ML20039E034

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-329/81-22 & 50-330/81-22 on 810901-1130.No Noncompliance Noted
ML20039E034
Person / Time
Site: Midland
Issue date: 12/23/1981
From: Spessard R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Jackie Cook
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
Shared Package
ML20039E035 List:
References
NUDOCS 8201060449
Download: ML20039E034 (2)


See also: IR 05000329/1981022

Text

7

- - -

-.-

-. - . ..

- - , . .

.

-

h-

_

,

December 23, 1981

8

Docket No. 50-329

Docket No. 50-330

<

Consumers Power Company

RECEtVED

JAN 5 1982> i

ATTN

Mr. James W. Cook

,

Vice Presidene

~

-

I esumsusuursum

'

Midland Project

1945 West Parasil Road

8EEE f 8

Jackson, MI 49201

/

Gentlement

M

This refers to the routine safety inspection conducted by Mr. R. J. Cook of

this office on September 1 - November 30, 1981, of activities at the Midland

Nuclear Power Plant Construction Site authorized by NRC construction Permits

No. CPPR-81 and No. CPPR-82 and-to the discussion of our findings with Mr.

B. W. Marguglio and others of your staff at the conclusion of the inspection.-

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel,

i

No items of noncompliance with NRC requirements were identified during the

course of this inspection.

L

In accordance with 10 CFR 2.790 of the Commission's regulations,; a copy of

l

this letter and the enclosed inspection report will be placed in the NRC's

!:

Public Doctament Room.

If this report contains any information that you

(or your contractors) believe to be exempt from' disclosure under 10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by telephone

!

within ten (10) days from the date of thia letter of your intention to file

l

a request for withholding; and (b) submit within twenty-five (25) days from

!

the date of this letter a written application to this office to withhold

!

such infomation. If your receipt of this letter has been delayed such that

i

less than seven (7) days are available for your review, please. notify this

i

office promptly so that a new due date may be established. Consistent with

[

Section 2.790(b)(1), any seeh application must be accompanied by an affida-

vit. executed by the owner of the information which identifies the document

,

-

or part sought to be withheld, and'which contains a full statement of the

,

reasons which are the bases for the claim that the information should be

.

'

1060$y$999

~

ADO

o

G

eon

ZEo/

.

.mx....g... .Knop, (y....... Ritt.g... . ...

Rm... ..

. ...Cy. . ..

o ,,,c , Rm.

. . . . . . . . . . .

. .

. . . . . . . . . . . . . .

. . . . .

.. gyd. ..h.. .,,. .

Spe,st

.,d .. ,, ,,

. . . . . . . . . . . > . . . . . . . . . .

sunname> .C.99.k.

B

. , , , , , , . . .

. , . . . . , . . . . . . . . . . . . .

. . . . . , . . . . . . . . .

.

. . . . . . .

om> .U/.M/.A1... .. ... Eld /RI.......

. . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . .

. . . . . . . . . . . . . .

. . . . . . . . . . . . . .

_

, NRC FORM 318 @80) NRCM Cao

OFFiClAL RECORD COPY -

. usam mi-mm

. . . - - . -

.-.- -.. ..

.-.-.

-

.-.

.

-

.-

.,

..

Consueners Power Company

withheld from public disclosure. This section further requires the statement .

to address with specificity the considerations listed in 10 CFR 2.790(b)(4).

The information sought to be withheld shall be incorporated as far as possible

into a separate part.of th affidavit.. If we do not hear from you in this

-regard within the specified periods noted above, a copy of this lettar and

'

the enclosed inspection report will be placed in the Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

,

" Original signed by R.L. Spesso,

,

R. L. Spessard, Director

Division of Resident and

Project Inspection

Enclosures

IE Inspection

Reports No. 50-329/81-22

and No. 50-330/81-22

,

cc w/ enc 1:

i

DNB/ Document Control Desk (RIDS)

Resident Inspector, RIII

Ronald Callen, Michigan

Public Service Cn==af asion

Hyron M. Cherry, Chicago

1

i

.

s

!

l

'

r

bl

(

n

.,, .R,UJ,,,,,,

R,I,U, ,,, ,,,, ,,, ,,,, ,, R,1,U,,,,,,,,,,,,,,,

romce > -.BJJJ..

,,,

, , , , , , , , , , , , , , , , , , , ,

, , , , , , , , , , , , , , , , , , , ,

, , , , , , , , , , , , , , , , , , , , , , ,

.ua - e> ..cssg

8,9yA,g,,,,,,,, y,n,9p, ,, ,,,,,,,,,,,,,

s e,e s sa,r,d ,,,,,,,

,,,,,,

,

, , , , , , , , , , , , , , , , , , , , , , , ,

, , , , , , , , , , , , , , , , , , , , , ,

, , , , , , , , , , , , , , , , , . , , , , , ,

,.12/,g ,8,1,,,,,, ,,,,f 3/j,ygg,,,,

om>

, , , , , , , , , , , , , , , , , , , , , , ,

, , , , , , , , , , , , , , , , , , , , , , , ,

, , , , , , , , , , , , , , , , , , , , ,

, , , , , , , , , , , , , , , , , , , , , , , ,

, , , , , , , , , , , , , , , , , , , , , , , ,

NRC FORM 318 00-60) NRCM Ono

OFFICIAL RECORD COPY

usom --sasmo