Text
-
Commonwe:lth Edison p).
(
One First Natsnal Plaza. Chicago, lihnois Address Reply to: Post Office Box 767 Chicago. Illinois 60690
(
January 4, 1978 Mr. James G. Keppler, Director Directorate of Inspection and Enforcement - Region III U. f', Nuclear Regulatory Commission 793 Roosevelt Road Glen Ellyn, IL 60137
Subject:
Dresden Station Units 1, 2 and 3 Response to IE.tnspection Report Nos. 50-10/77-34, 50-237/77-31, and 50-249/77-29 NRC Docket Nos. 50-10/237/249
Dear Mr. Keppler:
The following is in response to an inspection conducted by Dr. M. J. Oestmann and Mr. W.
L. Axelson of your staff on November 7-11, 1977, of activities at Dresden Station.
Mr. W.
L.
Fischer's letter dated December 14, 1977, indicated that one item appeared to be a deviation from a previous commitment to the NRC.
This item is addressed in the Attachment to this letter.
Please refer any additional questions you might have to this office.
Very truly yours, Cordell Reed Assistant Vice President Attachment
\\hb C
93 3 8009.0307h7
Commonwaalth Edicon NRC Dockst Nos. 50-10 50-237 Attachment 50-249
(
Deviation:
Contrary to'Section 9.1, Paragraph 7, of'the Generating Stations Emergency Plan (GSEP), the licensee failed to conduct an annual review of the emergency plan implementing procedures for the Directors of the following GSEP groups:
command center; intelligence, medical, information; manpower and logistics, communications, aerial logistics, accounting; legal; engineering; system power supply load dispatcher; and the six division group directors.
Corrective Action Taken and the Results Achieved:
Implementing procedures for the Directors of the command center, intelligence, medical, information, manpower and logistics, communication, aerial logistics, accounting and system power supply load dispatcher GSEP groups were reviewed on November 16, 1977.
The procedure for the division group was reviewed on January 3, 1978.
New procedures for the Directors of the legal and engineering groups have been written and were reviewed and approved on January 4, 1978.
Date of Full Compliance:
l Full compliance was achiaved on January 4, 1978.
l 1
l l