ML20037A592
| ML20037A592 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 05/18/1978 |
| From: | Barrett L Office of Nuclear Reactor Regulation |
| To: | Reid R Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8003160028 | |
| Download: ML20037A592 (2) | |
Text
.
_. ~.
,,,x.m. _ -.
.m m.,. m.,-m..--- r c,, m ym.% ~
-,. -,. ~
.m.+--
c_
.c.
,,.,.m o-m%.
%s,
+-
-e- --
,...,.v..,.
~-
.-.,,a.,
,- _,.cp.
.. a.
p e, ps.,. 6 -s,cg; ;., - 2 @...d,; r *. s,
a
-=
a
.;-r.
. n 2;3 r.. ;,.g s + *, s p. - --
. v~c.
c-*
's.w >
.,,, - G
, - J *. ya
'n,.w:w -
s:.14. /
y, Q c.c.s f g A=. m -
3:yi
.R *
~}
?-
-g
.y*'
g
,('
- ~
. ?.g [
g.
_ u...
m.
~"**-%-
\\
..r-
.x.
~
MAY 181978 T-
=
i l'EMORAN00M FOR:
R. W. Reid, Chief, Operating Reactors Branch f4, 00R
~
FEC:h Acting' Chief, Enviroment21 Evaluaticn Branch, 00R SUEJECT:
~UNPLA!MED RADI0 ACTIVE RELEASES OF GASEQUS EFFLUENTS,
~ CRYSTAli kIVER.lmIT NO. 3
-I 9
~
On October 11, 1977, Florida Power Corporation (the licensee) submitted Technical Specification change Request No.11 recuesting an amendnent to Operating License Ho. OPR-72. of Crystal River Unit No. 3.
The proposed char.ge, '....ich was reviewed and deterniced to be acceptable, allched the licensee not to submit a Non-routine Report folicwing an unplanned re-lease af radioactive caterial if the release from the site is less than 10% of the allemble inttantaneous release rate.
In the same submittal, the licensee cormitted i.o take corrective action to srr>ent the recurrence of rmrous unplanned radictictiva gasccus re-lease.
Specifically, the licensee stated tMt "At pr escnt, the (FMR) awned average 45 day iuldup tira for icaLage is rot Lek,g obtained.
F h riria Pc':2r is taking s eps to ensure that the ganeus watte disposal system will Nrate as designud with identifieu heiduo tine."
have not been informcd by the 1;censee on his crcoress of liniting un-
- enced releases cr le1Nges such that the designed gcsecus tisste di:posal system verage holeup t me can be ach Sved. On tno Otner hand, we hcVe re-ceived Leas indicating recurrences of unplanned releases since their October 11, 1977 subnittal.. The attached question should be seat to the.
~
licensee requerting him to provide infonation with regard to his corrective-action to linit unplanned gaseous releases.
w.
'~ 3 f M m~
n..
. ~.
.i
'?~
t ?H.EBarrett as
~
~
a
~: ~<
D ', p
..g g
. 9' 9~- D Acti g Ch'ieff f/h
' I.*
~
~
i
- Environnental Evaluation Branch; 1
' <n
& ;$ Division of Operating Reactors ~
~~T
~
_N b
Enclosure:
As stated
~-
~i~
Tj
~]
7 DISTRIBUTION
. Central: files -
. R.
L D. Eisenhut
' *' ;j+$ N
" L 5^I I c'
cc:
V. Stello
~
eJ a v
ar t1
.a. erimes
+
y
,w n,m.%l.,. -
- 1bW%%-:
4
- %,Q Y, h.E
~
C, Ng}$0n
". 80831;600.2 7P[- _dNft,- -
~
'J. Collinsi '
t c _,,,
.[ h ggird tham [ ~
.EEB/ DOR M,.Uih.DM A ' AHNEk c
o,,,u y oy
. x.
i. taps, mom a
__D. f. [ MM y
-, *, ~
' ~ _,,
3D
__,2
...e M tp--g/EEE- ~
~
g,79,g 1_
sn
,,7j,y- ~ 4,y;;7,gg:z
- x..
=" %tet -n-La 0^"
.b" M i
-f
-l
.2
'])
Question to Crystal River Unit No. 3 Regarding Corrective Action to Prevent Unplanned Releases At lease six instances of unplanned gaseous releases at Crystal River Unit tio. 3 have been reported since commercial operation in March,1977.
In the attachment to your letter of October 11, 1977, you stated that, "At present, the (FSAR) assumed average 45 day holdup time for leakage is not being obtained.....
Florida Power is taking steps to ensure that the gaseous waste disposal system will operate as designed with the identified holdup time."
Please report your progress on the above mentioned steps.
Your reply should include the following:
(1) Identify causes of unplanned releases and excessive leakages; (2) Corrective action (e.g., system design modifications) that you have taken to limit the instances of unplanned releases; (3) Resuic of corrective action, including an assessment of the present average waste gas hoiduo time.
.