ML20037B066

From kanterella
Jump to navigation Jump to search
Forwards Response to NRC Re Violation Noted in IE Insp Repts 50-010/77-34,50-237/77-31 & 50-249/77-29. Corrective Actions:New Procedures for Directors of Legal & Engineering Groups Written & Approved
ML20037B066
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 01/04/1978
From: Reed C
COMMONWEALTH EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20037B065 List:
References
NUDOCS 8009030769
Download: ML20037B066 (2)


Text

-

Commonwe:lth Edison p).

(

One First Natsnal Plaza. Chicago, lihnois Address Reply to: Post Office Box 767 Chicago. Illinois 60690

(

January 4, 1978 Mr. James G. Keppler, Director Directorate of Inspection and Enforcement - Region III U. f', Nuclear Regulatory Commission 793 Roosevelt Road Glen Ellyn, IL 60137

Subject:

Dresden Station Units 1, 2 and 3 Response to IE.tnspection Report Nos. 50-10/77-34, 50-237/77-31, and 50-249/77-29 NRC Docket Nos. 50-10/237/249

Dear Mr. Keppler:

The following is in response to an inspection conducted by Dr. M. J. Oestmann and Mr. W.

L. Axelson of your staff on November 7-11, 1977, of activities at Dresden Station.

Mr. W.

L.

Fischer's letter dated December 14, 1977, indicated that one item appeared to be a deviation from a previous commitment to the NRC.

This item is addressed in the Attachment to this letter.

Please refer any additional questions you might have to this office.

Very truly yours, Cordell Reed Assistant Vice President Attachment

\\hb C

93 3 8009.0307h7

Commonwaalth Edicon NRC Dockst Nos. 50-10 50-237 Attachment 50-249

(

Deviation:

Contrary to'Section 9.1, Paragraph 7, of'the Generating Stations Emergency Plan (GSEP), the licensee failed to conduct an annual review of the emergency plan implementing procedures for the Directors of the following GSEP groups:

command center; intelligence, medical, information; manpower and logistics, communications, aerial logistics, accounting; legal; engineering; system power supply load dispatcher; and the six division group directors.

Corrective Action Taken and the Results Achieved:

Implementing procedures for the Directors of the command center, intelligence, medical, information, manpower and logistics, communication, aerial logistics, accounting and system power supply load dispatcher GSEP groups were reviewed on November 16, 1977.

The procedure for the division group was reviewed on January 3, 1978.

New procedures for the Directors of the legal and engineering groups have been written and were reviewed and approved on January 4, 1978.

Date of Full Compliance:

l Full compliance was achiaved on January 4, 1978.

l 1

l l