Forwards IE Insp Rept 50-328/81-13 on 810331-0403.No Noncompliance Noted
ML20037D120
Person / Time
Site: Sequoyah 
Issue date: 04/15/1981
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML20037D121 List:
References
NUDOCS 8105220027
Download: ML20037D120 (2)


See also: IR 05000328/1981013

Text

. . .

.

.. .

M

- 1 ..

i."

-

~

'

-

TKL

,

UNITED STATES

o

!"

NUCLEAR REGULATORY COMMISSION

~

o

3

$

REGION 11

101 MARIETTA ST., N.W., SUITE 3100

ATLANTA, GEORGIA 30303

,

.....

s

APR 151981

e

1

V,-

Tennessee Valley Authority

p

s.

,

ATTN:

H. G. Parris

M

L

"l

MF-T

-

9

Manager of Power

500A Chestnut Street Tower II

'd

b'

  1. "

9

$

Chattanooga, TN 37401

70 o.s.TjAc*

4/

Gentlemen:

(

Subject: Report No.h/81-lh

This refers to the routine inspection conducted by A. B. Ruff of this office on

March 31 through April 1-3, 1981, of activities authorized by NRC Construction

Permit No. CPPR-73 for the Sequoyah facility and to che discussion of our

findings held with G. Stack at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no violations or deviations were disclosed.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspec-

tion report will be placed in the NRC's Public Document Room.

If this report

contains any information that you (or your contractor) believe to be proprietary,

it is necessary that you make a written application within 20 days to this office

to withhold such information from public disclosure. Any such application must

include a full statement of the reasons on the basis of which it is claimed that

the information is proprietary, and should be prepared so that proprietary

information identified in the application is contained in a separate part of the

document.

If we do not hear from you within the specified period, the report

will be placed in the Public Document Room.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sinc

ly

j

-

h R. C5 Lewid[ Acting director

v

Division of Resident and

Reactor Project Inspection

Enclosure: (See page 2)

%'10 5MGM

q)

. ..

.4

'

,-

D

em

Tennessee Valley Authority

2

APR 151981

1

l

Enclosure: Inspection Report

No. 50-328/81-13

cc w/ encl:

H. J. Green, Division Director

G. G. Stack, Project Manager

J. M. Ballentine, Plant

Superintendent

J. F. Cox, Supervisor, Nuclear

Licensing Section

M. J. Burzynski, Project Engineer

H. N. Culver, Chief, Nuclear Safety

Review Staff

.

- ----*

.

.