ML20039A294

From kanterella
Jump to navigation Jump to search
Forwards INPO Evaluation Rept for Facilities
ML20039A294
Person / Time
Site: Haddam Neck, Point Beach  File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 12/08/1981
From: Fay C
WISCONSIN ELECTRIC POWER CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML093430786 List:
References
NUDOCS 8112170021
Download: ML20039A294 (1)


Text

/VM i

l a

Wisconsin Electnc rowra coumr 231 W. MICHIGAN, P.O. BOX 2046. MILWAUKEE, WI 53201 December 8, 1981 FRTNrIPrI.PTNF l Mr. J.

G.

Keppler, Regional Director 2 3

,-.;}

Office of Inspecticn and Enforcement,

- /.,

I.c,

Region III i

U. S.

NUCLEAR REGULATORY COMMISSION M-'

799 Roosevelt Road

/. y;I l

l Glen Ellyn, Illinois 60137

,.[

I i

~

l" :-1[

l

Dear Mr. Keppler:

r m.v INPO EVALUATION POINT BEACH NUCLEAR PLANT For your information I am enclosing a copy of the INPO Evaluation Report of the Point Beach Nuclear Plant.

The evaluation was performed in August and the final report has just been received.

It is the intent of Wisconsin Electric to make a public news release related to this evaluation, as well as distribute to the Public Service Commission of Wisconsin.

With our approval, INPO will also distribute the report in accordance with their Evaluation Release Policy.

Very truly yours, C. W. Fay, D2. rector Nuclear Power Department Enclosure Copy to NRC Resident Inspector

.81121i'OO @

DEC 9 1981-