ML20039C430
| ML20039C430 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 12/11/1981 |
| From: | Starostecki R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | J. J. Barton METROPOLITAN EDISON CO. |
| Shared Package | |
| ML20039C431 | List: |
| References | |
| NUDOCS 8112290340 | |
| Download: ML20039C430 (3) | |
See also: IR 05000320/1981017
Text
_.
_ _ _ _ _ _ _ _ _
,
,
/
.
cf
.a
- EP
@
@
M
M
M
"
_
sj
,-
.
-
,s
DEC 11193I
-
Docket No. 50-320
jeg
%
t,
Metropolitan Edison Company
't
ATTN: Mr. J. J. Barton
0
RECEIVED
Acting Director of THI-2
+
-
P.O. Box 480
g
DECg 81S61 =- 9
Middletown, Pennsylvania 17057
- e g names
Gentlemen :
%
Subject: Inspection 50-320/81-17
This refers to the routine safety inspection conducted by Mr. R. Conte
of this office on September 27, 1931 , through ilovember 14,1981, of
activities authorized by flPC License DPR-73 and to the discussions of
our findings held by Mr. Conte with !!r. L. King of your staff at the
conclusion of the inspection.
Areas examined during this inspection are described in the Office of
Inspection and Enforcement Inspection Report which is enclosed with this
letter. Within these areas, the inspection consisted of selective
examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Based on the results of this inspection, it appears that one of your
activities was not conducted in full compliance with MRC requirements,
as set forth in the Notice of Violation, enclosed herewith as Appendix A.
This item of noncompliance has been categorized into the levels described
in the Federal Register flotice (45 FR 56754) dated October 7,1930.
This notice is sent to you pursuant to the provisions of Section 2.201
of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal
Regulations. Although Section 2.201 requires you to submit to this
office, within 25 days of your receipt of this notice, a written statement
of explanation, we note that this item of noncompliance was corrected
prior to the completion of our inspection, and therefore, no response
with respect to this matter is required.
In accordance with 10 CFR 2.790 of the Coranission's regulations, a copy
of this letter and the enclosures will be placed in the NRC's Public
Document Room.
If this report contains any information that you (or
your contractors) believe to be exempt from disclosure under 10 CFR 9.5(a)(4),
it is necessary that you (a) notify this office by telephone within
M
[tb5
JEC'[
l
8112290340 811211
PDR ADOCK 05000320
ome
O
ppg
S U8t N A V E k
l
DATEk
.
m c reau ais no eomscu 0240
OFFICIAL RECORD COPY
""
- -3 m
,
'
.
.
Hetropolitan Edison Company
-2-
E
i 551
10 days from the date of this letter of your intention to file a request
for withholding; and (b) submit within 25 days from the date of this
letter a written application to this office to withhold such information.
Consistent with section 2.790(b)(1), and such application must be accompanied
by an affidavit executed by the owner of the information which identifies
the document or part sought to be withheld, and which contains a full
statement of the reasons on the basis which it is claimed that the
information should be withheld from public disclosure.
This section
further requires the statement to address with specificity the considerations
listed in 10 CFR 2.790(b)(4).
The information sought to be withheld
shall be incorporated as far as possible into a separate part of the
.iffidavit.
If we do not hear from you in this regard within the specified
periods noted above, the report will be placed in the Public Document
Room. The telephone notification of your intent to request withholding,
or any request for an extension of the 10 day period which you believe
necessary, should be made to the Supervisor, Files. Hail and Records,
USNRC Region I, at (215) 337-5223.
No reply to this letter is required. Your cooperation with us in this
mattar is appreciated.
Sincerely,
?
F
M) {G
Ori;;inni signed By
Richard W. Starostecki, Director
Division of Resident and Project
Inspection
Enclosures :
1.
Appendix A, Hotice of Violation
2.
Office of Inspection and Enforcement Inspection
Report Number 50-320/81-17
cc w/ encl:
L. King, Acting Director, Site Operations
J. E. Larson, Supervisor, THI-2 Licensing
E. G. Wallace, PWR Licensing Manager
J. B. Liberman, Esquire
G. F. Trowbridge, Esquire
Public Document Room (PDR)
local Public Document Room (LPDR) (HSIC)
Nuclear Safety Information Center
NRC Resident Inspector
Commonwealth of Pennsylvania
Ms. Mary V. Southard, Co-Chairman, Citizens for a Safe Environment
(Without Report)
" ' " >
. .. .
.
.
.
.
.
""^"4
.
.
..
.
.
.
.
.
- >
.
..
..
.
.
.
..
. .. .
.. ..... .
..
.
.
.
" " ' ' " " ' ' * " ~ * ' " " " * *
OFFICIAL RECORD COPY
.
.
..
IMetropolitan Edison Company
-3-
.,
DEC 1 1 138I
.
bec w/ encl:
-
Region I Docket Room (w/ concurrence)
L. Barrett, Deputy Program Director, TMI Program Office
Chief, Operational Support Section (wo/ encl)
Ms. Mary V. Southard, Co-Chairman, Citizens for a Safe Environment
-
TliInS
T" IRS
T?i1RS
T!!IoD
DPRI6
0,,,c, p
'RCIsi!Jfs" Il3%j}i< ky'
IaQ3~
'l
-
4
RKef i '
s u ,. ~ . u r )
,,,4 'iM7p/81" ' 12/f/d1"
~1M{/si'
'2/ , m 1"
'Yf/f/61'
""""'"'"'""cu
2'
OFFICIAL RECORD COPY