'DEC 1 5 1981
Docket No. 50-282
Docket No. 50-306
&
W
D
//
Northern States Power Company
.
(e3
ATTN:
Mr. Dennis E. Gilberts
' " ; I ,*e'
I-
..
Senior Vice President
4
'
"
DEC 2g jg3p y
Power Supply
414 Nicollet Mall
y
( 3, .x
'/
Minneapolis, MN 55401
c.
w
. /
Gentlemen:
\\~
mY
-py/
This refers co the routine safety inspection conducted by Messrs.
C. D. Feierabend and B. L. Burgess of this office on November 1-30, 1981,
of activities at the Prairie Island Nuclear Generating Plant, Units 1 and
2, authorized by NRC Operating Licenses No. DPR-42 and No. DPR-60 and to
the discussion of our findings with Mr. Tierney and other members of his
staff at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and in-
terviews with personnel.
No items of noncompliance with NRC requirements were identified during the
course of this inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy
of this letter and the enclosed inspection report will be placed in the
NRC's Public Document Room.
If this report contains any information
that you (or your contractors) believe to be exempt from disclosure under
10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by te'.e-
phone within ten (10) days from the date of this letter of your intention
to file a request for withholding; and (b) submit within twenty-five (25)
days from the date of this letter a written application to this office
to withhold such information.
If your receipt of this letter has been
delayed such that less than seven (7) days are available for your review,
please notify this office promptly so that a new due date may be estab-
lished.
Consistent with Section 2.790(b)(1), any such application must
be accompanied by an affidavit executed by the owner of the information
which identifies the document or part sought to be withheld, and which
8112290232 811215
-7-
j
PDR ADOCK 05000282
-
O
.7 j/}
01
._
_
_
.
.
Northern States Power
-2-
DEC 1 5 1981
Company
contains a full statement of the reasons which are the bases for the
claim that the information should be withheld from public disclosure.
This section further requires the statement to address with specificity
the considerations listed in 10 CFR 2.790(b)(4). The information sought
to be withheld shall be incorporated as far as possible into a separate
part of the affidavit.
If we do not hear from you in this regard within
the specified periods noted above, a copy of this letter and the enclosed
inspection report will be placed in the Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
" Original signed by R.I., Spessard"
R. L. Spessard, Director
Division of Resident and Project
Inspection
Enclosure:
Inpsection Reports
No. 50-282/81-21 and
No. 50-306/81-23
cc w/ encl:
F. P. Tierney, Jr., Plant Manager
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
John W. Ferman, Ph.D., Nuclear