I
.
.
\\96\\
c a~
,u
c
Docket No. 50-483
Union Electric Company
ATTN:
Mr. Donald F. Schnell
Vice Fresident - Nuclear
Post Office Box 149 - Mail Code 400
St. Louis, MO 63166
Gentlemen:
This refers to the routine safety inspection conducted by Messrs.
J. H. Neisler and M. A. Ring of this office on November 16-20, 1981, of
activities at Callaway Plant, Unit I authorized by NRC Construction Permit
No. CPPR-139 and to the discussion of our findings with Mr. W. H. Weber
and others of your staff at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined
during the inspection. Within these areas, the inspection consisted
of a selective examination of procedures and representative records,
observations, and interviews with personnel.
No items of noncompliance with NRC requiremects were identified during
the course of this inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy
of this letter and the enclosed inspection report will be placed in the
NRC's Public Document Room.
If this report contains any information
that you (or your contractors) believe to be exempt from disclosure under
10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-
phone within ten (10) dap: from the date of this letter of your intention
to file a request for withholding; and (b) submit within twenty-five (25)
days from the date of this letter a written application to this office
to withhold such information.
If your receipt of this letter has been
delayed such that less than seven (7) days are available for your review,
please notify this office promptly so that a new due date may be estab-
lished. Consistent with Section 2.790(b)(1), any such application must
gy \\:,t \\ si::Q +j
--
.
- 9
,
w..m.,
g
g
-
DEC 211931> h
[b
g
e k:r;;;;;s 't tr , ,
w.;u ya a
j
_-
//
8112220697 811209
m. ,
PDR ADOCK 0S000483
%;
-
, ' , ,
,
G
- -
-
.
.
-
- -
-
- -
-
.
-
-
- -
- - - - -
-
- - - -
.
-
. -
-
- - - - -
!
- -
- - .
.
.
Union Electric Company
-2-
be _.ompanied by an affidavit executed by the owner of the information
which identifies the document or part sought to be withheld, and which
contains a full statement of the reasons which are the bases for the
claim that the information should be withheld from public disclosure.
This section further requires the statement to cddress with specificity
the considerations listed in 10 CFR 2.790(b)(,). The information sought
to be withheld shall be incorporated as far as possible into a separate
part of the affidavit.
If we do not hear from you in this regard within
the specified periods noted above, a copy of this letter and the enclosed
inspection report will be placed in the Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
" Original siGncd by R.L. Spessard"
R. L. Spessard, Director
Division of Resident and
Project Inspection
Enclosure:
Inspection
Report No. 50-483/81-26
cc w/ enc 1:
W. H. Weber, Manager
Nuclear Construction
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
Region IV
K. Drey
Ronald Fluegge, Utility
Division, Missouri Public
Service Commission
RIII
RIII
RIII
RII
lif
%
Sp /
Konklin/jp
3acKiw
Streeter
a
12/7/81
G/t/g)
l}
. - -
- - -
.
.