Duke 1%er Company Dectric Center P0. Box 1006 Charlotte. N C 282011006 DUKEPOWER May 14, 1993 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C.
20555 RE: Catawba Nuclear Station Docket No. 50-413 and -414 File: GS-801.01
Dear Sir:
Please find attached information concerning the performance and operating status of the Catawba Nuclear Station for the month of April,1993.
Very truly yours, S'0' hhw fgB E. O. McCraw, anager Operations, Performance & Automation E0M/ raw Attachments xc: Stewart D. Ebneter Bob Martin Regional Administrator / Region II Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission 101 Marietta Street, NW, Suite 2900 Washington, D.C.
20555 Atlanta, GA 30323 INPO Records Center Ms. Margaret Aucoin Suite 1500 Nuclear Assurance Corporation 1100 Circle 75 Parkway Suite 200 Atlanta, GA 30323 655 Engineering Drive Norcross, GA 30092-2843 American Nuclear Insurers W. T. Orders c/o Dottie Sherman, ANI Library Senior Resident Inspector Town Center, Suite 300S Catawba Nuclear Station 29 South Main Street West Hartford, CT 06107-2445 I
9305100239 930430 V
8 PDR ADOCK 05000413 i
R PDR
/
g w cr msnae U
U.S. NRC - Catawba May 14, 1993 Page 2 bc: K. S. Canady (EC08H)
B. T. Faulkenberry (EC07C)
R. C. Futrell (CNS)
T. E. Mooney (EC05N)
B. J. Horsley (EC030)
N. A. Rutherford (EC071)
E. G. LaCasse (CNS)
R. A. Williams (EC07A) (3)
J. C. Wimbish (EC078)
E. C. Fisher (MNS)
B. W. Walsh (PB02L)
S. D. Galloway (CNS)
C. D. Denton (PB05E)
J. S. Forbes (CNS)
Candace Paton (PB02L)
G. A. Copp (EC050) (File)
p i
-l t
OPERATINS LATA REPORT 1
. DDCKE1 NO S0-413 IATE May 14. 1993 DPERATING STATUS C0ftPLETED BY R.A.Williass TELEPHONE 704-382-5346
- 1. Unit Nase: Catawba 1
.I
- 2. Reporting Period: April 1, 1993-April 30, 1993 I
- 3. Licensed Thersal Power (MWt):
3411
- 4. Naeeplate Rating (Bress MWe):
1305a Notes aNaseplate Rating f
- 5. Design Electrical Rating (Net MWel:
1145 (Gross MWe) calculated as
- 6. Maxinue Dependable Capacity (Eress MWe):
1192 1450.000 MVA x.90 peser
. 7. Marious Dependable Capacity'(Net MWe):
1129 factor per Page iii, f
B. If Changes Occur in Capacity Ratings (!tess Number 3 Through 7) Since Last NLfRES-0020.
.i Repert. Give Reasons:
{
t
- 9. Fower Level To Whith Restricted, If Any (Net MWe):
- 10. Reisen For Restrictions. If any:
j This Month Yr.-to-Date
.Casulative
- 11. Hours In Reporting Period 719.0 2S79.0 68712.0.
- 12. Naber Of Hours Reactor Was Critical 719.0 2B79.0 51665.6 l
- 13. Reatter Reserve Shotdorn Hours - ' --0 --
[
- 14. Hours Benerator On-Line 719.0 2879.0
~50613.8
- 15. Unit Feserve Shutdown Hours - -
--0--
j
- 16. Ercss Thersal Energy Generated IMWH1 2322940 9591321 16412B129 l
- 17. Eress Electrical Energy Generated (MWH) 825429 3432236 57757455
-i IB. Net Electrical Energy Generated (MWH) 761709 3255115 54220356 i
- 19. Unit Service Facter 100.0 100.0 73.7
- 20. Ur,it Availattility Facter 100.0 100.0 73.7 l
- 21. Unit Capatity Fatter (Using MDC Net!
