Text
!
g
,
'
.
' {'#
p uog
o
UNITED STATES
O a!"
p' n
NUCLEAR REGULATORY COMMISSION
'
,,
o, .
, [i
necio~ ii
.
101 MARIETTA sT., N.W.. SUITE 3100
'g
AT8 ANTA, GEORGIA 30303
DEC 2 2 to80
.. -
In Reply Refer To:
RII:PKV
'
50-413/80-35
50-414/80-35
Duke Power Company
ATTN:
W. O. Parker, Jr.
Vice President, Steam Production
P. O. Box 2178
Charlotte, NC 28242
Gentlemen:
This refers to the inspection conducted by P. K. VanDoorn of this office on
November 17-21, 1980, of activities authorized by NRC Construction Permit Nos.
CPFR-116 and CPPR-117 for the Catawba facility, and to the discussion of'our
findings held with D. L. Freeze at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were disclosed.
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If this
report contains any information that you (or your contractor) believe to be
proprietary, it is necessary that you make a written application within 20 days
to this office to withhold such information from public disclosure. Any such
application must include a full statement of the reasons on the basis of which
!
it is claimed that the information is proprietary, and should be prepared so
l
that proprietary information identified in the application is contained in a
l
separate part of the document. If we do not hear from you in this regard within
the specified period, the report will be placed in the Public Document Room.
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
l
Sincerely,
d
.~
,
.
,
l
...
,
(
C. E. Murphy," Chief
.
,
' Reactor Construction and Engineering
l
Support Branch
(
!
Enclosure:
(See Page 2)
i
O
.
<
-
.
.
I
c
,
.%
Duke Power Company
-2-
0EC 2 21o80
Enclosure:
Inspection Report No. 413/80-35
and 50-414/80-35
cc w/ encl:
J. W. Hampton, Station Manager
D. G. Beam, Project Manager
.