ML20036C351

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-424/93-07 & 50-425/93-07 on 930328- 0501 & Notice of Violations
ML20036C351
Person / Time
Site: Vogtle  
Issue date: 05/25/1993
From: Herdt A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Hairston W
GEORGIA POWER CO.
Shared Package
ML20036C352 List:
References
NUDOCS 9306160166
Download: ML20036C351 (3)


See also: IR 05000424/1993007

Text

_ _ _ _ _ _ - - - - -

.

.

..

.

.

.

MAY 251993

,

Docket Nos. 50-424, 50-425

'

License Nos. NPF-68. NPF-81

Georgia Power Company

ATTN: Mr. W. G. Hairston, III

Senior Vice President -

Nuclear Operations

P. O. Box 1295

Birmingham, AL 35201

i

Gentlemen:

'

SUBJECT: NOTICE OF VIOLATION

(NRC INSPECTION REPORT N05. 50-424/93-07 AND 50-425/93-07)

This refers to the inspection conducted by B. Bonser of this office on

March 28 - May 1, 1993. The inspection included a review of activities

j

authorized for your Vogtle facility. At the conclusion of the inspection, the

4

findings were discussed with those members of your staff identified in the

enclosed report.

,

Areas examined during the inspection are idar.l.ified in the report. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observation of

activities in progress.

Based on the results of this inspection, certain of your activities appeared

to be in violation of NRC requirements, as specified in the enclosed Notice of

Violation (Notice).

In addition, the enclosed Inspection Report identifies

activities that violated NRC requirements that will not be subject to

enforcement action because the licensee's efforts in identifying and/or

correcting the violation meet the criteria specified in Section VII.B. of the

Enforcement Policy.

You are required to respond to this letter and should follow the instructions

specified in the enclosed Notice when preparing your response.

In your

response, you should document the specific actions taken and any additional

actions you plan to prevent recurrence. After reviewing your response to this

Notice, including your proposed corrective actions and the results of future

inspections, the NRC will determine whether further NRC enforcement actions is

necessary to ensure compliance with NRC regulatery requirements.

The responses directed by this letter and the enclosed Notice are not subject

to the clearance procedures of the Office of Management and Budget as required

by the Paperwork Reduction Act of 1980, Pub. L. No.96-511.

In accordance with 10 CFR 2.790(a), a copy of this letter and its enclosure

will be placed in the NRC Public Document Room.

9306160166 930525

11

PDR

ADOCK 05000424

i

O

PDR

m

-

-

.

_

.

..

.-

.

.

,

MAY 2.; 1993

Georgia Power Company-

2

1

!

Should you have any questions concerning this letter, please contact us.

Sincerely,

f

ORIGIMAL NcNgo gy

ALAN R. ftgtyr

Alan R. Herdt,' Chief

l

Reactor Projects Branch 3

i

Division of Reactor Projects

Enclosures:

1

1.

Notice of Violation

2.

NRC Inspection Report

3

cc w/encls:

R. P. Mcdonald

Executive Vice President

i

Nuclear Operations

i

Georgia Power Company

P. O. Box 1295

Birmingham, AL 35201

C. K. McCoy

Vice President-Nuclear

Georgia Power Company

P. O. Box 1295

i

Birmingham, AL 35201

i'

W. B. Shipman

General Manager, Nuclear Operations

'

Georgia Power Company

P. O. Box 1600

Waynesboro, GA 30830

J. A. Bailey

Manager-Licensing

Georgia Power Company

P. O. Box 1295

Birminch m AL 35201

,

'

Nancy G. Cowles, Counsel

Office of the Consumer's

.

Utility Council

1

54 Peachtree Street, NW, Suite 201

Atlanta, GA- 30303-2318

Office of Planning and Budget

!

Room 615B

!

270 Washington Street, SW

i

Atlanta, GA 30334

i

cc w/encls: Continued page 3

i

,

i

-

.

.

.

.

.

-

.

.

.

MAY 2 51993

i

Georgia Power Company

3

cc w/encls: Continued

Office of the County Commissioner

Burke County Commission

Waynesboro, GA 30830

t

Harold Rehei.s, Director

i

Department of Natural Resources

205 Butler Street, SE, Suite 1252

Atlanta, GA 30334

j

Thomas Hill,. Manager

Radioactive Materials Program

,

Department of Natural Resources

4244 International Parkway

Suite 114

'

Atlanta, GA 30354

Attorney General

Law Department

132 Judicial Building

Atlanta, GA 30334

,

Dan H. Smith

'

Vice President

Power Supply Operations

Oglethorpe Power Corporation

'

2100 E. Exchange Place

Tucker, GA 30085-1349

i

Charles A. Patrizia, Esq.

,

Paul, Hastings, Janofsky & Walker

12th Floor

1050 Connecticut Avenue, NW

Washington, D. C.

20036

.

bcc w/ encl:

D. Seymour, RII

D. Hood, NRR

i

P. Skinner, RII

A. Herdt, RII

,

S. Vias, RII

Document Control Desk

NRC Resident Inspector

U.S. Nuclear Regulatory Commission

P. O. Box 572

r

,

Waynesboro, GA 30830

RII:DRP

RIl ) # -

'

FILE: VG307RPT.DAS-

r

P k nner.

f/11/93

g/93

i

1

l

-

.