Text
,
-
,J
)IeJIoch
-
OCT 3 0 1981
Virginia Electric and Power Company
ATTN: Mr. R. H. Leasburg, Vice President
Nuclear Operations
P. O. Box 26666
Richmond, VA 23261
Gentlemen:
Subject:
Report Nos.k3_8/81-2hnd 50-339/81-22
This refers to the routine safety inspection conducted by Mr. fi. B. Shymlock of
this office on September 6 - October 5,1981, of activities authorized by NRC
Operating License Nos. NPF-4 and NPF-7 for the North Anna facility.
Our pre-
liminary findings were discussed with Mr. W. R. Cartwright, Plant flanager, at the
conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
During the inspection, it was found that certain activities under your license
appear to violate NRC requirements.
This item and references to pertinent
requirements are listed in the Notice of Violation enclosed herewith as
Appendix A.
Elements to be included in your response are delineated in
Appendix A.
We have examined actions you have taken with regard to previously identified
enforcement matters. These are discussed in the enclosed inspection report.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this
letter and the enclosed report will be placed in the NRC's Pubiic Document Room.
If the report contains any information that you believe to be exempt from dis-
closure under 10 CFR 9.5(a)(4), it is necessary that you:
(a) notify this office
by telephone within ten days from the date of this letter of your intention to
file a request for withholding; and (b) submit within twenty-five days from the
date of this letter a written application to this office to withhold such infor-
ma tion.
If your receipt of this letter has been delayed such that less than
seven days are available for your review, please notify this office promptly so
that a new due date may be established. Consistent with section 2.790(b)(1),
such application must be accompanied by an affidavit executed by the owner of the
information which identifies the document or part thereof sotght to be withhe'd,
and a full statement of the reasons on the basis of which it is claimed that the
information should be withheld from public disclosure.
This section further
811216 0 T7 [
e
-
-
..
.r*
.
Virginia -Electric and Power Company
2
ET 3 0 1981
requires the statement to address with specificity the considerations listed in
The information sought to be withheld shall be incorporated
as far as possible into a-separate part of the affidavit.
If we do not hear from
you in this regard within the specified periods noted above, the report will be
placed in the Public Document Room.
Should you have any questions concerning this letter, we will be glad to discuss
them with you. -
Sincerely,
N
Paul J. Kellogg, Chief
Reactor Projects Branch 2, Division of
i
Resident and Reactor Project
Inspection
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report Nos. 50-338/81-22
and 50-339-81-19
cc w/ encl:
J. H. Ferguson, Executive
Vice President
W. R. Cartwright, Station 11anager
bcc w/ encl:
NRC Resident Inspector
Document flanagement Branch
Commonwealth of Virginia
RII:RRP
RII:RRPI
RII:RRP
RII: R
h
li'
ock:gr
HDance
KLa is
PJKe ogg
.
i
10/
81
10h') /81
10/d/81
10/g81
er
yr-
F