ML20037A461

From kanterella
Jump to navigation Jump to search
Notice of Proposed Licensing Amend Requesting Tech Spec Changes to Reflect Analyses Performed for Facility Cycle 2 Reload
ML20037A461
Person / Time
Site: Oconee 
Issue date: 04/02/1976
From: Goller K, Purple R
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20037A462 List:
References
NUDOCS 8001310628
Download: ML20037A461 (4)


Text

, _ -

s t. o!

m I

  • /vI NOTICING OF PEOPOSED LMF'.':M *"21 87

.e I.!CTSc~r:

Duke Power Cc=pany s

Technical Specification changes to reflect the analyses REQUEST FOR:

perfor=ed for Oconee Unit 2 Cycle 2 reload.

t REQUEST DXIE:

February 25, 1976 PROPOSED ACTICS:

( X)

Prc-notice Reccc:: ended

( )

Post-not. ice de:cm.cnded s

( )

De:cr=ination ticl:tyed pendini:

corpictica -i dai'c:y.caluntion BASIS FOR DECITION:

Changes introduced in the Cycle 2 reload include the fellevin; 1)

A change in the rese:or variable icv pressure tric, 2)

The use of nessured pr. sry cociant flev rea::or :n:n design flew in the :acr:al-hyd::uli: desi:n analysis, 3)

The application of the BNJ-2 Critical F.ea: Flux (C:!?)

Correlatien ra:her :han :he W-3 correla:Len as used in Cycle 1, and D OfTp 4)

Two 17 x 17 F.srk C desenstratica fu'el asse=b'.ies.

GQ Ite

1) above invol/es a rels:ca:ica of a li=itinz safety OM~Q~}A systr. setting; ::::a 2) and 3) aseve involve changes :o q

the bases fer :he :2:ent:21 s:ecific2:tonc: :ne, ::e= a pJ_u-J above involves the uce ci two fuel asse blies si:nifican:lv differen: frem th:s e ':eing rep' ced.

In view of the aseve, it is concluded tha: tha tr:pesed a end:ent involves sig.i-fican: hazards cens-ders:icns anc a Fre-no: ice is :nerefere recc= ended J

1 CONCURRENCES:

DATE:

Concurrence in PD constitutes 1,

a concurrence in Ltr to Licensee hD,Th f.

Y 2[ 7[

and Federal Register Notice 2,

M'(

d /]/>g S.

K. "

411er 4.

OELD, g/ '

Gj

,y'_ C -i

~

e i

1 8001

g

-m 3,I **,'

(f

-x a

_2_

PROPOSED NEPA ACIION:

( )

EIS Required

( ) Negative Declaration (ND) and Environmental Impact Appraisal (EIA) Required (X ) No EIS, ND or EIA Required

( )

Determination delayed pending completion of EIA BASIS FOR DECISION:

'a'e have deter =ined that the a=cndment does not authorize a change in effluent types or total amounts nor an increase in power level and vill not result in any significant environ-mental i= pact.

Having =ade this determination, we have further concluded that the amend ent involves an actica which is insignificant from the standpoint of environ = ental i= pact and pursuant to 10 CFR 551.5(d)(1) that an enviren= ental-statement, negative declaration, or enviren= ental impact appraisal need not be preparec in connection with the issuance o,f this a:end:ent.

D OM

~

oWb og-old JD.Likl_

k e

9

q Oconee Technical Specificatiens - 4.11 4 ~.'11.1

. Change.to read.- Envircamental sanples taken in accordance-with-Table 2-la of' the FSAR shall be ' collected and processed in accordance with Table 4.11-1 of these specifications.

4'.11.3 Add specification "The location of cows and/or go~ats use'd as a direct source of milk for individuals, and the location of dairies within five miles of the plant will be determined annually by survey and reporced with the results -of the radiological environmental. monitoring-p rogram.

Table 4.11-1 Incorporate the followin's changes :

a)

Change Schedule for Air Particulate from " Monthly" to

" Monthly, charcoal filter-weekly."

b)

Change Schedule for Xilk from " Quarterly" to " Weekly."

c)

Add to Analvsis for Water. Rain, Settled Dust, and Air.

Particulate. gamma analysis on quarterly composite samples.

d)

Add to Analvsis for Air Particulate, gamma analysis

[

for I-131.

e)

Add to Analysis for Veeetation, Terrestrial ~, Aquatic Organisms, and Bottom Sediment, gamma analysis quarterly.

f' f)

Change footnote from "* Dependent on gross activity"' to

"* Dependent on gross activity for individual samples."'

4 f

U j

d 10 4

.a

- mm.

m-

.. m*..

m

.s

-