ML20037D133

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-416/81-09 & 50-417/81-06 on 810331-0403.No Noncompliance Noted
ML20037D133
Person / Time
Site: Grand Gulf  Entergy icon.png
Issue date: 04/16/1981
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Stampley N
MISSISSIPPI POWER & LIGHT CO.
Shared Package
ML20037D134 List:
References
NUDOCS 8105220040
Download: ML20037D133 (2)


See also: IR 05000416/1981009

Text

[#

7 76

-.g

UNITEJ STATES

o,,

!

NUCLEAR REZULATORY COMMISSION

.o dlD]f qr

o

i-

r

REGION 11

N

'

k

n % p/ /,43

.,***",[

101 MAnlETTA sT., N.W., SUITE .100

/;

,

C

.T_Ts o..no.. .o

APR 161981

F, S F 6

a

Mississippi Power and Light Company

-

s

,

ATTN:

N. L. Stampley

'~

'8, 6

c

Vice President of Production

?y

yf

Q

P. O. Box 1640

v

Jackson, MS 39205

'W g

Gentlemen:

7

/

Subject: Report Nos.J0 TT578iFEb antM31'117/81-0 D

1

This refers to the routine safety inspection conducted by T. D. Gibbons of this

office on March 31 - April 3, 1981, of activities authorized by NRC Construction

Permit Nos. CPPR-118 and CPPR-119 for the Grand Gulf facility and-to the discus-

sion of our findings held with G. B. Rogers at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the irispection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no violations or deviations were disclosed.

~

We have examined actions you have taken with regard to previously identified

enforcement matters and unresolved items. The status of these items is discussed

in the enclosed report.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspec-

tion report will be placed in the NRC's Public Document Room.

If this report

contains any information that you (or your contractor) believe to be proprietary,

it is necessary that you make a written application within 20 days to this office

to withhold such information from public disclosure. Any such application must

include a full statement of the reasons on the basis of which it is claimed that

the information is proprietary, and should be prepared so that proprietary

information identified in the application is contained in a separate part of the

I

document.

If we do not hear from you within the specified period, the report

'

will be placed in the Publu: Document Room.

Should you have any questions concerning this letter, we vill be glad to discuss

them with you.

l

Sincer ly,

Y,

s

1 -

/R. C. LeGifs, Acting Director

.

Division of Resident and

Reactor Project Inspection

Enclosure: See Page 2

,

l

!

s1052200TO

o

/

.

,

/

Mississippi Power and Light Company

2

APg } g gggg

Enclosure:

,

Inspection Report Nos. 50-416/81-09

and 50-417/81-06

cc w/ encl:

C. K. McCoy, Plant Manager

.

r

l

.

.

l

-

l

t

1

-

.

E

-

)