Forwards IE Insp Repts 50-518/81-19,50-519/81-19, 50-520/81-19 & 50-521/81-19 on 811117-20.No Noncompliance Noted
ML20039B751
Person / Time
Site: Hartsville  Tennessee Valley Authority icon.png
Issue date: 12/02/1981
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML20039B752 List:
References
NUDOCS 8112230520
Download: ML20039B751 (2)


See also: IR 05000518/1981019

Text

e

,\\

f

. .....

,

q.

W

-

DEC 0 2 1981

3

g

&

03

lig

'*'

-

g

Qg8 %4

'

'

.;

/

-

Tennessee Valley Authority

p %g

87g8LA

'

r

__

o

ATTN:

Mr. H. G. Parris

'-

4

4g$pdj6p

N

%

-

Manager of Power

.

C

500A Chestnut Street Tower II

' '

S

cd

-

_

Chattanooga, TN 37401

-

/

l'

~ ' '

p

Gentlemen:

.

Report Nos@-518/8% 50-519/81-(9, 50-520/81-19 and 50-521/81-19

Subject:

.

This refers to the routine safety inspection. conducted $yMr!A.B.Ruffofthis

office on November 17-20,

T

1981, of activit es authorited by NRC Construction

Permit Nos.' CPPR-150, CPPR-151, CPPR-152 and CPPR2153 for the Hartsville facility

and to the discussion of our findings held witp Mr. -R.

T. Hathcote, Project

Manager, at the conclusion of the inspection.

,

~

Areas examined during the inspection and our finding's are discussed in the.

enclosed inspection report.

Within. these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no ;iolations or deviations were disclosed.

We have examined actions you have taken, with regard to previously reported

unresolved items. The status of these items 1.s discussed in the eaclosed inspec-

tion report.

"

,

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure (s)

will be placed in the NRC's Public Document Room unless you notify this office,

by telephone, within ten days of the date of' this . letter and submit written

application to withhold information contained therein within thirty days of the

date of this letter. Such application must be consistent with the requirements

>

'

of 2.790(b)(1).

Should you have any questions concerning this letter, we will be glad to discuss

them with you,

i

Sincerely,

s/

R. C. Lewis, Director

Division of Resident and

Reactor Project Inspection

Enclosure:

See Page 2

f

8112230520 811GIO2

PDR ADOCK 05000518

- PDR

j

-

L

,;

e

-

Tennessee Valley Authority

2

'

-

.

Enclosure:

Inspection Report Nos. 50-518/81-19,

50-519/81-19, 50-520/81-19 and 50-521/81-19

cc w/ encl:

H. J. Green, Director of Nuclear Power

R. T. Hathcote, Project Manager

J. F. Cox, Supervisor, Nuclear

Licensing Section

J. E. Wills, Project Engineer

H. N. Culver, Chief

Nuclear Safety Review Staff

bcc w/ encl:

NRC Resident Inspector

Document Management Branch

State of Tennessee

.

  1. f

4

4

+p

v

$

+

[r

RII

RII

RII

R

RII

RII

ABR

ht

T$ n1 n

C$

JA0

nski

RBu h

Clewi

/k

11/f /8

p/2

1

11/ 1/81

11 ,/81

11 #/ /81

/

7

p[z/s

.

)