ML20038A571

From kanterella
Jump to navigation Jump to search
Forwards Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures PEP-2.6.16 Re Emergency Response manager,PEP-2.6.18 Re Technical Analysis & PEP-2.6.19 Re Radiological Control Manager
ML20038A571
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 10/29/1981
From: Utley E
CAROLINA POWER & LIGHT CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20038A569 List:
References
NO-81-1765, NUDOCS 8111130237
Download: ML20038A571 (1)


Text

,

3 a.

October 29, 1981 File: NG-3514(R)

Serial No.: MJ-81-1765 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D.C.

20555 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET No. 50-261 LICENSE NO. DPR-23 REVISED DfERGENCY PROCEDURES

Dear Mr. Denton:

In accordance with 10CFR50, Appendix E, Carolina Power & Light Company (CP&L) hereby transmits tea (10) copies of the revised H. B.

Robinson Steam Electric Plant (HER) Emergency Procedures. New or revised information is indicated by vertical bars in the margin of the appropriate pages. New procedures, as indicated by revision 0, do not have these vertical bars. Due to administrative delays, these procedures are not being submitted within the required thirty days. The required submittal date was October 23, 1981.

Should you have any quesions regarding these changes, please contact a member of our staff.

Yours very truly, l

E. E. Utley i

Executive Vice President Power Supply and

[

Engineering & Construction DCS/lr (0710) g N

l Attachment g

,[,-N +

80I. I k*7 L

cc:

Mr. J. P. O'Reilly (3) y, g%,% %

1' l

~

u' D U

u/

'/p 9111130237 811105

'{0 g

  • /

l PDR ADOCK 05000261 N Q l

F PDR m

.,~

c 2-r4,enew, s ee:.s c an 5'

. = s er N 1 P ::

R CD&L Carolina Power & Light Company October 29, 1981 File:

NG-3514(R)

Serial No.:

NO-81-1765 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D.C.

20555 H. B. ROBINSON STEAM ELECTRIC PUtNT, UNIT NO. 2 DOCKET No. 50-261 LICENSE NO. DPR-23 REVISED EMERGENCY PROCEDURES

Dear Mr. Denton:

In accordance with 10CFB50, Appendix E, Carolina Power & Light Company (CP&L) hereby transmits ten (10) copies of the revised H. B.

Robinson Steam Electric Plant (HER) Emergency Procedures.

New or revised information is indicated by vertical bars in the nargin of the appropriate pages. New procedures, as indicated by revision 0, do not have these vertical bars. Due to administrative delays, these procedures are not being submitted within the required thirty days.

The required submittal date was October 23, 1981.

Should you have any quesions regarding these changes, please contact a member of our staff.

Yours very truly, Y

/

&'l- - -

YJ E. E. Utley i

Executive Vice President Power Supply and Engineering & Construction DCS/lr (0710)

Attachment cc:

Mr. J. P. O'Reilly (3) 411 Fayetteville Street

  • P. O Box 1551
  • Raleigh, N. C 27602 L y nw2Tx*gn.rgim mim mop rm
m.