ML20039D248
| ML20039D248 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 12/14/1981 |
| From: | Robert Lewis NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Parris H TENNESSEE VALLEY AUTHORITY |
| Shared Package | |
| ML20039D249 | List: |
| References | |
| NUDOCS 8112310457 | |
| Download: ML20039D248 (2) | |
See also: IR 05000327/1981037
Text
e//ou)
a
-
DEC 141981
Tennessee Valley Authority
ATTN: Mr. H. G. Parris
-Manager of Power
500A Chestnut' Street Tower II
Chattanooga,-TN 37401
Gentlemen:
Report Nosh 27/81
Subject:
and 50-328/81-46
This refers to the routine safety inspection conducted by Messrs.-G. A. Belisle,
P. E. Fredrickson and P. H. Skinner of this' office on November 16-20, 1981,.
of activities authorized by NRC Operating License Nos. DPR-77 and DPR-79
for the Sequoyah facility and. to the discussion of our findings held with.
Messrs. R. C. Parker, QA Branch Chief, and C. C. Mason, Plant Superintendent,
at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records,. interviews with
personnel,'and observations by the inspectors.
Within the scope of this inspection, no violations or deviations were disclosed.
We have examined actions you have taken with regard to previously identified
enforcement matters and unresolved items. The status of these items is discussed
in the enclosed report.
One new unresolved item resulted from this inspection and is. discussed in the
enclosed report. This item will be examined during subsequent inspections.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure
will be placed in the NRC's Public Document Room unless you notify this office,
by telephone, within ten days of the date of this letter and submit written-
application to withhold information contained therein within thirty doys of the
date of this letter. Such application must be consistent with the requirements
of 2.790(b)(1).
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
S
Sincerely,
f s
p
s
\\
ll5:
'
'
O Olgg
R. C. Lewis, Director
r r; <
Division of Resident and
Ic.
Reactor Project Inspection
,
r
Enclosure: (See page 2)
8112
7 ^310457 8'11
""
- ed
JEot Je
--
.
..
.-
DEC 14 w81
- Tennessee Valley Authority-
2
-
l
I
' Enclosure:
' Inspection Report Nos.
'
50-327/81-37 and 50-328/81-46 -
cc w/ encl:
H. J. Green, Director of Nuclear Power
- G. G. Stack, Project Manager
L
C. C.. Mason, Plant
j,
Superintendent
l
J. F. Cox,, Supervisor, Nuclear
L
Licensing Section
'
M. J. Burzynski, Project Engineer
i
H. N. Culver, Chief, Nuclear Safety
Review Staff
l
-bcc w/ encl:
'
NRC Resident Inspector -
Document Management Branch
State of Tennessee -
.
i
L
go ' {4
,
RII
R
RII
RI
J
R T,I
RII
@$
.pk
k
i
GBelisle:aw
MUpright
CMurphy
J01s nski
Ci
enjak
Clewis
- IT/ /81
)4f" /81
1}//d/81
11/ ./ 1
/f/81
11/7//81
l>l9/1I
(1,lo
(y
-
_
_ _ _ _ _