e
,\\
f
. .....
,
q.
W
-
DEC 0 2 1981
3
g
&
03
lig
'*'
-
g
Qg8 %4
'
'
.;
/
-
Tennessee Valley Authority
p %g
87g8LA
'
r
- __
o
ATTN:
Mr. H. G. Parris
'-
4
4g$pdj6p
N
%
-
Manager of Power
.
C
500A Chestnut Street Tower II
' '
S
cd
-
_
Chattanooga, TN 37401
-
/
l'
~ ' '
p
Gentlemen:
.
Report Nos@-518/8% 50-519/81-(9, 50-520/81-19 and 50-521/81-19
Subject:
.
This refers to the routine safety inspection. conducted $yMr!A.B.Ruffofthis
office on November 17-20,
T
1981, of activit es authorited by NRC Construction
Permit Nos.' CPPR-150, CPPR-151, CPPR-152 and CPPR2153 for the Hartsville facility
and to the discussion of our findings held witp Mr. -R.
T. Hathcote, Project
Manager, at the conclusion of the inspection.
,
~
Areas examined during the inspection and our finding's are discussed in the.
enclosed inspection report.
Within. these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no ;iolations or deviations were disclosed.
We have examined actions you have taken, with regard to previously reported
unresolved items. The status of these items 1.s discussed in the eaclosed inspec-
tion report.
"
,
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure (s)
will be placed in the NRC's Public Document Room unless you notify this office,
by telephone, within ten days of the date of' this . letter and submit written
application to withhold information contained therein within thirty days of the
date of this letter. Such application must be consistent with the requirements
>
'
of 2.790(b)(1).
Should you have any questions concerning this letter, we will be glad to discuss
them with you,
i
Sincerely,
s/
R. C. Lewis, Director
Division of Resident and
Reactor Project Inspection
Enclosure:
See Page 2
f
8112230520 811GIO2
PDR ADOCK 05000518
- PDR
j
-
L
,;
e
-
Tennessee Valley Authority
2
'
-
.
Enclosure:
Inspection Report Nos. 50-518/81-19,
50-519/81-19, 50-520/81-19 and 50-521/81-19
cc w/ encl:
H. J. Green, Director of Nuclear Power
R. T. Hathcote, Project Manager
J. F. Cox, Supervisor, Nuclear
Licensing Section
J. E. Wills, Project Engineer
H. N. Culver, Chief
Nuclear Safety Review Staff
bcc w/ encl:
NRC Resident Inspector
Document Management Branch
State of Tennessee
.
- f
4
4
+p
v
$
+
[r
RII
RII
RII
R
RII
RII
ABR
- ht
T$ n1 n
C$
JA0
nski
RBu h
Clewi
/k
11/f /8
p/2
1
11/ 1/81
11 ,/81
11 #/ /81
/
7
p[z/s
.
)