123 Main Street White Plains. New York 10601 914 681 6646
- > NewYorkPower o.,.....
49 Authority
?;;;i::;g;;Y April 16,1993 JPN-93-030 l
i l
U.S. Nuclear Regulatory Commission j
ATTN: Document Control Desk Mail Station P1-137 Washington, DC 20555 I
SUBJECT:
James A. FitzPatrick Nuclear Power Plant Docket No. 50-333 Proposed Amendment to the Technical Specifications For Fire Barrier f
Penetration Seal Surveillance Schedule Chanoe (JPTS-92-005) i l
Dear Sir:
l This application for an amendment to the James A. FitzPatrick Technical Specifications changes the surveillance interval from once every 1.5 years to once every refueling cycle.
l The practical effect of the amendment would be to reset the start date of the current fire l
barrier penetration surveillance interval in Technical Specification 4.12.F.1 from September 27, 1991 to January 3,1993.
i Between September 27,1991 and January 3,1993 (during the 1992 refueling outage) j a baseline inspection of mechanical and electrical fire barrier penetration seats was conipleted. Although fire doors and fire dampers were not part of the baseline inspection i
pmgram, they were inspected and repaired under a similar program. Based on the confidence gained through these inspections, the Authority proposes to re-establish the surveillance interval for fire barrier penetrations to once per operating cycle beginning with start-up after the 1992 refueling outage. For the purpose of this proposed surveillance int; rval, the operating cycle began when the reactor went critical on January 3,1993.
The signed original of the Application for Amendment to Operating Ucense is enclosed for filing. The proposed change to the Technical Specifications is Attachment I to this Application for Amendment to the Operating Ucense. The Safety Evaluation for the proposed change is included as Attachment 11. A markup of the effected Technical Specification pages is included as Attachment 111.
260032 d
I i.
9304260096 930416 PDR ADOCK 05000333 P
pg I
~
In accordance with 10 CFR 50.91, a copy of this application and the associated attachments are being provided to the designated New York State official.
If you or your staff have any questions regarding the proposed changes, please contact Mr. J. A. Gray, Jr.
Very truly yours, I
N 'lph Beedle R
att: as stated cc:
Regional Administrator U. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Office of the Resident inspector U. S. Nuclear Regulatory Commission P.O. Box 136 Lycoming, NY 13093 Mr. Brian C. McCabe Project Directorate 1-1 Division of Reactor Projects - 1/11 U. S. Nuclear Regulatory Commission Mail Stop 14 B2 Washington, D.C. 20555 Ms. Donna Ross New York State Energy Office 2 Empire State Plaza 16th Floor Albany, NY 12223
-