Forwards IE Insp Rept 50-361/81-27 on 810928-1002.No Noncompliance Noted
ML20038A676
Person / Time
Site: San Onofre 
Issue date: 10/29/1981
From: Book H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Papay L
SOUTHERN CALIFORNIA EDISON CO.
Shared Package
ML20038A677 List:
References
NUDOCS 8111160146
Download: ML20038A676 (2)


See also: IR 05000361/1981027

Text

e

-

,

6

y

ll

f

'

9

n

OCi e ' 1231

Docket No. 50-361

Southern California Edison Company

.g 1 J

/,o

P. O. Box 800

?

1e

s'

2255 Walnut Grove Avenue

g

g/ 7

'fi

/p

Rosemead, California 91770

i

,

Attention:

Dr. L. T. Papay, Vice President

%

8

-

Advanced Engineering

k

d4

n'/[k\\ ?)y

Gentlemen:

,

\\ N

d

Subject: NRC Inspection of San Onofre Unit 2

This refers to the routine inspection conducted by Messrs. R. F. Fish of

this office on September 28 - October 2, 1981 of activities authorized by

NRC Construction Permit No. CPPR-97, and to the discussion of our findings

held by Mr. Fish with Mr. H. B. Ray and other members of your staff at

the conclusion of the inspection.

Areas examined during this inspection are described in the enclosed inspection

report. Within these areas, the inspection consisted of selective examinations

of procedures and representative records, interviews with personnel, and

observations by the inspector.

No items of noncompliance with NRC requirements were idenntified within

the scope of this inspection.

In accordance with 10 CFR 2.790 of the Comission's regulations, a copy

of this letter and the enclosed inspection report will be placed in the

NRC's Public Document Room.

If this report contains any information that

you (or your contractors) believe to be exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by telephone

within ten (10) days from the date of this letter of your intention to

file a request for withholding; and (b) submit within 25 days from the

date of this letter a written application to this office to withhold such

information.

If your receipt of this letter has been delayed such that

less than seven (7) days are available for your review, please notify this

office promptly so that a new due date may be established. Consistent

with section 2.790(b)(1), any such application must be accompanied by an

affidavit executed by the owner of the information which identifies the

document or part sought to be withheld, and which contains a full statement

of the basis on which it is claimed that the information should be withheld

from public disclosure. This section further requires the statement to

g/

address with specificity the considerations listed in 10 CFR 2.790(b)(4).

,

omcr p!

RV/d

. ogi

8111160146 811029

-[f

.

l

I

= ^ W >l' -

.

p. . -u

FI

WENSLAWSKI

BOOK

PDR ADOCK 05000361

'

PDR

O

-

o^n >

10/27./.81 10/?.3/.81

10/.#/81

.j.

..

.;

.. . .. .

. . . .

" mm

merc+u m ac u m cuouc

OFFICIAL RECORD COPY

-

.

.

Southern California Edison Company ~2-

c. yc

c31

.

The information sought to be withheld shall be incorporated as far as possible

into a separate part of the affidavit.

If we do not hear from you in this

regard within the specified f.eriods noted above, the report will be placed

in the Public Document Room.

Should you have any questions concerning this inspection, we will be glad

_

to discuss them with you.

i

Sincerely,

y; ..t .e * *e

t

_

. .: . \\ ,::>

.

H. E. Book, Chief

j

Radiological Safety Branch

cc w/o enclosure:

'

Mr. R. Dietch, Vice President

Puclear Engineering & Operations

_

i

bec:

-

DM3/Docunent Control Desk (RIDS)

Distributed by RV:

State of CA (Hahn/ Johnson)

Resident Inspector

i

[

RHE (w/e enc)

.r

>

. . .

'.

b

[_

q

^

-

__

%

,,

'_

..?

'

b

.

2

E.

.

A_