ML20039B547
| ML20039B547 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 12/02/1981 |
| From: | Kellogg P NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | John Miller GEORGIA POWER CO. |
| Shared Package | |
| ML20039B548 | List: |
| References | |
| NUDOCS 8112230224 | |
| Download: ML20039B547 (2) | |
See also: IR 05000424/1981011
Text
_ _ _ _ _ _ _ . ._
_-
_____ -
,
. . -
. -
D
'f,'M
MC 0 2 1981
t--
co
9
Ch
ATTN:
Mr. J. H. Miller, Jr.
O
NEcgfYED
Georgia Power Company
C
gECg
Executive Vice President
m
H.
g OOI
270 Peachtree Street
{h
g,
gg.A. 8
7
Atlanta, GA 30303
fx(T1.g@
Gentlemen:
'r6 I
Subject: Report Nos@.424/8 hand 50-425/81-11.
.
This refers to the routine safety inspection conducted by Mr. J. R. Harris of
this office on November 3-6, 1981,'of activities authorized by NRC Construction
Permit Nos. CPPR-108 and CPPR-109 for the Vogtle facility and to the discussion
of our findings held with Mr. R. R. Allen, Assistant Project Manager, at.the
conclusien of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with-
personnel, and observations by the inspector.
Within the scope of this inspection, no violations or deviations were disclosed.
We have examined actions you have taken with regard to previously identified
enforcement matters. These are discussed in the enclosed ins'pection report.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure (s)
will be placed in the NRC's Public Document Room unless you notify this office,
by telephone, within ten days of the date of this letter and submit written
application to withhold information contained therein within thirty days of the
date of this letter. Such application must be consistent with the requirements
of 2.790(b)(1).
Should jou have any questions concerning this letter, we will-be glad to discuss
them with you.
Sincerely,
'
/7d c.
Paul J. Kellogg, Chief
Reactor Projects Branch 2
Division of Resident and
Reactor Project Inspection
Enclosure: See Page'2
8112230224 8112U2
PDRADOCK05000g
Scoty
~
.
.
.
C
.
0 2 gggg
Georgia Power Company
2
Enclosure:
Inspection Report Nos. 50-424/81-11
and 50-425/81-11
cc w/ encl:
H. H. Gregory, III, Construction
Project Manager
E. D. Groover, QA Site Supervisor
D. O. Foster, Project General Manager
bcc w/ encl:
Document Management Branch
State of Georgia
b
SJ
R e.s t
RII
RII
Rll
RI
RII
n
[A'Y
fplf
tv
/
WV
[jJEConibn
CEMurphy
V ownlee
PJKellogg
RHarris:ht
11// /81
11/f /81
11//1/81
11/[ /81
11/ /81
I% I