ML20038C908

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-293/81-19 on 810818-0930 & Notice of Violation
ML20038C908
Person / Time
Site: Pilgrim
Issue date: 11/25/1981
From: Brunner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Morisi A
BOSTON EDISON CO.
Shared Package
ML20038C909 List:
References
NUDOCS 8112140252
Download: ML20038C908 (2)


See also: IR 05000293/1981019

Text

r

jJ~ d 6 F/

-

.

.

.

NOV 2 51981

OccLet tio. 50-293

-

.

Coston Edison Company it/C Nuclear

/g

'h' \\

s

.

ATTH: fir. A. V. fiorisi

g,

!!uclear Operations Support !!anacer

Cj

p ,$

'.

O

Ri

890 Boylston Street

u.

U8/g j

F>oston, flassachusetts 02199

\\y

%

./

Gentlenen:

g

7

Subject:

Inspection 50-293/81-19

M

This refers to the routine safety inspection conducted by ifr. J. Johnson

of this office on Aucust 18 - September 30, 1981, of activities authorized

by fiRC License fio. DPR-35 and to the discussions of our findings held by

Mr. Johnson with ilr. C. !!athis and Mr. R. ifachon and other renbers of

your staff periodically during the inspection.

Areas examined during this inspection are described in the Office of

Inspection and Enforceoent Inspection Rerort which is enclosed with this

letter.

'fithin these areas, the insrection consisted of selective exarrina-

tions of procedures and representative records, interviews with personnel,

and observations by the inspector.

Based on the results of this inspection, it appears that certain of your

activities were not conducted in full compliance with fiRC requirements, as

set forth in the fiotice of Violation, enclosed herewith as Appendix A.

These

items of nonconpliance have been catecorized into the levels described in the

~

Federal Register Notice (45 FR 66754) dated October 7,1980.

You are required

to respond to this letter and in preparing your response, you should follow

the instructions in Appendix A.

In accordance with 10 CFR 2.793 of the Coinission's regulations, a copy of

this lettcr and the enclosures uill be pl6ced in the NRC's Public Document

Poon.

If this report contains any infornation that you (or your contractors)

believe to be exenpt fron discicsure under 10 CFP 9.5(a)(/-), it is necessary

that you (a) notify this office by telephone within ten (10) days from the

date of this letter of your intention to file a request for withholding;

and (b) subnit within 25 days frun the date of this letter a written applica-

tion to this office to withhold such infomation.

Consistent with section

2.790(b)(1), any such application rust be acccmpanied by an affidavit

cxecuted by the owner of the infomation which identifies the document or

6M //7

SRI:DRPI

RI ?RPI

RI:DETI

diaf RI: 'RPI

J. Jchnson

T. Elsasser

M Jart-in- 6 pet

E. 3 runner

11

/1

/81

11/ /81

,,g g 11 g /81

.

Ig0,

LWru my

8112140252 811125

0,q / sf

h k

  1. #0" 00000 $

OFFICIAL RECORD COPY

o

?

-

.

'

.

.

Coston Edison Company M/C ';uclear

2

NOV 2 5 G81

a

part sought to be withheld, and which contains a full statement of the

reasons on the basis which it is claimed that the information should be

!

withheld from public disclosure. This section further requires the state-'-

cent to address with specificity the considerations listed in 10 CFR 2.790

,

I

i

(b)(4). Ths infonnation sought to be withheld shall be incorporated as far

as possible into a separate part of the affidavit.

If we do not hear from

you in this regard within the specified periods noted above, the report

will be placed in the Public Docuaent Room. The telephone notification

of your intent to request withhodling, or any request for an extension

i

of the 10 day period which you believe necessary, should be made to the

i

'

<upervisor, Files, Mail and Records, USNRC Region I, at (215) 337-5223.

!

Should you have any questions concerning this inspection, we will be

pleased to discuss thea with you.

Sincerely,

.

Originni Si enna ikRI

Eldon J. Brunner, Chief, Projects

Branch fl. Division of Resident

and Project Inspection

Enclosures:

1.

Appendix A Motice of Violation

2.

Office of Inspection and Enforcement Inspection

Report No. 50-293/81-19

cc w/encis:

R. D. achon, i uclear Operations Manager - Pilgrin Station

Public Document Room (PDR)

Local f ublic Docur ent Roca (LPDR)

t;uclear Safety Inferr.ation Center (NSIC)

i;RC P,esident Inspector

Corriemtealth of Massachusetts (2)

bcc w/ encl:

Region I Docket Room (with concurrences)

Chief, Operational Support Section (w/o encis)

0FFICIAL RECORD COPY

!