96.3 100.2 69.6
- 22. Unit Capacity factor (Using DER Net) 95.0 9B.B 69.9
- 23. Un:t Ferced Outage Rate 0.0 0.0 10.5
- 24. Shutdown Scheduled Dver Next 6 !Ionths (Type, Date, and Duration of Eachl:
i Refuelinn - October 20. 1993 - 75' days
-I
- 25. If Shut Down.At End Of Report Period. Estisated Eate of Startup:
j
- 26. Units In Test Status (Prior to Ceseercial Operationi:
Foretast Achieved.
l i
INITIAL CRITICALITY INITIAL ELECTRICITY CCMERCIAL OPERATION i
E
=h 3
i I
q GPERATINS LATA REPORT r
DOCKET ND 50-413 UNIT Cata=ta 1 DATE May 16. 1993 COMPLETED BY P.A. Willian TELEPHONE 704-382-5346 MONTH toril, 1993 If AVERASE DAILY PDiiER LEVEL E
AVERAGE DAILY POVER LEVEL (MWe-het)
(MWe-Net)
(
1
!!24 17 1133 f
2 1134 1B 1133 I
.3 1135 19 1131 i'
4 1130 20 1126 5
1130 El 1126-i f'
l 6
1131 22 1132 7
!!31 23 1110 i
B 1132 24 1129 9
!!29 25 1124
.l 10
!!30 26
!!22 f
11 1130 27 471 12
!!?9 2B 568 13 1131 29 1121 l
.I 14 1127 30 1125 2
1 15 1120
]
16 1127 4
i
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-413 UNIT NAME CATAWDA 1 DATE _ ub/14/ 9J REPORT MONTH April 1993 COMPLETED BY N.
C.
51MMUNS TELEPHONE
(/u4)-JUZ-D2LJ (1) 2)
(4)
(5)
E HOD T
A OF LICENSE N
Y S
SHUT EVENT SYS-CAUSE AND CORRECTIVE O
P DURATION O
DOWN REPORT TEM COMPONENT ACTION TO DATE E
HOURS N
R/X NO.
CODE CODE PREVENT RECURRENCE 2-P 93-4-27 S
A HC HTEXCH REPAIR CONDENSER TUBE LEAK hForced bxhibitG-nstructions i
eason*
ethod:
A-Egyihnent FailureB-Maintenance or test (Explain) l S Scheduled 1-Manual for Preparat on of Data 2-Manual Scram Ent W Snects For Licensee C-Refueling 3-Automatic Scram Event Report (LER (NUREG-0161))
I i
D-Regulatory Rgstriction 4-Other (Explain)
File E-Operator Trgining & License Examination F-Administrative (5)
G-Operator Error (Explain)
Exhibit I - Same Source H-Other (Explain) l 1
l t
MONTHLY REFUELING INFORMATION REOUEST i
1.
Facility name: Catawba.
Unit 1 s
2.
Scheduled next refueling shutdown:_ October 1993 f
3.
Scheduled restart following refueling: January 1994 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S.
CHANGE OR LICENSE AMENDMENT.
THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
If yes, what will these be?
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
t 5.
Scheduled date(s) for submitting proposed licensing action and t
supporting information.
6.
Important licensing considerations (new or different design or
- supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
7.
Number of Fuel assemblies (a) in the core: 1 133 (b) in the spent fuel pool: 408 8.
Present licensed fuel pool capacity: 1418 Size of requested or planned increase: --
9.
Projected date of last refueling which can be accommodated by present licensed capacity: September 2009 DUKE POWER COMPANY DATE:
May 14. 1993 i
f Name of
Contact:
N.
C.
Simmons Phone:
704-382-5263 l
l l
l
i l
6 DOCKET: 50413 UNIT: Catawba 1 Date: 05/14/93 f
NARRATIVE
SUMMARY
MONTH: AprR 1993 i
Catawba Unit 1 began the month of April operating at 100% full power. The unit operated at or near 100%
full power untu 4/27 at 0310 when it started a power decrease. The unit was held at 29% power from 0830 to 4/28 at 0520 to repair a condenser tube leakage. The unit was returned to 100% on 4/29 at 0220. The i
unit operated at or near 100% for the remainder of the month.
