Forwards Amend 44 to License DPR-61,safety Evaluation & Notice of Issuance & Availability.Amend Changes Tech Specs to Incorporate Operability & Surveillance Requirements for Automatic Initiation of Auxiliary Feedwater Sys
ML20038C146
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 11/20/1981
From: Crutchfield D
Office of Nuclear Reactor Regulation
To: Counsil W
CONNECTICUT YANKEE ATOMIC POWER CO.
Shared Package
ML20038C147 List:
References
LSO5-81-11-019, LSO5-81-11-19, NUDOCS 8112100155
Download: ML20038C146 (4)


Text

c--

UNITED STATES s._

g g

NUCLEAR REGULATORY COMMISSION n

,j WASHINGTON, D. C. 20555

\\...../

November 20, 1981' Docket No. 50-213 LS05-81-ll-019 Mr. W. G. Counsil, Vice President sh Nuclear Engineering and Operations c

Connecticut Yankee Atomic Power Company f

rk h) x Post Office Box 270 g"

0 Hartford, Connecticut 06101

~

//0V2 4 19815 b'

4

Dear Mr. Counsil:

D$gl4ron f,

SUBJECT:

AUXILIARY FEEDWATER

/j p

The Commission has issued the enclosed Amendment No. 44 to Facility Operating License No. DPR-61 for the Haddam Neck Plant. This amendment consists of changes to the Technical Specifications in response to your applications dated August 27, 1980 and April 16, 1981 as supported by letters dated November 30 and December 4 and 6,1979, January 17 and 30, April ll, May 19, June 10 and September 29, 1980, May 26, June 30 August 14, August 27, and September 9,1981.

The changes to the Technical Specifications (1) add operability and surveillance requirements for automatic initiation of the auxiliary feedwater system, and (2) increase the surveillance requirements on the auxiliary feedwater pumps and related flow paths.

Certain modifications to your proposed changes were necessary to meet our criteria. These modifications have been discussed with and agreed to by your staff.

The enclosed Safety Evaluation aisc documents our review of your responses to the NRC staff's short-term and long-term recommendations that resulted from our reliability evaluation of the Haddam Neck Plant auxiliary feedwater system. These recommendations were the subject of our October 11, 1979 letter. Based on our review, we find your nsponse to our recommendations acceptable with the exception of Long Term Recommendation 3 for which the staff has not completed its review. The status of this recommendation is discussed in Section 2.4 of the Safety Evalaution. We will address the resolution of this item in a subsequent safety evaluation.

In addition, there are some related matters under review in the Systematic Evaluation Program as discussed in our Safety Evaluation. The consequences of a main steam line break with continuous main feedwater addition is being addressed as part of the NRC staff's review of the responses to IE Bulletin 80-04.

8112100155 0111207 PDR ADOCK 05000213 P

PDR

^

u u

Mr. W. G. Counsil November 20, 1981 The results of our review of the Haddam Neck Plant safety-grade automatic initiation system and flow indication circuitry (TMI Action Plan Item II.E.1.2) will be issued at a later time.

Copies of our Safety Evaluation and the related Notice of Issuance are also enclosed.

Sincerely.

ORIGINAL SIGNED BY THOMAS V. WAMBACH FOR Dennis M. Crutchfield, Chief Operating Reactors Branch #5 Division of Licensing

Enclosures:

1.

knendment No. 44 to I

License No. DPR-61 2.

Safety Evaluation 3.

Notice of Issuance cc w/ enclosures:

See next page DISTRIBUTION:

Docket NRC PDR LPDR TERA NSIC ORB #5 RF Glainas DCrutchfield CTropf WPaulson HSmith (2)

OELD OI&E (5)

ACRS (10)

RDiggs GDeegan (4)

BScharf (10)

Gray File Xtra cy (3)

/

DL:

(,/PM WPaulson l} /h/81 NYd O

0RB #5/P TLl0f/f5/LA OELD DLYORB#5/C

@[.g 2[,;,,', Mffdd5}j@J.U.'d G[u..!.nii" [" l ~" "~ ~""

DL:

ornce>

" " " " ~ " " " "

sua. > C.Tr.o

....<./.....g...

.L..t.g81.......n../..p..l. )... t.u.w8.i......u.../.dT8.!...

nac ronu sis oS803 sacu om OFFICIAL RECORD COPY usam mi-mm

._a

Mr. W. G. Counsil November 20, 1981 The results of our review of the Haddam Neck Plant safety-prade automatic initiation system and flow indication circuitry (TMI Action Plan Item II.E.1.2) will be issued at a later time.

Copies of our Safety Evaluation and the related Notice of Issuance 4

are also enclosed.

Sincerely, mj df e/J.,= w Y W Dennis M. Crutchfield, Chief Operating Reactors Branch #5 Division of Licensing

Enclosures:

1.

Amendment No. 44 to License No. DPR-61 2.

Safety Evaluation 3.

Notice of Issuance cc w/ enclosures:

See next page i

4

)

l-

- -. - ~. -,.. -,

x

~

Mr. W. G. Counsil November 20, 1981 cc w/ enclosures:

Day, Berry & Howard Counselors at Law One Constitution Plaza Hartford, Connecticut 06103 Superintendent Haddam Neck Plant RFD #1 Post 0ffice Bcx 127E

~

East Hampton, Connecticut 06424 Mr. Richard R. Laudenat Manager, Generation Facilities Licensing Northeast Utilities Service Company P. O. Box 270 Hartford, Connecticut. 06101 R'ussell Library 119 Broad Street Middletown, Connecticut 06457 Board of Selectmen

~

Town Hall Haddam, Connecticut 06103 Connecticut Energy Agency ATTN: Assistant Director Research and Policy Development Department of Planning and Energy Policy 20 Grand Street Hartford, Connecticut 06106 U. S. Environmental Protection Agency Region I Office ATTN: Regional Radiation Representative JFK Federal Building.

Boston, Massachusetts 02203 Resident Inspector Haddam Neck Nuclear Power Station c/o V. S. NRC East Haddam Post Office East Haddam, Connecticut 06423 H

.-