ML20039A783
| ML20039A783 | |
| Person / Time | |
|---|---|
| Site: | LaSalle |
| Issue date: | 12/04/1981 |
| From: | Spessard R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Reed C COMMONWEALTH EDISON CO. |
| Shared Package | |
| ML20039A784 | List: |
| References | |
| NUDOCS 8112210303 | |
| Download: ML20039A783 (2) | |
See also: IR 05000373/1981041
Text
- pa tttuq'o *
UNITED STATES
1
NUCLEAR REGULATORY COMMISSION
$
E
REGION 111
e
Q
8
799 ROOSEVELT ROAD
%.....o
GLEN ELLYN. ILLINOIS 60137
DEC 4 1981
W@Lll' /(t
\\
M
sf
-
Cy
hdCSYJEO Y
Docket No. 50-373
g
%
&y
OEC.18 igg 4 '
Docket No. 50-374
2
I\\ t:an.:
7
g
%' Cli/7 y
D
Commonwealth Edison Company
j
ATTN:
Mr. Cordell Reed
gx
Vice President
M-NP
f
\\
Post Office Box 767
'v
Chicago, IL 60690
This refers to the routine safety inspection conducted by Mr. H. M. Wescott
of this office on November 3-4, 1981, of activities at LaSalle County Station,
Units 1 and 2, authorized by NRC Construction Permits No. CPPR-99 and CPPR-100
and to the discussion of our findings Mr. W. Donaldson and others of your
staff at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
No items of noncompliance with hTC requirements were identified during
the course of this inspcction.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy
of this letter and the enclosed inspection report will be placed in the
NRC's Public Document Room.
If this report contains any information.
that you (or your contractors) believe to be exempt from disclosure under
10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-
phone within ten (10) days from the date of this letter of your intention
to file a request for withholding; and (b) submit within twenty-five (25)
days from the date of this letter a written application to this office
to withhold such information.
If your receipt of this letter has been
delayed such that less than seven (1) days are available for your review,
please notify this office promptly so that a new due date may be estab-
lished. Consistent with Section 2.790(b)(1), any such application must
be accompanied by an affadavit' executed by the owner of the information
8112210303 0112047
PDR ADOCK 05000373
O
ffs/
-
-
-
- -
-
dk
'
.
Commonwealth Edison Company
-2-
DEC 4 198I
which identifies the document or part sought to be withheld, and which '
contains a full statement of the reasons which are the bases for the
claim that the information should be withheld from public disclosure.
This section further requires the statement to address with specificity
the considerations listed in 10 CFR 2.790(b)(4). The information se,ught
to be withheld shall be incorporated as far as possible into a separate
part of the affadavit.
If we do not hear from you in this regard within
the specified periods noted above, a copy of this letter and the enclosed
inspection report will be placed in the Public Document Room.
We wi.11 gladly discuss any questions you have concerning this inspection.
Sincerely,
" Original signed by R.L. Spessard"
R. L. Spessard, Director
Division of Resident and
Project Inspection
Enclosure:
Inspection Report
No. 50-373/81-41 and No.
50-374/81-19
,
cc w/ enc 1:
Louis 0. DelGeorge, Director
of Nuclear Licensing
L. J. Burke, Site
Construction Superintendent
T. E. Quaka, Quality
Assurance Supervisor
R. H. Holyoak, Station
Superintendent
B.
.B. Si.cphenson, Project Manager
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
Mary Jo Murray, Office of
Assistant Attorney General
RIII
.
RIII
RIII .)
RI I
V
$f
Y
Wescott/j
Reimann
Knop
Spessard
11/25/81
p{f
.
-
. -
.