I i
I i
i l
P k
i i
i L
v e
b Prepared by N. C. Simmons Telephone: 704-382-5263 i
i
]
t
-i
.(
DPERATINS LATA REPORT
)
1 DOCLET NO 50-414 j
DATEMay 14. 1993 i
DPERATINS STATUS COMPLETED PY F.A. Williaes I
TELEPHONE 704-3B2-5346 l
- 1. Unit hase: Catawta e I
- 2. Reporting Period: April 1,1993-April 30,1993
- 3. Licensed Thersal Power (MWt):
3411
- 4. Naseplate Rating (Bross MWelt 13054 Notes +Naeeplate Fating
- 5. Design Electrical Rating (Net MWel:
1145 (Bross MWel calculated as j
- 6. brisus Dependable Capacity (Bross MWel:
1192 1450.000 MVA
.90 power.
l
- 7. Maxisus Dependable Capacity (Wet MWel:
1129 factor per Fage iii,
'{
E. If Changes Dccur in Capacity Ratings (!tess Nurber 3 Through 7) Since Last NURES-0020.
Report. Give Reasons:
l l
- 9. Power Level To Which Restricted, if Any (het MWel:
- 10. Reason For Restrictions, If any:
This Month Yr.-to-Date Cumulative
- 11. Hours in Reporting Feriod 719.0 2879.0 58728.0
- 12. Nusber Df Hours Reactor Was Critical 719.0 1444.2 44090.6 i'
- 13. Reactor Reserve Shutdown Hours
--0--
--0--
--0--
- 14. Hours Generator On-Line 701.5 1396.9 43242.5
- 15. Unit Feserve Shutdenn Hours -
- --0--
- 16. Brcss Thersal Energy Benerated (MWH1 2225226 4565055 137256201'
.l
- 17. Grcss Electrical Energy Generated (MWH) 791343 1627413 4858B3BB
- 12. Net Electrical Energy Generated (MWH) 749B54' 1527731 45655057
- 19. Unit Servite fatter 97.6 48.5 73.6
}
- 20. Unit Availability factor 97.6 48.5 73.6 j
- 21. Unit Capatity Eatter (Using MDC Net) 92.4 47.0 6B.7.
l
- 22. Unit Capacity Factor tusing DER Net) 91.1 46.3 67.9 l
- 23. Unit forced Catage Rate 0.0 0.0 10.7
'(
- 24. Shuldean Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
None
'25. If Snut Lewn At End Of Report Feriod. Estisated Date of Startup:
i
.26. Units In Test Status (Frict to Ccesercial Operation):
Forecast Achieved-INITIAL CRITICALITY j
INITIAL ELECTRICITY CO VERCIAL DPERATIDN i
i i
f
l E-l GPEEATING LATA REPORT DDCKET WO
'50-616 UNIT Catauba 2 DATEPay 14. 1993 COMPLETED BY R.A. Williaes TELEPHONE 704-382-5346 j
i
?
00hTH April. 1993
[
l l
IH AVEEASE DA!LY PDWER LEVEL
[A1 AVERAGE DAILY POWER LEVEL l
iPWe-Net)
(PWe-het) e t
c; 1
0 17 1161 t
2 198 1B
!!69 3
337 19 1166 I
4 701 20 1154 5
1077 21
!!62
[
6
!!0B 22 1169
.f i-7 1157 23 1167-
+
B 1162 24-1164 l
9
-!!$8 25 1159 10
!!59 E6 1159 l
11 1158 27 1164 i
12 1159 29 1162' 13 1160 29 1165 14 1156 30 1141 j
l 15 1146 l
' i 16 1110
- l i
-I i
?
e u
+
w
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-414 UNIT NAME CATAWUA z DATE ud/14/va REPORT MONTH April 1993 COMPLETED BY
- u. c. 51MMUNS TELEPHONE t/ue)-Juz-dze; (1) 2)
(4)
(5)
E HOD T
A OF LICENSE N
Y S
SHUT EVENT SYS-CAUSE AND CORRECTIVE O
P DURATION O
DOWN REPORT TEM COMPONENT ACTION TO DATE E
HOURS N
R/X NO.
