Forwards IE Insp Repts 50-460/81-07 & 50-513/81-07 on 810831-0904 & 14-18 & Notice of Violation
ML20038B815
Person / Time
Site: Washington Public Power Supply System
Issue date: 11/20/1981
From: Faulkenberry B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Mazur D
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML20038B816 List:
References
NUDOCS 8112090127
Download: ML20038B815 (2)


See also: IR 05000460/1981007

Text

'

4

y

y

79

y

.

,,

..

  • ^gy

4

4

g

.g

.

4g.

-

s

i

l

NOV 2 01981

'

,

Docket No. 50-4tio, 50-513

4 f'Jh

%

,k'

h

/

Washington Public Power Supply System

P. O. Box 968

  • d

3

_g

3000 George Washington Way

-

cJz

fg8

2/

-

l

Richland, Washington 99352

C

/%

b,

lh

'Q[Tg.Lp'

/A

Attention: Mr. D. W. Mazur

Program Director, WNP-1/4

Gentlemen:

Subject: HRC Inspection of Washington Nuclear Projects 1 and 4

This refers to the inspection conducted by fiessrs P. P. Narbut and

G. Hernandez of this office on August 31 - September 4, and September 14-18,

1981 of activities authori7ed by NRC Construction Permit Nos. CPPR-134 and

CPPR-174, and to the discussion of our findings held with Mr. D. H. Mazur

and other members of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the enclosed

inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records,

interviews with personnel, and observations by the inspector.

Based on the results of this inspection, it appears that one of your

activities was not conducted in full compliance with NRC requirements,

as set forth in the Notice of Violation, enclosed herewith as Appendix A.

It appears that the quality perfomance of your heating and ventilation

contractor needs additional attention. Subsequent to the initial

allegations in January 1981 which resulted in six items of noncompliance,

!

additional allegations and inspections have determined that significant

quality problems are continuing. Consequently, in your reply you should

describe in particular those actions taken or planned to improve the

effectiveness of your management control system to detect and control

problems of this nature.

(

li M W ebbi g

/EO

5&

PDR

fL

->

RV/jk g ,,,,g,,,, ,,,,r

,,{ g g

, , , , , , , , , ,

,,,,, ,, , ,,,, ,

,,, , ,, , , ,

...

suas my

NARBUT

HERifANDEZ

D0DD ;

FAULKENBERRY

'"

"""" " ' '

""" ' " "

" " " " " ' ' " '

"T17f278T

'T171L78'1"

'T17pB1' "1 T17p781'

,,4

...l..

.

.......

. . ........ .. . .

........ ...~ .~

. . ~ . . ~ . . . . . .

.... .... .

.

..... . ....... ..

.... .. .. . .

' " ' ee -22+ e2.

NRC FORM 218 dO 80t NRCM O240

OFFICIAL REs

RD COPY

.- - - - - - - _ _ _ _ _ _ _ _ _

,

.-

a

.

Washington Public Power Supply System

-2-

.tl0V 2 01981

1

'In- accordance with 10 CFR 2.790 of the Comission's rr gulations, a copy

of this letter'and the enclosed inspection report will be placed in the

NRC's Public Document Roon.

If this report contains any information

that you (cr your contractors) believe to be exempt from disclosure

under 10 CFR 9.5(a)(4), it is necessary that'you (a) notify this office

by telephone within ten (10) days from the date of this letter of your

' '

intention to file a request for withholding; and (b)' submit within

25 days from the date of this, letter a written application to this

office to withhold such information.

If your receipt of this letter has

~~

been delayed such that less than seven (7) days are available for your

review, please notify this office promptly so that a new due date may be

established. Consistentwithsection2.790(b)(1),anysuchapplication

must be accompanied by an affidavit executed by the owner of the information

which identifies the document or part sought to be withheld, and which

contains a full statement of the basis on which it is-clained that the

infonnation should be withheld from public disclosure. This section

further requires the statement to address with specificity the considerations

listed in 10 CFR 2.790(b)(4). The information sought to be withheld

shall be incorporated as far as possible into-a separate part of the

affidavit.

If we do not hear from you in this regard within the specified

periods noted above, the report will be placed in the Public Document

Room.

Should you have any questions concerning this inspection.

  • will be

,

glad to discuss them with you.

Sincerely,

B. H. Faulkenberry

Chief, Reactor Construction Projects

Branch

Enclosure:

A.

Appendix A - Notice of Violation

B.

IE Inspection Report

Nos. 50-460/81-07

50-513/81-07

cc w/o enclosure:

R. B. Glasscock, Quality Assurance Director

bec: