ML20036C335

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-321/93-06 & 50-366/93-06 on 930411- 0508 & Notice of Violation.Nrc Concerned About Length of Time Before Problem Re Loss of Shutdown Cooling Identified
ML20036C335
Person / Time
Site: Hatch  
Issue date: 06/01/1993
From: Herdt A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Hairston W
GEORGIA POWER CO.
Shared Package
ML20036C336 List:
References
NUDOCS 9306160132
Download: ML20036C335 (5)


See also: IR 05000321/1993006

Text

--

0-

.

e

i

JUN 011993

Docket Nos. 50-321 and 50-366

License Nos. DPR-57 and NPF-5

Georgia Power Company

~

ATTN: Mr. W. G. Hairston III

Senior Vice President-

Nuclear Operations

P.O. Box 1295

Birmingham, AL 35201

Gentlemen:

SUBJECT: NOTICE OF VIOLATION

(NRC INSPECTION REPORT NOS. 50-321/93-06 AND 50-366/93-06)

This refers to the inspection conducted by L. Wert of this office on

April 11 - May 8, 1993.

Tl.e inspection included a review of activities

authorized for your Hatch facility. At the conclusion of the inspection, the

findings were discussed with those members of your staff identified in the

enclosed report.

Areas examined during the inspection are identified in the report. Within-

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observation of

activities in progress.

Based on the results of this inspection, certain of your activities appeared

to be in violation of NRC requirements, as specified in the enclosed Notice of

Violation (Notice).

Violation A in the enclosed Notice involved a loss of

shutdown cooling. Although the safety significance of this particular event

was small, due to the minimal decay heat load and the availability of other

cooling systems, we are concerned due to the length of time before the problem

was identified. Moreover, if this event had occurred under certain plant

conditions which existed earlier in the outage, a more significant safety

concern could have resulted. As part of your response to this violation,

please describe what actions, if any, are being taken to address overall_

!

awareness and responsibilities of the licensed operators and other plant

workers. Additionally, because the present Unit 1 Technical Specifications do

not contain sufficient require:nents regarding inoperability of shutdown

cooling, please inform us if you plan to submit a Technical Specification

amendment.

In addition, the enclosed Inspection Report also identifies a dosimetry

'

technician who falsified records. This item will not be the subject of

enforcement actions. The basis for this discretion was your prompt

identification, investigation, and correction of this willful violation, which

met the criteria specified in Section VII.B of the Enforcement Policy.

You are required to respond to this 1.etter and should follow the instructions

specified in the enclosed Notice when preparing your response.

In your

9306160132-930601

s

jNg

PDR

ADOCK 05000321

O

PDR

w

_

L

+

4

5

4

Georgia Power Company

2

response, you should document the specific actions taken and any additional

actions you plan to prevent recurrence. After reviewing your response to this

Notice, including your proposed corrective actions and the results of future

inspections, the NRC will determine whether further NRC enforcement action is

necessary to ensure compliance with HRC regulatory requirements.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of

this letter and its enclosures will be placed in the NRC Public Document Room.

The responses directed by this letter,and the enclosed Notice are not subject

to the clearance procedures of the Office of Management and Budget as required

by the Paperwork Reduction Act of 1980, Pub.

L.~ No.96-511.

Should you have any questions concerning this letter, please contact us.

Sincerely,

ORIGINAL s!p 79 gy

ALAN R. H^n3T

Alan R. Herdt, Chief

Reactor Projects Branch 3

Division of Reactor Projects

Enclosures:

1.

Notice of Violation

2.

NRC Inspection Report

cc w/encis:

R. P. Mcdonald, Executive Vice

President, Nuclear Operations

-

Georgia Power Company

P. O. Box 1295

Birmingham, AL 35201

J. T. Beckham

Vice President, Plant Hatch

Georgia Power Company

P. O. Box 1295

Birmingham, AL 35201

H. L. Sumner

[

General Manager, Plant Hatch

Georgia Power Company

Route 1, Box 439

,

'

Baxley, GA -31513

cc w/encls:

(Continued page 3)

6

l

.

.

-

. -

-

- -

- - - -

.

.

.

.

6

JUN 011993

Georgia Power Company

3

cc w/encls: Continued

S. J. Bethay

Manager Licensing - Hatch

Georgia Power Company

P. O. Box 1295

Birmingham, AL 35201

Ernest L. Blake, Esq.

Shaw, Pittman, Potts and

Trowbridge

2300 N Street, NW

Washington, D. C.

20037

Charles H. Badger

Office of Planning and Budget

-

Room 610

270 Washington Street, SW

Atlanta, GA 30334

Harold Reheis, Director

Department of Natural Resources

-205 Butler Street, SE, Suite 1252

Atlanta, GA 30334

Thomas Hill, Manager

Radioattive Materials Program

Department of Natural Resources

,

4244 International Parkway

Suite 114

Atlanta, GA 30354

~

Chairman

Appling County Commissioners

County Courthouse

Baxley, GA 31513

Dan H. Smith

.

.

Vice President

Power Supply Operations

Oglethorpe Power Corporation

2100 E. Exchange Place

,

Tucker, GA 30085-1349

l

Charles A. Patrizia, Esq.

Paul, Hastings, Janofsky & Walker

12th Floor

1050 Connecticut Avenue, NW

Washington, D. C.

20036

bec w/encls:

See page 4

.

4

>

% .

-

o

!

.

.

.

,

-

,

JUN 011991

Georgia Power Company

4

,

bcc w/encls:

K. N. Jabbour, NRR

A. R. Herdt, RII

P. H. Skinner, RII

S. J. Vias, RII

Document Control Desk

t

NRC Resident Inspector

U.S. Nuclear Regulatory Commission

Route 1, Box 725

Baxley, GA 31513

i

!

!

!

f

f

.

.

-i

,

,

FILE: G:\\HT306RPT.DAS

  • FOR P.8EVIOUS CONCURRENC SEE ATTACHED

bb

thj

.l?

5

y

f

l-

  • D eymour

P$kinne

CJehkin

i

C5/ /93

05/{,/93

05/;q/93

7

-_.

.

-.

.

-_

-__

!

c.

-

.

.

o-

,

. Georgia Power Company

4:

i

e

i

" ~

I

bec w/encls:

K. N. Jabbour, NRR

i

A. R. Herdt, RII

'

P. H. Skinner, RII.

.

S. J. Vias, RII

!

Document Contr

Desk

!

i

NRC Reside

Inspector

!

U.S. Nu

'ar Regulatory Commission

i

Route,J, Box 725

Baxley, GA 3I513

i

FILE: G:\\HT306RPT.DAS

gr,

k

^

RII:DRP

RII:DRP

e

PSkinner