Forwards IE Insp Repts 50-413/80-35 & 50-414/80-35 on 801117-21.No Noncompliance Noted
ML20037C367
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 12/22/1980
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
Shared Package
ML20037C366 List:
References
NUDOCS 8102040775
Download: ML20037C367 (2)


See also: IR 05000413/1980035

Text

!

g

,

'

.

' {'#

p uog

o

UNITED STATES

O a!"

p' n

NUCLEAR REGULATORY COMMISSION

'

,,

o, .

, [i

necio~ ii

.

101 MARIETTA sT., N.W.. SUITE 3100

'g

AT8 ANTA, GEORGIA 30303

DEC 2 2 to80

.. -

In Reply Refer To:

RII:PKV

'

50-413/80-35

50-414/80-35

Duke Power Company

ATTN:

W. O. Parker, Jr.

Vice President, Steam Production

P. O. Box 2178

Charlotte, NC 28242

Gentlemen:

This refers to the inspection conducted by P. K. VanDoorn of this office on

November 17-21, 1980, of activities authorized by NRC Construction Permit Nos.

CPFR-116 and CPPR-117 for the Catawba facility, and to the discussion of'our

findings held with D. L. Freeze at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were disclosed.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20 days

to this office to withhold such information from public disclosure. Any such

application must include a full statement of the reasons on the basis of which

!

it is claimed that the information is proprietary, and should be prepared so

l

that proprietary information identified in the application is contained in a

l

separate part of the document. If we do not hear from you in this regard within

the specified period, the report will be placed in the Public Document Room.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

l

Sincerely,

d

.~

,

.

,

l

...

,

(

C. E. Murphy," Chief

.

,

' Reactor Construction and Engineering

l

Support Branch

(

!

Enclosure:

(See Page 2)

i

O

.

<

-

.

.

I

c

,

.%

Duke Power Company

-2-

0EC 2 21o80

Enclosure:

Inspection Report No. 413/80-35

and 50-414/80-35

cc w/ encl:

J. W. Hampton, Station Manager

D. G. Beam, Project Manager

.