ML20037A697

From kanterella
Jump to navigation Jump to search
Forwards Amends to 10CFR50,App D Which Include Clarification Re Facilities Affected by Section E of App D.Section E Requires Util to Provide AEC Before 711019 W/Reasons for Not Suspending CP Pending Completion of NEPA Review.W/O Encls
ML20037A697
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 09/24/1971
From: Price H
US ATOMIC ENERGY COMMISSION (AEC)
To: Perez A
FLORIDA POWER CORP.
References
NUDOCS 8003260708
Download: ML20037A697 (1)


Text

--

4%

unm a srares

'I i'1' d,h crCMIC ENERGY COMMISGlON

ME Pj m s,nuc m s.o.-

me 9,

n)

'/

/

k,s

ENVIRON, F!LE (NEPA)

- BA

.30-302 Mr. /s. P. Percz, President Florida Power Corporction 101 Fifth Strcct South St. Petersburg, Florida 33701

Reference:

CPPR-51

Dear Mr. Perez:

Enclosed for your inforuation are recent clarffying acendments to the revised Appendix D to 10 CFR Part 50 of the Co::aicsion's regulations.

l These amenduents include cicrification as toAhich facilities will bc l

affected by Section E of Appendix D.

Under the provisions of Section E of Appendix D you are required to

~

furnish to the Cc:sission before October 19, 1971, er such other later date es vy 1.e zpproved by the Cocaission upon good cause shown, a uritten sectcrant of any rensons, with supporting factual subniscion, why, with reference to the criteri'a in paragraph 2 of Section E, your per=it should not be suspended, in whole or in part, pending comple-i tion of the NEPA environ ~cntal review specified in Section B, C or D of Aprendix D, as appr,opriate.

You are requested to submit 50 copics of the written statement and any supporting factual material.

Sincerely, l

Harold L. Price Director of Regulation g

Enclosure:

Amendments to Revised t

Appendix D 8003260 h0E en p p u<p.yy/a u39 A

LE

- - _ - -