ML20038B792
| ML20038B792 | |
| Person / Time | |
|---|---|
| Site: | Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png |
| Issue date: | 11/23/1981 |
| From: | Brunner E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Counsil W CONNECTICUT YANKEE ATOMIC POWER CO. |
| Shared Package | |
| ML20038B793 | List: |
| References | |
| NUDOCS 8112090106 | |
| Download: ML20038B792 (2) | |
See also: IR 05000213/1981012
Text
<'
.
- }b c h ?f s
>
J
.
'
(
.,
- - -
>
.
>
,
,
,-
_(
_R
.:
,..
,
.
.
-
e
' a .,
.
-
-
.
-
_
,
,
,
,,
,
,
,
,
-
.
-
,
,
,
.
.
"'
4
1
.g
- .
.
.
~
.
NOV 2 31961.
-
'
~
~
'
~
',1
~ \\ l" ,
'
'
-
_
,:
s'
y
-
>
-
-
.en
.3
s
,C.$v M
%
-
. :
-
- Docket No. 50-213 '
-
( N r p; V' G!/ Q 3
-
-
c,
- ,
i . ;. ;
7
-
Connecticut _ Yankee Atomic Power Company
$r
'.h
'
<
s' /
A
p ( ;\\'.,
~
ATTil:- >Hr.' W.G. Counsil
'
.
Senior Vice President - Nuclear
m
,6
'.
Engineering ^ and Operations Group
,
.
P.O. Box =270
-
ifartford, Connecticut 06101. ,
~ n
.
,
-
,.
Gen'lemen:
'
t
.
"
~
Subject:
Inspection 50-213/81-12
-
.
,
'This refers to the routine safety inspection con'dbeted by Mr.LT.ll.' Smith of.
-
this office on September 14 - October 30, 1981, at the Haddam fleck Plant,
-
Haddam, Connecticut, of activities authorized by HRC License No'. OPR-61, a' d
~
n
to the discussions of our findings held by Mr. T.ll. Smith with Mr. R.H. Graves-
and otheb members of;your. staff periodically during the inspection.
' Areas examined d' ring this inspection arel described in the Office' of Inspection
u
and Enforcement Inspection Report which is enclosed with this . letter. Within-
.
these areas, the ' inspection consisted of- selective examinations of procedures
and. representative . records,-interviews with personnel, and observation's' by. the
inspector.
'
W1 thin,the scope _of this inspection, no items of noncompliance were observed.
.
-
,
.
,
In accordance with 10 CFR 2.790 of the Comission's* regulations, a copy. cf this -
,
letter and the enclosed inspection report will be placed in the NRC's Public
'"-
Document Room. 'If this report contains any information that"you (or our! - -
'
'
-
contractors) believe to be exempt from disclosure under 10-CFRi9.5(a) 4),' it
is necessary that you (a) notify this .off. ice by ' telephone within ten 10)' days
~
-
from the date of this letter of your intention to file'a request.for withholding;-
and. (b) submit within 25 days from the.date of this' letter a written application
-
to this office to withhold such information. Consistentwithsection2.790(b)(1),
v
t
~
any such application must. be accompanied by an affidavit; executed by the owner of
-
,
- the information which identifies' the documentroFpart sought $to be withheld,'and
<
which containsia fu11' statement of- the reasons 'on the basis which it is clained -
,
that the information should'be withheld.from public disclosure. This section
4
further requires the. statement to ' address with specificity the considerations
,
listedin10CFR2.790(b)(4). The information sought to-be withheld shall be
C
incorporated as' far as possible-into a . separate part of theiffidavit.-
e
'
' ~
'
'
'
y
0FFICIAL REC 0
-COPY
.
g.
.,
-
-- lf 2:?
,
.b '}.
c
,
'
-
RI:DRPI.
PI~
"
R
.
-
,
Y>.. .
s:
"
^
'
Smith /cic'
- Elsasseb-
'B
'n
T/
,
7///C/8/~
'
e112090106 011123
-
-st i'
b.
'
-
DR ADOCK 05000
7gj
,
,
,,
~
^'
~
,
Connecticut Yankee Atonic
NOV 2 3199
Power Company
,,c
'
If we do not hear from you in this regard within the specified periods noted
l
above, the report will be placed in the Public Document Room. The telephone
notification of your intent to request withholding, or any request for an
extension of the 10-day period which you believe necessary, should be made
to the Supervisor, Files, Mail and Records, USNRC Region 1, at (215) 337-5223.
Should you have any questions concerning this inspectioi;, we will be pleased
to discuss them with you.
Sincerely,
Original Signed B'/ t'
Eldon J. Brunner, Chief, Projects
Branch ill, Division of Resident
and Project Inspection
.
,
Enclosure: Office of Inspection and Enforcement
Inspection Report tiunber 50-213/81-12
cc w/ enc 1:
R. Graves, Plant Superintendent
D.G. Diedrick, Ilanager of Quality Assurance
R.T. Laudenat, Manager, Generatic, Facilities Licensing
J.F. Opeka, System Superintendent, th Olear Opr ations
Public Document Room (PDR)
local Public Document Roon (LPDR)
fluclear Safety Infcrmation Center (flSIC)
~
State of Connecticut
NRC Resident Inspector
_
bcc w/ encl:
Region I Docket Room (w/ concurrences)
Chief, Operational Support Section (w/o encls)
b:
0FFICIAL RECORD COPY'
.
>
__