Forwards IE Insp Repts 50-369/81-30 & 50-370/81-18 on 810915-1015.No Noncompliance Noted
ML20039A058
Person / Time
Site: McGuire, Mcguire  
Issue date: 11/23/1981
From: Kellogg P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Parker W
DUKE POWER CO.
Shared Package
ML20039A059 List:
References
NUDOCS 8112160182
Download: ML20039A058 (2)


See also: IR 05000369/1981030

Text

..

..

.

M

N.

NOV 23

gF,g~ k

-

Duke Power Company

jb/ o {Gb k'9

j/ ,2

,

ATTti: Mr. W. O. Parker, Jr.

\\

'

r

.

6

-

v

Vice' President, Steam Production

fs [ e., 8C

'

a P_\\)

P. O. Box 2178

j

Charlotte,f4C 28242

y

p7

(/ g

lN

h

A, b

Gentlemen:

%

vi

/

Subject: Report Nos.M69/81-30)0-370/81-18

b/

N

This refers to the routine safety inspection conducted by Ms. ft. J. Graham of

this office on September 15 - October 15, 1981, of activities authorized by f4RC

Operating License flos, f1PF-9 and CPPR-84 for the ficGuire Nuclear facility and to

the discussion of our findings held with fir. ft. D. McIntosh, Plant fianager, at

the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspectors.

Within the scope of this inspection, no violations or deviations were disclosed.

We have examined actions you have taken with regard to previously identified

enforcemea{. matters. These are discussed in the enclosed inspection report.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure (s)

will be placed in the flRC's Public Document Room unless you notify this office,

by telephone, within ten days of the date of this letter and submit written

application to withhold information contained therein within thirty days of the

date of this letter.

Such application must be consistent with the requirements

of2.790(b)(1).

Should you.have any questions concerning this letter, we will be

glad to discuss them with you.

Sincerely,

Paul J. Kellogg, Chief

Reactor Projects Branch 2, Division

of Resident and Reactor Project

Inspection

Enclosure:

Inspection Report Nos. 50-369/81-30

and 50-370/81-18

cc w/ encl:

.

ft. D. ficIntosh, Plant fianager

J. T. floore, Project flanager

8112160182 811123

PDR ADOCK 05000369

F*"

ZE?of9 \\

,

_

__

_

_ _ _ _

- _ _ _ _ _

..

...

&

NOV 231 sat

Duke Power Company -

2

l

-

l

t ' :

bcc w/ enc 1:

NRC Resident Inspector

Document Management Branch

' State of North Carolina

-

i

J

t

t

4

5

i

'

RII:RRPI

RII:RRPI

RII:RRPI

RII:RRPI

.

PRB

HJ a$

Eryant

AJI n t

s

l

11/4c/81

11/A/81

11/t<1/81

11/3C/81

.

t

'

RII:R P

PJK

ogg

j

'

11/ 7/81

1

>

s

f

,

4

.

..

_

.-

.

.

..

,-.

.