umu Metropolitan Edison Company Post Office Box 480 f g' Middletown. Pennsylve lia 17057 gj 717 944-4041 Writer's Direct Dial Number November 17, 1980 TLL 473 Office of Inspection and Enforce =ent Attn:
B. H. Grier, Director Region I U. S. Nuclear Regulatory Conmission 631 Park Avenue King of Prussie, Pa.
19406
Dear Sir:
Three Mile Is'.and Nuclear Station, Units 1 and 2 (TMi-1 and TMI-2)
Operating License Nos. DPR-50 and DPR-73 Docket Nos. 50-289 and 50-320 Supplerental Response to IR 79-23/28 As discussed in the Septenber 11, ICC0 tacting between representatives of Met-Ed and the NRC. enclosec please find sugglenental response to our letters of May 5, 1980 and August 14, 1980.
Sincerely, r
. 6.'Hukill Director, TMI-l HDH:LWH:hh Enclosures cc:
J. T. Collins B. J. Snyder R. W. Reid D. Dilanni H. Silver
%OS
- b. -iL 4
Metreochtan Ed; son Company is a Member of the General Pubhc Ut;!, tees System
Enclosuro 1 TLL 473 Response to Infraction F(2)
A permanent change request (PCR) will be submitted to Mechanical Draft Cooling Tower Operation (0P1104-37 Rev. 11) in order to establish the priority and methods for =easurement of AT as:
1.
Control Room AT recorder 2.
Recorders in the Mechanical Draft Gooling Towers 3.
Other methods such as bucket thermometer (sensor) with
-manual recording or plant computer with manual recording.
This PCR will be implemented by December 1, 1980.
Response to Infraction F(3)
Sa=ple collection sheets during the period of April to November 1979 were completed by the RS&EE Croup from April to September 15 and from September 15 to November 30, 1979 by Porter-Gertz consultants..During the inspection the collection s' aets were packed in boxes in transit to the TMI-l Warehouse.
These sample collection sheets were, subsequently, retrieved from the warehouse and are now on file in the office of the TMI/EIA Group.
Response to Infraction I Unit 1 See responses to Infraction F(2) concerning recording alternatives.
When employed, these records will be maintained for the life of.the p2 nt in accordance with Section 2 of the ETS.
Unit 2 Operators will be instructed to monitor: strip charts in accordance with procedure OP2104 for Technical Specification Violations of station AT.
If the control room recorders are inoptrable or offscale,.
the recording will be done in accordance with the response described in Item F(2) above.
Response to Infraction J Operators have been instructed to review strip charts for Technical Specification Violations of AT.
Corrective actions and reports will be initiated in accordance with station procedures.
Response to Infraction K In order to assist in the prevention of recurrence, the operators.were instructed in the operation of'the Mechanical Draft Cooling Fans as related to storm front.
a-x--
a
Enclosura 1 TLL 473 Management Controls 4
(
On August 1, the position of Director Radiological and Environmental Controls was established in order to provide greater management responsibility and coordination of radiological and environmental activities.
(See TSCR-93 dated August 7, 1980) 4 Additionally, increased manpower and responsibility through the supervisor of the Environment Assessment Group concerning all aspects of the environmental monitoring program have been implemented.
t The formation of the GPU Nuclear Group on Septembet IS, 1980 has further consolidated the assets of JCP&L and GPUSC with those of Metropolitan Edison Company to provide greater resources and uniformity.
(See TMI-l Amendment 58)
The Licensing Section under the direction of the Director of Technical Functions has 1
established an environmental licensing manager to establish greater interface capability with local state and Federal governments concerning licensing issues.
t i
1 1
-+ pew-w-
p.f+-
'- t e t- -,W rry-9 W+,-w-tw4 y
a -s e y
=
4 y N
w--
-r n
1 964 af 'M-@
e rw
a-
~
,,, as e Mstopo:!tm E(oco comp:ay 3
C y/ !f Post Office Box 480 li 7, _$,. e[' d / L,I ] l, f
yJ.
J,g...
M Middletown. Penruvivan:.17c57 717 9444 041 wtes osent n nvarou TAugust 14~,- 1980 '
tLL 369 Office of Inspection cnd Enforce:nent Lt:d:
B. H. Grier, Director Region I
~
U. S. Nuclear Regulatory Cc:snission 631 Park Avenue King of Prussia, PA 19406
Dear Sir:
Three Mile Island Nuclear Station, Unit I and II (IMI-1 and TMI-2)
Operating License Nos. D?R-50 and DPR-73
' Docket Nbs.'50-289 and 50-320 Inpsection Report Nos. 50-289/79-23 and 50-230/79-28 Enclosed please find an additional response to the subject Inspection Report as requested in your letter of July 11, 1980.
Sincerely, E}gne 1 J. G. Hercetti J.
G.' H.rbein Vice President W.I-I
.!GH:DGM:le.a Encicsure 4
cc:
J. T. Collins R. V. Reid D. Dilanni H. Silver B. J. Snyder f
m D
{lT 67
=U Sin 10 d
\\@
r Mmrcocktan Edison Com;:any is a Mernter of the Generar Pub!ic UMtes System