Forwards IE Insp Repts 50-338/81-25 & 50-339/81-22 on 810906-1005 & Notice of Violation
ML20039A217
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 10/30/1981
From: Kellogg P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Leasburg R
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
Shared Package
ML20039A208 List:
References
NUDOCS 8112160373
Download: ML20039A217 (2)


See also: IR 05000338/1981025

Text

,

-

,J

)IeJIoch

-

OCT 3 0 1981

Virginia Electric and Power Company

ATTN: Mr. R. H. Leasburg, Vice President

Nuclear Operations

P. O. Box 26666

Richmond, VA 23261

Gentlemen:

Subject:

Report Nos.k3_8/81-2hnd 50-339/81-22

This refers to the routine safety inspection conducted by Mr. fi. B. Shymlock of

this office on September 6 - October 5,1981, of activities authorized by NRC

Operating License Nos. NPF-4 and NPF-7 for the North Anna facility.

Our pre-

liminary findings were discussed with Mr. W. R. Cartwright, Plant flanager, at the

conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

During the inspection, it was found that certain activities under your license

appear to violate NRC requirements.

This item and references to pertinent

requirements are listed in the Notice of Violation enclosed herewith as

Appendix A.

Elements to be included in your response are delineated in

Appendix A.

We have examined actions you have taken with regard to previously identified

enforcement matters. These are discussed in the enclosed inspection report.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this

letter and the enclosed report will be placed in the NRC's Pubiic Document Room.

If the report contains any information that you believe to be exempt from dis-

closure under 10 CFR 9.5(a)(4), it is necessary that you:

(a) notify this office

by telephone within ten days from the date of this letter of your intention to

file a request for withholding; and (b) submit within twenty-five days from the

date of this letter a written application to this office to withhold such infor-

ma tion.

If your receipt of this letter has been delayed such that less than

seven days are available for your review, please notify this office promptly so

that a new due date may be established. Consistent with section 2.790(b)(1),

such application must be accompanied by an affidavit executed by the owner of the

information which identifies the document or part thereof sotght to be withhe'd,

and a full statement of the reasons on the basis of which it is claimed that the

information should be withheld from public disclosure.

This section further

811216 0 T7 [

e

-

-

..

.r*

.

Virginia -Electric and Power Company

2

ET 3 0 1981

requires the statement to address with specificity the considerations listed in

10 CFR 2.790(b)(4).

The information sought to be withheld shall be incorporated

as far as possible into a-separate part of the affidavit.

If we do not hear from

you in this regard within the specified periods noted above, the report will be

placed in the Public Document Room.

Should you have any questions concerning this letter, we will be glad to discuss

them with you. -

Sincerely,

N

Paul J. Kellogg, Chief

Reactor Projects Branch 2, Division of

i

Resident and Reactor Project

Inspection

Enclosures:

1.

Appendix A, Notice of Violation

2.

Inspection Report Nos. 50-338/81-22

and 50-339-81-19

cc w/ encl:

J. H. Ferguson, Executive

Vice President

W. R. Cartwright, Station 11anager

bcc w/ encl:

NRC Resident Inspector

Document flanagement Branch

Commonwealth of Virginia

RII:RRP

RII:RRPI

RII:RRP

RII: R

h

li'

ock:gr

HDance

KLa is

PJKe ogg

.

i

10/

81

10h') /81

10/d/81

10/g81

er

yr-

F