Forwards IE Insp Repts 50-010/75-22,50-237/75-27 & 50-249/75-24 on 751215-17,19,22-23,30 & 760108 & 13
ML20037B134
Person / Time
Site: Dresden  
Issue date: 02/05/1976
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Brian Lee
COMMONWEALTH EDISON CO.
Shared Package
ML20037B135 List:
References
NUDOCS 8009040641
Download: ML20037B134 (2)


See also: IR 05000010/1975022

Text

__

_.

- _ - _ _ _ _ _ _ _ _ _

_ _ _ _ _ _ _ _ _ - - _ _ _ . .- _ _ - --_ ___.--_ ______ . _

~M=

'

j

. E27CM '

g

..

,

,

'

-

lJtM v

)

UNITEo STATES

NUCt. EAR REGULATORY COMMISSION

REGION til

799 ROOSEVELT RO AO

,

,

OLEN ELLYN, ILLINOIS 60137

FEB

5 1G6

Cosssonwealth Edison Company

Docket No< O

ATTN: Mr. Byron las, Jr.

Docket No. 50-237

Vice President

Docket No. 50-249

P. O. Box 767

Chicago, T114nois

60690

Centlement

This refers to the inspection conducted by Messrs. Johnson

and. Harpster of this office on December 15-17, 19, 22-23, and

30, 1975, and January S and 13, 1976, of activities at Dresden

Nuclear Power Station 1* nits 1, 2 and 3 authorized by NRC

Operating Licenses No. DPR-2, No. DPR-19 and No. DPR-25 and to

the discussion of our findings with Messrs. Stcphenson and

Abel and others of your staff at the conclusion of tite inspec-

tion.

t

.

A copy of our report of this inspection is enclosed.and identi-

fies the areas examined during the inspection. Within these

,

areas, the inspection consisted of a selective examination of

procedures and representative records, interviews with plant

personnel, and observations by the inspectors.

,

'

No item of nonconpliance with NRC requirements were identi-

fied within the scope of this inspection.

,

In accordance with Section 2.790 of tihe NRC's "Fules of

'*

Practice," Part 2, Title 10, Code of Federal Regulations, a

copy of this letter and the enclosed incpection report will

~

be placed in the ITAC's Public Document Room. If this report

contains any informtion that you or your contractors believe

to be proprietary, it is necessary that you cake a written

application to this office, within twenty days of your

receipt of this letter, to withhold such information from

public disclosure. Any such application must include a full

statement of the reasont for which it is claimed that the

.

/

8009_040 hy (

.

W

-

'i

_ - _ - _ _ _ _ _ _ _ _ _ _ _ _ _

- _ _ _ _ _ _ _

. _ _ .

_ __ a

-

-

_

.-

.

.

.

FEB

5 y ;~

-

2-

Cosmonwealth Edison

--

^

company

.

information is proprietary, and should be prepared so the

proprietary information idt.ntified in the application is

contained in a separate part of the document. Unless we

receive an application to withhold information or are other-

wise contacted within the specified tina period, the written

material identified in this paragraph will be placed in the

t

Public Document Room.

\\

.

.

No reply to this letter is necessary; however, should you

have any questions concerning this inspection, we will be

glad to discuss them with you.

r

i

Sincerely yours,

'

Caston Fiore111, Chief

Reactor Operations and

_

Huclear Support Branch

'

.

Enclosure:

IE Inspection Reports No.

050-010/75-22 and No.

050-237/75-27 and No.

050-249/75-24

ee w/encli

B. B. Stephenson

.

Station Superintendent

bec w/ enc 1:

PDR

local PDR

NSIC

TIC

Anthony Roisran, Esq.

.

O

e

e

O

O

IN

.

l

!