Y < Was
.
.
.
.
.
.
OCT 271981
Tennessee Valley Authority
ATTN: tir. H. G. Parris
fianager of Power
500A Chestnut Street Tower II
Chattanooga, TN 37401
Gentlemen:
Subject: Report Nos. @ 7/81-36 ap 50-328/81-45
This refers to the routine safety inspection conducted by fir. E. J. Ford of this
oirfice on September 6 - October 5,1981, of activities authorized by NRC License
Nos. DPR-77 and DPR-79 for the Sequoyah Nuclear Facility.
Our preliminary
findings were discussed with Mr. C. C. flason, Plant Superintendent, at the
conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspectors.
During the inspection, it was found that certain activities under your license
appear to violate NRC requirements. This item and references to pertinent
requirements are listed in the Notice of Violation enclosed herewith as
Appendix A.
Elements to be included in your response are delineated in
Appendix A.
We have examined actions you have taken with regard to previously reported
unresolved items. The status of these items is discussed in the enclosed report.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this
letter and the enclosed report will be placed in the NRC's Public Document Room.
If the report contains any information that you believe to be exempt from
disclosure under 10 CFR 9.5(a)(4), it is necessary that you:
(a) notify this
office by telephone within ten days from the date of this letter of your
intention to file a request for withholding; and (b) submit within twenty-five
days from the date of this letter a written application to this office to
withhold such information.
If your receipt of this letter has been delayed such
that less than seven days are available for your review, please notify this
office promptly so that a new due date may be established. Consistent with
section 2.790(b)(1), such application must be accompanied by an affidavit
executed by the owner of the information which identifies the document or part
thereof sought to be withheld, and a full statement of the reasons on the basis
of which it is claimed that the information should be withheld from public
disclosure. This section further requires the statement to address with
specificity the considerations listed in 10 CFR 2.790(b)(4).
The information
sought to be withheld shall be incorporated as far as possible into a separate
part of the affidavit.
If we do not hear from you in this regard within the
specified periods noted above, the report will be placed in the Public Document
Room.
O
P
P
G
_-_
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
___
____
.
.
.
Tennessee Valley Authority
2
0CT 2 71981
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
fSf
R. C. Lewis, Director
Division of Resident and
Reactor Project Inspection
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report Hos. 50-327/81-36
and 50-328/81-45
cc w/ encl:
H. J. Green, Director of Nuclear Power
G. G. Stack, Project flanager
C. C. flason, Plant
Superintendent
J. F. Cox, Supervisor, Nuclear
Licensing Section
ft. J. Burzynski, Project Engineer
H. N. Culver, Chief, Nuclear Safety
Review Staff
bec w/ encl:
NRC Resident Inspector
,
Document fianagement Branch
State of Tennessee
RI :RRP
RI
I
RI
RRPI
'
4v'
-
N
3
E
DQuick
is
RCey/81
10/f,}/81
10/41/81
10
_ - _ - - _ _ _ _ - _ _