Forwards IE Insp Repts 50-413/81-26 & 50-414/81-26 on 811102-06.No Noncompliance Noted
ML20039B627
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 12/01/1981
From: Kellogg P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
Shared Package
ML20039B628 List:
References
NUDOCS 8112230323
Download: ML20039B627 (2)


See also: IR 05000413/1981026

Text

P

'

L,h?vd

'

DEC - 11981

co

'-y

c3

'/

Duke Power Company

Sf

4

ATTN:

Mr. W. O. Parker, Jr.

7

RECEDED

-

Vice President, Steam Production

D

iQ :DEC 221981531

P. O. Box 2178

Charlotte, NC 28242

A t mum em:x is

A

Ci&.T V;hCDill

':n

A

ru:

Ap

Gentlemen:

g

Subject: Report Nos. 0-413/81-2fLand 50-414/81-26

b

This refers to the routine safety inspection conducted by Mr. J. L. Coley of this

office on November 2-6, 1981, of activities authorized by NRC Construction Permit

Nos. CPPR-116 and CPPR-117 for the Catawba facility and to the discussion of our

findings held with Mr. S. W. Dressler, Senior Construction Engineer, at the

conclusion of the inspection.

Areas examined during the inspection c.d our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope oi this inspection, no violations or deviations were disclosed.

We have examined actions you have taken with regard to previously reported

unresolved items. The status of these items is discussed in the enclosed inspec-

tion report.

One new unresolved item resulted from this inspection and is discussed in the

enclosed report. This item will be examined during subsequent inspections.

In accordance wito 10 CFR 2.790(a), a cepj of this letter and the enclosure (s)

will be placed in the NRC's Public Documcr.c Room unless you notify this office,

by telephone, within ten days of the date of this letter and submit written

application to withhold information contained therein within thirty days of the

date of this letter.

Such application must be consistent with the requirements

of 2.790(b)(1).

Should you nave any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

by+;nI

Paul J. Kellogg, Chief

Reactor Projects Branch 2

Division of Resident and

Reactor Project Inspection

Enclosure:

See Page 2

0$bbhfjg

PDR

{Go{

1

s

.

- _ - _

.

.

Duke Power Company

2

DEC - 1 1981

Enclosure:

Inspection Report Nos. 50-413/81-26

and 50-414/81-26

cc w/ encl:

J. W. Hampton, Station Manager

J. C. Rogers, Project Manager

bcc w/ encl:

NRC Resident Inspector

bec w/ encl:

Document Management Branch

State of North Carolina

RII

RII

RII

RII

RII

I)CEM

AIg a onis

1

g

JL 1 y:ht

ARH

t

py

11//2/81

11/p /81

11/y/81

M/c//81

1p / /81

12

. .