Forwards IE Insp Rept 50-333/81-24 on 811001-31.No Noncompliance Noted
ML20038B561
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 11/13/1981
From: Brunner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Leonard J
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
Shared Package
ML20038B563 List:
References
NUDOCS 8112080402
Download: ML20038B561 (2)


See also: IR 05000333/1981024

Text

i .

%

NOV 131981

Docket No. 50-333

gg.~ 'h

Power Authority of the State of New York

s

James A. FitzPatrick Nuclear Power Plant

e

c -

ATTH: Mr. John D. Leonard

/ '

i @ iM 51

Resident Manager

1

P

N I -k

P. O. Box 41

1

.,".j 3f

Lycoming, New York

13093

! -

M

0

k h . r1

d?

,

Gentlemen:

$1

y/

-s

sy

Subject:

Inspection 50-333/81-24

Nfe 49

This refers to the routine, safety inspection conducted by Mr. J. Linville of

this office on October 1-31, 1981 of activities authorized by HRC License

No. DPR-59 and to the discussions of our findings held by Mr. Linville with

yourself and other members of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the Office of Inspection

and Enforcement Inspection Report which is enclosed with this letter. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observations by the

inspector.

Our inspector also verified the steps you had taken to correct the itens of

noncompliance brought to your attention in letters dated January 31,1981 and

April 10, 1981. We have no further questions regarding the steps you took to

correct item C in both letters.

Within the scope of this inspection, no items of noncompliance were observed.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC's

Public Document Room.

If this report contains any information that you-(or

your contractors believe to be exempt from disclosure under 10 CFR 9.5(a)(4),

it is necessary that you (a) notify this office by telephone within ten (10)

days from the date of this letter of your intentic.1 to file a request for

withholding; and (b) submit within 25 days from the date of this letter a

written application to this office M withhold such infomation. Consistent

withsection2.790(b)(1),anysuchapplicationcustbeaccompaniedbyan

affidavit executed by the owner of the infomation which identifies the

document or part sought to be withheld, and which contains a full statement ~

of the reasons on the basis which it is claimed that the information should

be withheld from public disclosure. This section further requires the

statement to address with specificity the considerations listed in 10 CFR 2.790(b)(4). The information sought to be withheld shall be incorporated

\\

70/

RI:DRPI:JCL

RI:DRPI:LTD

h:DRPI:HBK

RI:[fR I: JB

6

\\# 11/05/81

dll/05/81

'Nh

)/>

)JWA

i

.JWA

i

3

'

/

T

8112080402 811113

N

i, p

\\

PDP ADOCK 05000333

\\

G

PDR

gj

-

-

. _ - _ - _ _ _ _ _ _ _ _ . _ _ _ _ _ _

- _ _ _ _

_ _ - _

_ _ _ _ _ .

_.

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

_ _ _ _ _ - _ _ _ _

.

i

Power Authority of the State

2

.NOV 131981

of New York

,

,

as far as possible into a separate part of the affidavit.

If we do not hear

'N

from you in this regard within the specified periods noted above, the report

N

will be placed in the Public Document Room. The telephone notification of

your intent to request withholding, or any request for an extension of the

_

10 day period which you believe necessary, should be made to the Supervisor,

t

Files, Mail and Records, USNRC Region I, at (215) 337-5223.

'

No reply to this letter is required; however, if you should have any questions

concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

Eldon J. Brunner, Chief, Projects

Branch No.1, Division of Resident

and Project Inspection

Enclosure

1.

Office of Inspection and Enforcement

Inspection Report Number 81-24

cc w/ encl.

George T. Berry, President and Chief Operating Officer

J. P. Bayne, Senior Vice President-Nuclear Generation

A. Klausmann, Vice President-Quality Assurance

ti. C. Cosgrove, Quality Assurance Superintendent

J. F. Davis, Chaiman, Safety Review Corraittee

C.11. Pratt, Assistant General Counsel

Public Document Room (PDR)

local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

State of New York

bec w/ encl:

Region I Docket Room (with concurrences)

Chief, Operational Support Section (w/o encis)

_