Security Plan CG&E 0
8745 Applicant Submits Quality Assurance Program for Operations CG&E 9-75 12-77 Comp 1.
7-82 Est.
7-82 Est.
0%
l O.
8750 Applicant's Review and Approval of Test Results CG&E 4-77 7-82 Est.
25%
0 8755 Applicant's Preparation of Power Ascension Test Program CG1E 8-75 2 -82 Est.
90 %
0 8805 Install Control Room Consoles and Equipment (2475)(2471) 0 8810 Accumulation of Environnental Data (One (1) or Two (2) Years)
Ccep1.
12-75 5-80 Comp 1.
0 8820 Install and Calibrate riuclear Instrumentation (2474) 8-75 8-78 Compl.
0 8900 Install Pr imary Switchyard CGEE 4-74 6-81 Comp 1.
0 8905 Install Off-Gas Systems (2685) (2462)
I 5-75 2-77 Comp 1.
0 8240 Install Condensate Suction Header to RCIC System (2642) (2634) l 5-71 6-71 Comp 1.
8005 8015 Prepare Site (1100) 8015 8050 Install Reactor Building Foundation (1211) 6-73 10-73 Compl.
10-73 2 -8 2 Est.
91%
Install Drywell and Suppression Chamber and Reactor Pressure Vessel Pedestal (2213) (2411) 8050 8200
! 8055 8325 Construct Reactor Bulding and Integral Structures (1210) 10-73 9-79 Comp 1.
10-73 6-78 Ccep1.
8050 8145 Construct Turbine / Generator Foundation (3514) 8-76 7-78 Comp 1.
8055 8915 Install Off-Gas Stack (2466-3610) 9-73 5-76 Comp 1.
8075 8920 Install Secondary Heat Sinks (Cooling Towers)(3571) 12-73 11-74 Comp 1.
8115-8120 Install Containment Penetraticns (Sleeves in Liner) (2213-3770)
,f k
h a
/
e
[J r -g -
rg Activity Activity Est.
'yI-JNumbers (Description & Account Numbers)
Started Complet?
Status _
J 8140 8275 Install Service Water Intake Structures (1280) 8-74 10-78 Compl.
Install Condenser, Turbine Generator and Piping)(Exclusive of Condensate and 8145 8910 Feedwater Piping (3531) (3511) 8-75 12 Compl.
8150 8285 Install Feedwater and Condensate Water System (2623) (2634) 1-75 5-79 Compi 8155 8445 Install Diesel Generator (2487-5160) 5-76 8-78 Compl.
, -82 Est.
92%
1 7-76 8165 8430 Install Drywell Air Cooler System (2624) 2-75 l'.-7 7 Co :pl.
S175 8180 Install Containment 8iological Shiciding (2213-3750,2740,2720,2730).
8200 8300 Install Reactor Pressure Vessel (00 Site) (2411-5310) 11-75 1-76 Comp 1.
l 8205 8230 Install Recirculating Pu r:p (2412-5110) 9-75 12-78 Compl.
l 8210 8325 Install Main Steam Lines to MSIV 9-75 3-77 t rpl.
8215 8465 Install Control Red Drive System (2414)(2684) 7-75 4-79 Compl.
8220 8440 Install Reactor Internals (2411-5610) 10-75 4-79 Comp 1.
8245 8335 Install Reactor Clean-U;) System Pipe, Fittings & Valves (2643-6540,6640) 2-76 10-78 Compl.
8270 8350 Install RiiR Pipe, Fittings and Valves (2646-6540) 10-75 10-78 Compl.
t 11-72 1-81 Compl.
l.
8275 8470 Install Cnoling Water Ploes and Controls (2621) (WS SYS) 11-75 3-81 Compl.
I 8280 8605 Install Radioactive Waste System and Radiation Monitorinq System (2682)(2686)(2683)(2387)(2685) 8300 8450 Install Piping Connected to Primary System Comoonents (2640) 10-75 5-79 Compl.
3-75 6-8 2Est.
92%
8305 8475 Install Pine Hancers and Restraints All Systems (XXXX-6550,6450,6650,6750,2213,3910) 8310 8315 Install Main Steam Pipe to Turbine Stop Valve (2631) LB Pipe 4-75 5-1-77 Comp 1.
12-76 6-81 Compl.
8450 8500 Initial Flush cf Systems (XXXX,6890) 8500 8515 Perform Reactor Cold Hydrostatic Test 5-78 7-78 Comp 1.
3 3-78 7-8 2 Est.
95%
- 8515 8600 Complete Base Lire Inspecticas CGLE i
w'
,99
(
f 4-
-- ee 2_.---.e-_..;..
rep 5 r
Activity Activity Est.
g j
I-J Nu-bers (Description & Account Nue:bers)
Startvd
'Compl*tt Status 8600 8700 Perform Leak Rate Test CG&E 3-32 Est.
5 -E2 Est.
01 l
6-82 Est.
6-82 Est.
0%
8605 8615 Test Radioactive System and Radiation Monitorino System 5-82 Est.
5-82 Est.
0%
8700 8800 Integrated System Test S-79 S-79 Corpl.
l~
8740 8815 Special Nuclear Material Delivered i
7-82 Est.
7-82 Est.
C j
8800 8950 Applicant Submits Test Results 7-82 Est.
11-82 Est.-
0%
=
8950 8990 Power Ascension
?
I J
I t
I i
e f
]
I t
- 1
/-
e W