Forwards IE Insp Rept 50-461/81-29 on 811105-06 & 12-13. No Noncompliance Noted
ML20039C529
Person / Time
Site: Clinton Constellation icon.png
Issue date: 12/15/1981
From: Spessard R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Gerstner W
ILLINOIS POWER CO.
Shared Package
ML20039C530 List:
References
NUDOCS 8112290437
Download: ML20039C529 (2)


See also: IR 05000461/1981029

Text

.

.

DEC 1 5 1981

b

e;

&

s j ,.

Docket No. 50-461

Nc\\-

S

'_\\

.>

..

Illinois Power Company

no

'

q

ATTN:

Mr. W. C. Gerstner

q

1

g g g3p-

d

Executive Vice President

C

,

500 South 27th Street

Jw"

'g

Decatur, IL 62525

h

"U

%

$7] 7,y/

1i

Gentlemen:

c

This refers to the routine safety inspection conducted by Mr. H. M. Wescott

of this office on November 5-6 and 12-13,1981, of activities at the Clinton

Power Station, Unit 1, authorized by NRC Construction Permit No. CPPR-137

and to the discussion of our findings with Mr. C. Hollon and others of your

rtaff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examinat on of procedures and representative records, observations, and

i

interviews with personnel.

No items of noncompliance with h7C requirements were identified during the

course of this inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy

of this letter and the enclosed inspection report will be placed in the

NRC's Public Document Room.

If t'us report contains any information

that you (or your contractors) believe to be exempt from disclosure under

10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-

phone within ten (10) days from the date of this letter of your intention

to file a request for withholding; and (b) submit within twenty-five (25)

days from the date of this letter a written application to this office

to withhold such information.

If your receipt of this letter has been

delayed such that less than seven (7) days are available for your review,

please notify this office promptly s. that a new due date may be estab-

lished.

Consistent with Section 2.790(b)(1), any such application must

be accompanied by an affidavit executed by the owner of the information

which identifies the document or part sought to be withheld, and which

8112290437 811215

DR ADOCK 05000

}

())

_

_

_ _ - . _ - - _ _ _ _ _ _ _ _

-

--

-

--

-

-

-

A

.~.

.

.

Illinois Power Company

-2-

December 15, 1981

contains a full statement of the reasons which are the bases for the

claim that the information should be withheld from public disclosure.

This section further requires the statement to address with specificity

the considerations listed in 10 CFR 2.790(b)(4). The information sought

to be withheld shall be incorporated as far as possible into a separate

part of the affidavit.

If we do not hear from you in this regard within

the specified periods noted above, a copy of this letter and the enclosed

inspection report will be placed in the Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

N0rfgfnsi s!gned by R.L. Spessard"

R. L. Spessard, Director

Division of Resident and

Project Inspection

Enclosure:

Inspection Report

No. 50-461/81-29

cc w/ encl:

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

Mary Jo Murray, Office of

Assistant Attorney General

Gary N. Wright, Manager,

Nuclear Facility Safety

Randall L. Plant, Prairie

Alliance

RIII

RIII

RIII

RII'

f/() /;

C

f$

Wescott/j/g

/'

p

ReiMana

Kno /

Sp>dsard

12/11/81

Cltl[Y

tl[I !b

jdhi

_