CODE CODE PREVENT RECURRENCE 1
93 1 S
15.57 C
RC FUELXX END-OF-CYCLE 5 REFUELING OUTAGE l-P 93 1 S
B HA TURBIN HOLD TO PERFORM TURBINE OVERSPEED TRIP TEST 2
93 1 S
1.98 B
HA TURBIN TURBINE OVERSPEED TRIP TEST 2-P 93 2 S
B CA XXXXXX FLUX MAPPING 3-P 93 2 S
B CA XXXXXX FLUX MAPPING 4-P 93 3 S
H HB PUMPXX HOLD TO PLACE SECOND FEEDWATER PUMP IN SERVICE 5-P 93 4 S
B CA XXXXXX FLUX MAPPING 6-P 93 4 F
A CF ACCUMU COLD LEG ACCUMULATOR INOPERABLE (1)
(2)
(3)
(4)
F Forced Reason:
Method:
Exhibit G - Instructions A-Equipment FailureB-Maintenance or test (Explain)
S Scheduled 1-Manual for Preparation of Data 2-Manual Scram Entry Snects For Licensee C-Refueling 3-Automatic Scram (LER Event Report (NUREG-0161))
D-Regulatory Restriction 4-Other (Explain)
File E-Operator Training & License Examination F-Administrative (5)
H-Other (Explain) (Explain)
G-Operator Error Exhibit I - Same Source
.. ~
MONTHLY REFUELING INFORMATION REOUEST t
1.
Facility name: Catawba.
Unit 2 l
2.
Scheduled next refueling shutdown: May 1994 i
3.
Scheduled restart following refueling: July 1994 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF l
ANY T.S.
CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
f 4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
If yes, what will these be?
If no, has reload design and core configuration been reviewed by
(
Safety Review Committee regarding unreviewed safety questions?
5.
Scheduled date(s) for submitting proposed licensing action and
'I supporting information.
l l
6.
Important licensing considerations (new or different design or
- supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
7.
Number of Fuel assemblies (a) in the core: 11~1
[
(b) in the spent fuel pool: 356 j
8.
Present licensed fuel pool capacity: 1418 Size of requested or planned increase: --
9.
Projected date of last refueling which can be accommodated by present licensed capacity: September 2011 j
I DUKE POWER COMPANY DATE:
May 14, 1993 l
Name of
Contact:
N.
C.
Simmons Phone:
704-382-5263 t
i P
s
I DOCKET: 50-414 UNIT: Catawba 2 Date: 04/14/93 f
1 NARRATIVE
SUMMARY
t l
MONTH: April 1993 i
f Catawba Unit 2 began the month of April in end-of-cycle 5 refueling outage. The unit was placed on-line on 4/1 at 1534, for a total duration of 61.67 days. The unit was held at 18% power from 1730 to 2301 in preparation for the main turbine overspeed trip test. The turbine was tripped off4ine at 2301 and was placed i
back on-line on 4/2 at 0100. During power escalation, the unit held at 20% power from 0405 to 0530 for l
flux mapping and at 30% power from 1205 to 4/3 at 1238 for flux mapping. The unit held at 56% power from 4/3 at 2200 to 4/4 at 0315 to place a second feedwater pump in service. The unit was held at 75%
power from 1300 to 2055 for flux mapping. The unit held at 80% power from 2308 to 4/5 at 0220 when the
'C' cold leg accumulator was inoperable due to boron concentration being too high. The unit reached 100%
[
power on 4/5 at 1320. The unit operated at or near 100% full power for the remainder of the month.
I
?
t I
l 6
b t
Prepared by N. C. Simmons Telephone: 704-382-5263 i