Text
I
1:- n-el
.
,
i
I
,
Docket flo. 50-293
DEC 0,11981
co
p
9
.
CElVED $
Boston Edison Company it/C fluclear
p
DEC22 b it
~
ATT!!: !!r. A. V. !!orisi
~~e
!Iuclear Operations Support !!anager
u mn.o @_.sp
800 Boylston Street
3
Ac
s
Boston,!!assachusetts 02199
6
NC
,
Gentlemen:
Si[i
Subject:
Inspection 50-293/81-31
This refers to the routine inspection conducted by fir. J. Johnson of this
office on October 1-31, 1981 at the Pilgrim Station, Plymouth, !!assachusetts
of activities authorized by fiRC License flo. DPR-35 to the discussions
of our findings held by !!r. Johnson with ftr. R. !tachon and 11r. C. I4athis and
others of your staff periodically during the inspection.
Areas examined during this inspection are described in the Office of Inspection
and Enforcement Inspection Report which is enclosed with this letter.
liithin these areas, the inspection consisted of selective examinations of
procedures and representative records, interviews with personnel, and
observations by the inspector.
!!ithin the scope of this inspection, no items of noncompliance were observed.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosed inspection report will be placed in the' T1RC's
public Document Room.
If this report contains any information that you (or
your contractors) believe to be exempt from disclosure under 10 CFR 9.5(a)(4),
it is necessary that you (a) notify this office by telephone within ten
(10) days from the date of this letter of your intention to file a request
for withholding; and (b) submit within 25 days from the date of this letter
'j
a written application to this office to withhold such information. Con-
sistent with section 2.790(b)(1), any such application must be accompanied
by an affidavit executed by the owner of the information which identifies
the document or part sought to be withheld, and which contains a full
statement of the reasons on the basis which it is clained that the information
should be withheld frum public disclosure. This section further requires
the statement to. address with specificity the considerations listed in the 10 CFR2.790(b)(4). The information sought to be withheld shall be incorporated
as far as possible into a separate part of the affidavit.
If we do not
hear from you in this regard within the specified periods noted above, the
report will be placed in the Public Docunent Room. The telephone notification
of your intent to request withholding, or any request for an extension of
the 10 day period which you believe necessary, should be made to the
% ol
Supervisor, Files,ItailandRecords,USi1RCRegionI,at(215)337-5223.
5
ih
0FFICIAL RECORD COPY
0$000
3
,
5
RDR.
y
-
~_
.
.
'k
,
l.
Boston Edison Company 11/C fluclear
2-
1
Ilo reply to this letter is required.
Your cooperation..with us in this matter
,
is appreciated.
..
Sincerely,
kisinal Signed BY:
ETdon J. Brunner, Chief, Projects
Branch !1,' Division of Ftesident
and Project Inspection
'
Enclosure: Office of Inspection and Enforcement
Inspection Report flumber 50-295/81-31
cc w/ enc 1:
ih D. !!achon, !!uclear Operations l'anager - Pilgrim Station -
PublicDocumentRoom(PDR)
local Public Document Room (LPDR)
liuclear Safety Information ~ Center (flSIC)
I'RC Resident Inspector
Corronwealth of ;;assachusetts -(2)
bcc w/ enc 1:-
Region I Docket Room (with concurrences)
Chief, Operational Support Section (w/o encis)
I
DRPI
DRPI R
G
II
J. J nson
. Elsasser
runner
.
11/24/81
11/3a/81
11/
'Cl
'
17 / S/
0FFICIAL RECORD COPY.
i
i
'-