ML20039B547

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-424/81-11 & 50-425/81-11 on 811103-06.No Noncompliance Noted
ML20039B547
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 12/02/1981
From: Kellogg P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: John Miller
GEORGIA POWER CO.
Shared Package
ML20039B548 List:
References
NUDOCS 8112230224
Download: ML20039B547 (2)


See also: IR 05000424/1981011

Text

_ _ _ _ _ _ _ . ._

_-

_____ -

,

. . -

. -

D

'f,'M

MC 0 2 1981

t--

co

9

Ch

ATTN:

Mr. J. H. Miller, Jr.

O

NEcgfYED

Georgia Power Company

C

gECg

Executive Vice President

m

H.

g OOI

270 Peachtree Street

{h

g,

gg.A. 8

7

Atlanta, GA 30303

fx(T1.g@

Gentlemen:

'r6 I

Subject: Report Nos@.424/8 hand 50-425/81-11.

.

This refers to the routine safety inspection conducted by Mr. J. R. Harris of

this office on November 3-6, 1981,'of activities authorized by NRC Construction

Permit Nos. CPPR-108 and CPPR-109 for the Vogtle facility and to the discussion

of our findings held with Mr. R. R. Allen, Assistant Project Manager, at.the

conclusien of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with-

personnel, and observations by the inspector.

Within the scope of this inspection, no violations or deviations were disclosed.

We have examined actions you have taken with regard to previously identified

enforcement matters. These are discussed in the enclosed ins'pection report.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure (s)

will be placed in the NRC's Public Document Room unless you notify this office,

by telephone, within ten days of the date of this letter and submit written

application to withhold information contained therein within thirty days of the

date of this letter. Such application must be consistent with the requirements

of 2.790(b)(1).

Should jou have any questions concerning this letter, we will-be glad to discuss

them with you.

Sincerely,

'

/7d c.

Paul J. Kellogg, Chief

Reactor Projects Branch 2

Division of Resident and

Reactor Project Inspection

Enclosure: See Page'2

8112230224 8112U2

PDRADOCK05000g

Scoty

~

.

.

.

C

.

0 2 gggg

Georgia Power Company

2

Enclosure:

Inspection Report Nos. 50-424/81-11

and 50-425/81-11

cc w/ encl:

H. H. Gregory, III, Construction

Project Manager

E. D. Groover, QA Site Supervisor

D. O. Foster, Project General Manager

bcc w/ encl:

Document Management Branch

State of Georgia

b

SJ

R e.s t

RII

RII

Rll

RI

RII

n

[A'Y

fplf

tv

/

WV

[jJEConibn

CEMurphy

V ownlee

PJKellogg

RHarris:ht

11// /81

11/f /81

11//1/81

11/[ /81

11/ /81

I% I