ML20038C807

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-293/81-30 on 811019-23.No Noncompliance Noted
ML20038C807
Person / Time
Site: Pilgrim
Issue date: 11/24/1981
From: Brunner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Morisi A
BOSTON EDISON CO.
Shared Package
ML20038C808 List:
References
NUDOCS 8112140147
Download: ML20038C807 (2)


See also: IR 05000293/1981030

Text

r

h 04-11

NOV 2 5%f

f @ tw

Docket No. 50-293

\\

ps

y

[]

i

Bostor Edison Company M/C Nuclear

C 4"g Cy * /p/ -

i

%

.

ATTN:

Mr. A. V. Morisi

'd

Nuclear Operations Support Manager

D_'

% O

M

  1. 4% 8

E

800 Boylston Street

Boston, Massachusetts

02199

cg

Mg[/. y

/X

Q

Gentlemen:

4

p'

Subject:

Inspection 50-293/81-30

This refers to the routine safety inspection conducted by Mr. W.A. Rekito

of this office on October 19-23, 1981 at Pilgrim Nuclear Power Station,

Unit 1 of activities authorized by NRC License No. OPR-35 and to the discussions

of our findings held by Mr. Rekito with Mr. R. Machon of your staf f at the

conclusion of the inspection.

Areas examined during this inspection are described in the Office of Inspection

and Enforcement Inspection Report which is enclosed with this letter.

Within these areas, the inspection consisted of selective examinations of

procedures and representative records, interviews with personnel, and

observat'ons by the inspector.

Our inspector also verified the steps you have taken to correct the items

of noncompliance brought to your attention in the enclosure to our letter

dated August 13, 1980. We have no further questions regarding your action

at this time.

Within the scope of this inspection, no items of noncompliance were observed.

In accordance with 10 CR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC's

Public Document Room.

If this report contains any information that you (or

your contractors) believe to be exempt from disclosure under 10 CFR 9.5(a)(4),

it is necessary that you (a) notify this office by telephone within ten

(10) days from the date of this letter of your intention to file a request

for withholdinc; and (b) submit within 25 days from the date of this letter

l

a written app ; cation to this office to withhold such information.

Consistent

with section 2.790(b)(1), any such application must be accompanied by an

'

affidavit executed by the owner of the information which identifies the

document or part sought to be withheld, and which contains a full statement

of the reasons on the basis which it is claimed that the informat an should

l

be withheld from public disclosure.

This section further require: the

l

statement to address with specificity the considerations listed in 10 CFR 2.790(b)(4). The information sought to be withheld shall be incorporated

as far as pos,sible into a separate part of the affidavit.

If we do not

6/'3

9

t/

,

-

g

l

R1:DETI /

R1:DETIff

Rekito/wb f Bettenhausen

R1:DEThf[R1:

DfkPI

R$'RPI

Ebnete d Els'asser Br nner

l

11/12/81

11/13/81

l//, 3),;f

d/g/< ,

11/12/81)9

g1

%d/

g\\Q

,

8112140147 gii124

0FFICIAL RECORD COPY

'

'

I

r'DR ADOCK 05000293

i

PDR

y@\\

G

>

r

Boston Edison Company M/C Nuclear

2

hear from you in this regard within the specified periods noted above, the

report will be placed in the Public Document Room. The telephone notification

of your intent to request withholding, or any request for an extension of

the 10 day period which you believe necessary, should be made to the Supervisor,

Files, Mail and Records, USNRC Region I, at (215) 337-522?

No reply to this letter is required; however, if you have any questions

concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

Oristn11 Signed EC -

Eldon J. Brunner, Chief, Projects

Branch No. 1, Division of Resident

and Project Inspection

Enclosure: Office of Inspection and Enforcement Inspection

Report Number 50-293/81-30

cc w/ enc 1:

R. D. Machon, Nuclear Operations Manager - Pilgrim Station

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

Commonwealth of Massachusetts (2)

bec w/ encl:

Region I Docket Room (with concurrences)

Chief, Operational Support Section (w/o encl)

1

0FFICIAL RECORD COPY

I

J