ML20039B286

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Nov 1981
ML20039B286
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 12/09/1981
From: Culver M
FLORIDA POWER CORP.
To:
Shared Package
ML20039B285 List:
References
NUDOCS 8112220493
Download: ML20039B286 (4)


Text

t OPERATING DATA REPORT DOCKET NO.

50-302 DATE 12/9/81 CO.\\!PLETED BY M_u culver TELEPilONE (904) 795-6486 OPERATING STATUS

1. Unit Name:

Crvnen1 Pfvor Unit 3 N I'5

2. Reporting Period:

11/1/81 - 11/30/81

3. Licensed Thermal Power (31W:):

2452

4. Nameplate Rating (Gross 51We):

890

5. Design Electrical Rating (Net 51We):

825

6. 51aximum Dependable Capacity (Gross 51We):

821

7. 5f aximum Dependable Capacity (Net SIWE):

782 S. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.Give Reasons:

N/A

9. Power Level To which Restricted. If Any (Net 51We):

none

10. Reasons For Restrictions. If Any:

none This 5f onth Yr..t o.Date Cumulative

11. Ilours in Reporting Period 720 8016 41376
12. Number Ofliours Reactor Was Critica!

0 5079.05 24963.56

13. Reactor Resene Shutdown flours 0

80.0 12W. U

14. flours Generator On.Line 0

5023.1 24388.48

15. Unit Resene Shutdown flours 0

0 0

16. Gross Thermal Energy Generated (51Wil) 0 11782893.3 54461303
17. Gross Electrical Energy Generated (31Wil) 0 3984489.2 18488420
18. Net Electrical Energy Generated (5thil) 0 3788869 17534439
19. Unit Senice Factor 0.0%

62.66%

58.94%

20. Unit Availability Factor 0.0%

62.66%

58.94%

21. Unit Cap'aclty Factor iUsing SIDC Net) 0. 0 "'

60.44%

54.19%

22. Unit Capacity Factor (Using DER Net) 0.0%

57.29%

51.37%

23. Unit Forced Outage Rate 0.0%

17.29%

26.85%

24. Shutdowns Scheduled Oser Next 6 Slonths (Type. Date.and Duration of Each):

?:/A

25. If Shut Down At End Of Report Period. Estimated Date of Startup:

12/13/81

26. Units in Test Status iPrior to Commercial Operation):

Forecast Achiesed INITIA L CRITICA LITY 1/1!r / 77 INITI AL ELECTRICITY 1/30/77 CO31\\f ERCI AL OPER ATION 3/13/77 h2 493 811215' I

R CK 05000302 PDR

AVERAGE DAILY UNIT POWER LEVEL DOCK T NO.

50-302 UNgy FLCRP-3 DATE 12/9/81 CO\\1PLETED BY

'i.W.

Culver TELEPHONE (904) 795-6486 510NUI Novorbor 1981 DAY AVERAGE DAILY POWER LEVEL DAY A CERAGE DAILY POWER LEVEL (51We Net)

(.\\1We Net)

I n

17 0

2 0

gg 0

0 3

g9 o

0 4

0 70 0

5 21 0

6 22 0

0

(

7 0

23 0

8 74 o

9 0

25 0

10 0

26 o

0 1I 27 0

0 12 0

7g 13 0

29 n

14 0

30 0

0 15 3j 16 0

INSTRUCTIONS On this format.hst the aserage dai!> t. nit po.ser lesel ni N1We Net for each das m the reportmg morvii. Compute to the nearest whole megawatt.

(9/77)

O-O 1

l l

UNIT SilUIDOWNS AND POWER REDUCIlONS DOCK ET No.

50-302 UNII NAME JII'RP-1 DAIE _12/9/81 COMPLETED ity.lidl. Culver REPORT MON 111_ November TELEPilONE (904) 795-6486 "E

m, l 2 3

k y)

Licensee

[-r, hL Cause A Correane lbic c-3?

4

.i s 5 Event a?

E.f Aun.n to 3E E

55;1 Report :

E0 Present Recurrense u

C 81-51 811101 S

720 C

1 N/A ZZ ZZZZZZ Scheduled Refueling Outage.

l 2

3 4

l'. Forced Reason:

Method:

Exhibit G - Instructions S. Schedu!ed A. Equipment Failure (Explain) 1 Manual for Preparation of Data II. Maintenance of Test 2 Manual Scram.

Entry Sheets for Lieernee C-Refuelmg 3 Automatic Scram.

Esent ReporI (EE RI File (NURI G-D-Regulatory Restriction 4-Other ( Explain) 0161) 1'-Operator Training & License Examination F Administratise 5

G-Operational Error (Explain)

Exhibit I Same Source (9/77)

!!-Other ( E xplain )

MONTHLY OPERATIONAL SUISiARY STATDENT DOCKET NO. 50-302 UNIT FLCRP-3 DATE 12/9/81 COMPLETED BY M.W. Culver TELEPHONE (904) 795-6486 MONTH November 1981 SDSIARY STATDENT:

Unit shutdown for refueling all month.

4

.