Forwards IE Insp Rept 50-322/81-10 on 810602-05.No Noncompliance Noted
ML20039B475
Person / Time
Site: Shoreham File:Long Island Lighting Company icon.png
Issue date: 07/02/1981
From: Martin J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Pollack M
LONG ISLAND LIGHTING CO.
Shared Package
ML20039B476 List:
References
NUDOCS 8112230096
Download: ML20039B475 (2)


See also: IR 05000322/1981010

Text

____-

_____________ __-_ _____ _

._

_

_

~ ~_ f %jo

UNITED STATES

' *

g

[

g

NUCLEAR REGULATORY COMMISSION

E

REGION I

'

% *.****,d[

631 PARK AVENUE

C

KING OF PRUSSIA, PENNSYLVANIA 19406

Docket No. 50-322

A t 0 2 iss;

Long Island Lighting Company

t-

m

ATTN: Mr. M. S. Pollock

c3

g

Vice President - Nuclear

175 East Old Country Road

RECElyED

C

,

Hicksville, NY 11801

C

-

~

N2 2 1981s :

Gentlemen:

  1. g

11

Subject:

Inspection 50-322/81-10

\\%

$

'

This refers to the routine safety inspection cond

kb

J. Paolino of

this office on June 2-5, 1981 at the Shoreham Nuclear Power Station, Shoreham,

New York of activities authorized by NRC License No. CPPR-95 and to the discussions

of our findings held by Mr. Paolino with Mr. T. F. Gerecke and other members

of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the Office of Inspection

and Enforcement Inspection Report which is enclosed with this letter. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observations by the

inspector.

Within the scope of this inspection, no items of noncompliance were observed.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC's

Public Document Room.

If this report contains any information that you (or

your contractors) believe to be exempt from disclosure under 10 CFR 9.5(a)(4),

it is necessary that you (a) notify this office by telephone within ten (10)

days from the date of this letter of your intention to file a request for

withholding; and (b) submit within 25 days froia the date of this letter a

written application to this office to withhold such information.

Consistent

with section 2.790(b)(1), any such application must be accompanied by an

affidavit executed by the owner of the information which identifies the document

or part sought to be withheld, and which contains a full statement of the

~

reasons on the basis which it is claimed that the information should be withheld

from public disclosure. This section further requires the statement to address

with specificity the considerations listed in 10 CFR 2.790(b)(4).

The information

sought to be withheld shall be incorporated as far as possible into a separate

part of the affidavit.

If we do not hear from you in this regard within the

-6

cg

,

8112230096 81070'2

I

I

PDR ADOCK 05000322

/

G

PDR

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

_ _ _ _

.)

a

Long Island Lighting Company

2

specified periods noted above, the report will be placed in the Public Document-

Room. The telephone notification of your intent to request withholding, or

any request for an extension of the 10 day period which you believe necessary,

should be made to the Supervisor, Files, Mail and Records, USNRC Region I, at

(215) 337-5223.

No reply to this letter is required; however, should you have any questions

concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

fl'

O

omas T.' Mar

Chief, Engineering

/ nspection Branch, Division of

I

f

Engineering and Technical Inspection

Enclosure: Office of Inspection and Enforcement Inspection

Report Number 50-322/81-01

cc w/ enc 1:

J. P. Novarro, project Manager