Forwards IE Insp Rept 50-293/81-31 on 811001-31.No Noncompliance Noted
ML20039B563
Person / Time
Site: Pilgrim
Issue date: 12/01/1981
From: Brunner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Morisi A
BOSTON EDISON CO.
Shared Package
ML20039B564 List:
References
NUDOCS 8112230239
Download: ML20039B563 (2)


See also: IR 05000293/1981031

Text

I

1:- n-el

.

,

i

I

,

Docket flo. 50-293

DEC 0,11981

co

p

9

.

CElVED $

Boston Edison Company it/C fluclear

p

DEC22 b it

~

ATT!!: !!r. A. V. !!orisi

~~e

!Iuclear Operations Support !!anager

u mn.o @_.sp

800 Boylston Street

3

Ac

s

Boston,!!assachusetts 02199

6

NC

,

Gentlemen:

Si[i

Subject:

Inspection 50-293/81-31

This refers to the routine inspection conducted by fir. J. Johnson of this

office on October 1-31, 1981 at the Pilgrim Station, Plymouth, !!assachusetts

of activities authorized by fiRC License flo. DPR-35 to the discussions

of our findings held by !!r. Johnson with ftr. R. !tachon and 11r. C. I4athis and

others of your staff periodically during the inspection.

Areas examined during this inspection are described in the Office of Inspection

and Enforcement Inspection Report which is enclosed with this letter.

liithin these areas, the inspection consisted of selective examinations of

procedures and representative records, interviews with personnel, and

observations by the inspector.

!!ithin the scope of this inspection, no items of noncompliance were observed.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the' T1RC's

public Document Room.

If this report contains any information that you (or

your contractors) believe to be exempt from disclosure under 10 CFR 9.5(a)(4),

it is necessary that you (a) notify this office by telephone within ten

(10) days from the date of this letter of your intention to file a request

for withholding; and (b) submit within 25 days from the date of this letter

'j

a written application to this office to withhold such information. Con-

sistent with section 2.790(b)(1), any such application must be accompanied

by an affidavit executed by the owner of the information which identifies

the document or part sought to be withheld, and which contains a full

statement of the reasons on the basis which it is clained that the information

should be withheld frum public disclosure. This section further requires

the statement to. address with specificity the considerations listed in the 10 CFR2.790(b)(4). The information sought to be withheld shall be incorporated

as far as possible into a separate part of the affidavit.

If we do not

hear from you in this regard within the specified periods noted above, the

report will be placed in the Public Docunent Room. The telephone notification

of your intent to request withholding, or any request for an extension of

the 10 day period which you believe necessary, should be made to the

% ol

Supervisor, Files,ItailandRecords,USi1RCRegionI,at(215)337-5223.

5

ih

0FFICIAL RECORD COPY

0$000

3

,

5

RDR.

y

-

~_

.

.

'k

,

l.

Boston Edison Company 11/C fluclear

2-

1

Ilo reply to this letter is required.

Your cooperation..with us in this matter

,

is appreciated.

..

Sincerely,

kisinal Signed BY:

ETdon J. Brunner, Chief, Projects

Branch !1,' Division of Ftesident

and Project Inspection

'

Enclosure: Office of Inspection and Enforcement

Inspection Report flumber 50-295/81-31

cc w/ enc 1:

ih D. !!achon, !!uclear Operations l'anager - Pilgrim Station -

PublicDocumentRoom(PDR)

local Public Document Room (LPDR)

liuclear Safety Information ~ Center (flSIC)

I'RC Resident Inspector

Corronwealth of ;;assachusetts -(2)

bcc w/ enc 1:-

Region I Docket Room (with concurrences)

Chief, Operational Support Section (w/o encis)

I

DRPI

DRPI R

G

II

J. J nson

. Elsasser

runner

.

11/24/81

11/3a/81

11/

'Cl

'

17 / S/

0FFICIAL RECORD COPY.

i

i

'-