r

. . .

.

-.

is1

1981

,

.

l

_

y' 8 6,~g '

Docket No. 50-358

Q[Q$(, n

,

Ti\\

'

Cincinnati Gas and Elect 7ic

>'

EN

i

' M v.OV 2 3193P" c

t

A

. Earl A. Borgsann

s. e#'"$7

')

-Senior Vice President

Engineering Services and

' [/

Electric Production

/A

'

139 East 4th Street

  • 77IM \\x

Cincinnati, OH 45201

Gentlemen:

This refers to the routine safety inspection conducted by Messrs.

W. F. Christianson and T. P. Gwynn of this office on September 1-4, 8-11,

14-15, 21-25, and 28-30, 1981, of activities at Wm. H. Zimmer Nuclear

Power Station authorized by NRC Construction Permit No. CPPR-88 and to

the discussion of our. findings with Mr. J. R. Schott at the conclusion

of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No items of noncompliance with NRC requirements were' identified during

the course of this inspection.

.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC's

Public Document Room. If this report contains any information that you or

your contractors believe.to be exempt from disclosure under 10 CFR 9.5(a)(4),

it is necessary that you (a) notify this office by telephone within seven (7)

days from the date of this letter of your intention to file a request ior

withholding; and (b) submit within twenty-five (25)' days from the date of

this letter a written application to this office to withhold such infor-

mation. Section 2.790(b)(1) requires that any such application must be

$601

$

di

81112404:K3 811'169'

,

PDR ADOCK 05000358

G

P.DR.

160 L

_

.

.

.

.

Cincinnati Gas and Electric

-2-

Company

accompanied by an affidavit executed by the owner of the informaticn which

identifies the document or part sought to be withheld, and which contains

a full statement of the reasons which are the bases for the claim that the

information should be withheld from public disclosure. This section further

requires the statement to address with specificity the considerations listed

in 10 CFR 2.790(b)(4). The information sought to be withheld shall be

incorporated as far as possible into a separate part of the affidavit-

If

we do not hear from you in this regard within the specified periods noted

above, a copy of this letter and the enclosed inspection report will be

placed in the Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

"2+k

.

R. L. Spessard, Director

Division of Resident and

Project Inspection

Enclosure:

IE Inspection

Report No. 50-358/81-25

cc w/ enc 1:

Mr. J. R. Schott, Plant

Manager

DMB/ Document Control Desk (RIDS)

Resident' Inspector, RIII

Harold W. Kohn, Power Siting

Commission

Citizens Against a Radioactive

Envirorment

Helen W. Evans, State of Ohic

RIII

RII

RIIl

f//A Yby/jp

g

"

M)Gregor

Str eter

Spessard

10/29/81

%)p

M

.

-

.

--

.

-

.