Forwards IE Insp Repts 50-327/81-33 & 50-328/81-43 on 810909-14 & 1103-06.No Noncompliance Noted
ML20039A232
Person / Time
Site: Sequoyah  
Issue date: 11/23/1981
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML20039A233 List:
References
NUDOCS 8112160394
Download: ML20039A232 (2)


See also: IR 05000327/1981033

Text

_

i.

, - . . . *

Q\\W

'

NOV 2 31981

@

~ ,,

,

?

S.

1

i

n

l9 kg /

[ . [0

-Tennessee Valley Authority

j<

-

ATTN:

Mr. H. G. Parris

il%'eQ,,,%g,}.

Manager of Power

/

)

500A Chestn'ut Street Tower II

A_

%

//.

Chattanooga, TN 37401

b,

'${

/h

Gentlemen:

/D

'

Subject: Report No@-327/81

and 50-328/81-43

This refers to the . rcutine safety inspection conducted by Mr. R. L. Fiedler-

,

of this' office on September 9-14 and November 3-6, 1981, of activities authorized

by NRC Operating License Nos. DPR-77 and DPR-79 for the Sequoyah iacility and to -

the' discussion of our findings held with Mr. J. M. McGrif f, Assistant Plant

Superintendent, .at the conclusion of the inspection.

'

Areas examined during the inspection and our findings are discussed in the -

enclosed inspection _ report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspectors.

Within the scope of this inspection, no violations or deviations were disclosed.

We have examined actions you have taken with regard to previously identified

enforcement-matters. These are discussed in the enclosed inspection report.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure (s)

will'be placed in the NRC's Public Document Room unless you notify this office,

'by telephone, within ten days of the date of thit letter and submit written

application to withhold information contained therein within thirty days of-the

date of this letter. Such application must be consistent with the requirements

of 2.790(b)(1).

Should you have any questions concerning this letter,'we will be glad to discuss

them with you.

Sincerely,

4/

R. C. Lewis, Director

Division of Resident and

Reactor Project Inspection .

. Enclosure:

See Page 2

1

84426160pffl

~

ggoth

,

'

,

. --

,,

.

NOV i 31981

Tennessee Valley Authority

2

-

Enclosure:

Inspection Report Nos. 50-327/81-33

and 50-328/81-43

cc wrencl:

H. J. Green, Director of Nuclear Power

G. G. Stack, Project Manager

~

C. C. Mason, Plant

Superintendent

J. F. Cox, Supervisor, Nuclear

Licensing Section

_~

M. J. Burzynski, Project Engineer

,

-- .'

H. N. Culver, Chief, Nuclear Safety

-

Review Sttf f

.,

bec w/ encl:

-

'

NRC Resident Inspector

Document Minagement Branch

'

State of Tennessee

-

. _

-

w

t

Jm-

~

..

'

-

-

,

-

s

-

%

_

RII

RII

RII

RII

RII

RI

kV

$'dMldler:ht'Q/W//f s-

j,1}{

@

RLFie

FJape

CEMurphy

J

shinski

RCrl

jak

R Lewis

11/15/81

11//h'81

11/)f/81

1 /19 /8 1

11/ c/81

11/g81

2

_

.

g

.(

-

'

,

,