ML20039A102

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-327/81-36 & 50-328/81-45 on 810909-1005 & Notice of Violation
ML20039A102
Person / Time
Site: Sequoyah  
Issue date: 10/27/1981
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML20039A090 List:
References
NUDOCS 8112160232
Download: ML20039A102 (2)


See also: IR 05000327/1981036

Text

--

-

Y < Was

.

.

.

.

.

.

OCT 271981

Tennessee Valley Authority

ATTN: tir. H. G. Parris

fianager of Power

500A Chestnut Street Tower II

Chattanooga, TN 37401

Gentlemen:

Subject: Report Nos. @ 7/81-36 ap 50-328/81-45

This refers to the routine safety inspection conducted by fir. E. J. Ford of this

oirfice on September 6 - October 5,1981, of activities authorized by NRC License

Nos. DPR-77 and DPR-79 for the Sequoyah Nuclear Facility.

Our preliminary

findings were discussed with Mr. C. C. flason, Plant Superintendent, at the

conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspectors.

During the inspection, it was found that certain activities under your license

appear to violate NRC requirements. This item and references to pertinent

requirements are listed in the Notice of Violation enclosed herewith as

Appendix A.

Elements to be included in your response are delineated in

Appendix A.

We have examined actions you have taken with regard to previously reported

unresolved items. The status of these items is discussed in the enclosed report.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this

letter and the enclosed report will be placed in the NRC's Public Document Room.

If the report contains any information that you believe to be exempt from

disclosure under 10 CFR 9.5(a)(4), it is necessary that you:

(a) notify this

office by telephone within ten days from the date of this letter of your

intention to file a request for withholding; and (b) submit within twenty-five

days from the date of this letter a written application to this office to

withhold such information.

If your receipt of this letter has been delayed such

that less than seven days are available for your review, please notify this

office promptly so that a new due date may be established. Consistent with

section 2.790(b)(1), such application must be accompanied by an affidavit

executed by the owner of the information which identifies the document or part

thereof sought to be withheld, and a full statement of the reasons on the basis

of which it is claimed that the information should be withheld from public

disclosure. This section further requires the statement to address with

specificity the considerations listed in 10 CFR 2.790(b)(4).

The information

sought to be withheld shall be incorporated as far as possible into a separate

part of the affidavit.

If we do not hear from you in this regard within the

specified periods noted above, the report will be placed in the Public Document

Room.

O

P

P

G

_-_

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

___

____

.

.

.

Tennessee Valley Authority

2

0CT 2 71981

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

fSf

R. C. Lewis, Director

Division of Resident and

Reactor Project Inspection

Enclosures:

1.

Appendix A, Notice of Violation

2.

Inspection Report Hos. 50-327/81-36

and 50-328/81-45

cc w/ encl:

H. J. Green, Director of Nuclear Power

G. G. Stack, Project flanager

C. C. flason, Plant

Superintendent

J. F. Cox, Supervisor, Nuclear

Licensing Section

ft. J. Burzynski, Project Engineer

H. N. Culver, Chief, Nuclear Safety

Review Staff

bec w/ encl:

NRC Resident Inspector

,

Document fianagement Branch

State of Tennessee

RI :RRP

RI

I

RI

RRPI

'

4v'

-

N

3

E

DQuick

is

RCey/81

10/f,}/81

10/41/81

10

_ - _ - - _ _ _ _ - _ _