ML20039C328

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-282/81-21 & 50-306/81-23 on 811101-30.No Noncompliance Noted
ML20039C328
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 12/15/1981
From: Spessard R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Gilberts D
NORTHERN STATES POWER CO.
Shared Package
ML20039C329 List:
References
NUDOCS 8112290232
Download: ML20039C328 (2)


See also: IR 05000282/1981021

Text

.

.

'DEC 1 5 1981

Docket No. 50-282

Docket No. 50-306

&

W

D

//

Northern States Power Company

.

(e3

ATTN:

Mr. Dennis E. Gilberts

' " ; I ,*e'

I-

..

Senior Vice President

4

'

"

DEC 2g jg3p y

Power Supply

414 Nicollet Mall

y

( 3, .x

'/

Minneapolis, MN 55401

c.

w

. /

Gentlemen:

\\~

mY

-py/

This refers co the routine safety inspection conducted by Messrs.

C. D. Feierabend and B. L. Burgess of this office on November 1-30, 1981,

of activities at the Prairie Island Nuclear Generating Plant, Units 1 and

2, authorized by NRC Operating Licenses No. DPR-42 and No. DPR-60 and to

the discussion of our findings with Mr. Tierney and other members of his

staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and in-

terviews with personnel.

No items of noncompliance with NRC requirements were identified during the

course of this inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy

of this letter and the enclosed inspection report will be placed in the

NRC's Public Document Room.

If this report contains any information

that you (or your contractors) believe to be exempt from disclosure under

10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by te'.e-

phone within ten (10) days from the date of this letter of your intention

to file a request for withholding; and (b) submit within twenty-five (25)

days from the date of this letter a written application to this office

to withhold such information.

If your receipt of this letter has been

delayed such that less than seven (7) days are available for your review,

please notify this office promptly so that a new due date may be estab-

lished.

Consistent with Section 2.790(b)(1), any such application must

be accompanied by an affidavit executed by the owner of the information

which identifies the document or part sought to be withheld, and which

8112290232 811215

-7-

j

PDR ADOCK 05000282

-

O

PDR

.7 j/}

01

._

_

_

.

.

Northern States Power

-2-

DEC 1 5 1981

Company

contains a full statement of the reasons which are the bases for the

claim that the information should be withheld from public disclosure.

This section further requires the statement to address with specificity

the considerations listed in 10 CFR 2.790(b)(4). The information sought

to be withheld shall be incorporated as far as possible into a separate

part of the affidavit.

If we do not hear from you in this regard within

the specified periods noted above, a copy of this letter and the enclosed

inspection report will be placed in the Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

" Original signed by R.I., Spessard"

R. L. Spessard, Director

Division of Resident and Project

Inspection

Enclosure:

Inpsection Reports

No. 50-282/81-21 and

No. 50-306/81-23

cc w/ encl:

F. P. Tierney, Jr., Plant Manager

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

John W. Ferman, Ph.D., Nuclear

Engineer, MPCA

i

RIII a

RIII'.

RIIIs/

RI -

RII

l li,G/f

7elIflkerabendf;

'

  • '

'

egfreeter

Sp ssard

/ Burgess /so

Lit e

12/14/81

j&

A

17 ff

i

-

i

.

-

- -

- - -

-

-

-

- -

-

-

-