ML20039C529
| ML20039C529 | |
| Person / Time | |
|---|---|
| Site: | Clinton |
| Issue date: | 12/15/1981 |
| From: | Spessard R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Gerstner W ILLINOIS POWER CO. |
| Shared Package | |
| ML20039C530 | List: |
| References | |
| NUDOCS 8112290437 | |
| Download: ML20039C529 (2) | |
See also: IR 05000461/1981029
Text
.
.
DEC 1 5 1981
b
e;
&
s j ,.
Docket No. 50-461
Nc\\-
S
'_\\
.>
..
Illinois Power Company
no
'
q
ATTN:
Mr. W. C. Gerstner
q
1
g g g3p-
d
Executive Vice President
C
,
500 South 27th Street
Jw"
'g
Decatur, IL 62525
h
"U
%
$7] 7,y/
1i
Gentlemen:
c
This refers to the routine safety inspection conducted by Mr. H. M. Wescott
of this office on November 5-6 and 12-13,1981, of activities at the Clinton
Power Station, Unit 1, authorized by NRC Construction Permit No. CPPR-137
and to the discussion of our findings with Mr. C. Hollon and others of your
rtaff at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examinat on of procedures and representative records, observations, and
i
interviews with personnel.
No items of noncompliance with h7C requirements were identified during the
course of this inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy
of this letter and the enclosed inspection report will be placed in the
NRC's Public Document Room.
If t'us report contains any information
that you (or your contractors) believe to be exempt from disclosure under
10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-
phone within ten (10) days from the date of this letter of your intention
to file a request for withholding; and (b) submit within twenty-five (25)
days from the date of this letter a written application to this office
to withhold such information.
If your receipt of this letter has been
delayed such that less than seven (7) days are available for your review,
please notify this office promptly s. that a new due date may be estab-
lished.
Consistent with Section 2.790(b)(1), any such application must
be accompanied by an affidavit executed by the owner of the information
which identifies the document or part sought to be withheld, and which
8112290437 811215
DR ADOCK 05000
}
())
_
_
_ _ - . _ - - _ _ _ _ _ _ _ _
-
--
-
--
-
-
-
A
.~.
.
.
Illinois Power Company
-2-
December 15, 1981
contains a full statement of the reasons which are the bases for the
claim that the information should be withheld from public disclosure.
This section further requires the statement to address with specificity
the considerations listed in 10 CFR 2.790(b)(4). The information sought
to be withheld shall be incorporated as far as possible into a separate
part of the affidavit.
If we do not hear from you in this regard within
the specified periods noted above, a copy of this letter and the enclosed
inspection report will be placed in the Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
N0rfgfnsi s!gned by R.L. Spessard"
R. L. Spessard, Director
Division of Resident and
Project Inspection
Enclosure:
Inspection Report
No. 50-461/81-29
cc w/ encl:
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
Mary Jo Murray, Office of
Assistant Attorney General
Gary N. Wright, Manager,
Nuclear Facility Safety
Randall L. Plant, Prairie
Alliance
RIII
RIII
RIII
RII'
f/() /;
C
f$
Wescott/j/g
/'
p
ReiMana
Kno /
Sp>dsard
12/11/81
Cltl[Y
tl[I !b
jdhi
_