ML20038C440
| ML20038C440 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 11/24/1981 |
| From: | Stolz J Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML20038C434 | List: |
| References | |
| TAC-46970, NUDOCS 8112110036 | |
| Download: ML20038C440 (2) | |
Text
3 7590-01 UNITED STATES NUCLEAR REGULATORY COMMISSION DOCKET NO. 50-302 FLORIDA POWER CORPORATION, ET AL NOTICE OF ISSUANCE OF AMENDMENT TO FACILITY OPERATING LICENSE The U. S. Nuclear Regulatory Comission (the Comission) has issued Amendment No. 44 to Facility Operating License No. DPR-72, issued to the Florida Power Corporation, City of Alachua, City of Bushnell, City of Gainesville, City of Kissimee, City of Leesburg, City of New Smyrna Beach and Utilities Comission, City of New Smyrna Beach, City of Ocala, Orlando Utilities Comission and City of Orlando, Sebring Utilities Comission, Seminole Electric Cooperative.
Inc., and the City of Tallahassee (the licensees) which revised the Technical Specifications for operation for the Crystal River Unit No.
3 Nuclear Generating Flant (the facility) located in Citrus County, Florida.
The amendrent is effective as of the date of issuance.
This amendment revises the Technical Specification requirements for testing of Radiation Monitor Rii-A5 to be consistent with Standard Technical Speci fica tions.
The application for the amendment complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations. The Comission has made appropriate findings as required by the Act and the Commission's rules and regulations in 10 CFR Chapter I, which are set forth in the license amendment.
Prior 8112110036 811124 PDR ADOCK 05000302 P
pon
o
. 7590-01 public notice of this amendment was.not required since the amendrent does not involve a significant hazards consideration.
The Commission has determined that the issuance of this amendment will not result in any significant environmental impact and that pursuant to 10 CFR 551.5(d)(4) an environmental impact statement or neoative declaration and environmental impact appraisal need not be prepared in connection with issuance of this amendment.
For further details with respect to this action, see (1) the application for amendment dated February 15, 1980, (2) Amendment No. 44 to License No.
DPR-72, and (3) the Commission's related Safety Evaluation. All of these items are available for public inspection at the Commission's Public Document Room,1717 H Street, NW, Washington, D.C., and at the Crystal River Public Library, 658 N.W. First Avenue, Crystal River, Florida. A copy of items (2) and (3) may be obtained upon request addressed to the U.S. Nuclear Regulatory Commission Washington, D.C.
20555, Attention: Director, Division of Licensing.
1 Dated at Bethesda, Maryland, this 24th day of November 1981.
FOR THE NUCLEAR REGULATORY COMMISSION
,3~
,i
.wLJ-Johg F. Stolz, Chief.
I Opfe ating Reactors Branch #4
' vision of Licensing
..