ML20035F539

From kanterella
Jump to navigation Jump to search
Comment Opposing NRC Draft GL, Availability & Adequacy of Design Basis Info
ML20035F539
Person / Time
Site: Crystal River 
Issue date: 04/16/1993
From: Beard P
FLORIDA POWER CORP.
To: Meyer D
NRC OFFICE OF ADMINISTRATION (ADM)
References
FRN-58FR15885 58FR15885, DNSP93-0001, DNSP93-1, NUDOCS 9304220010
Download: ML20035F539 (1)


Text

y[q 0{

Q 0?L/M6" fff//5~ W i

s

@o 3/4/!?3 a

h k

Florida Power nea 1 a isas i.

CORPORATION 4

WoeYxl 3

April 16, 1993 DNSP93-0001

_i 2

Mr. David L. Meyer j

Chief, Rules and Directives Review Branch i

Office of Administration a

U. S. Nuclear Regulatory Commission

[

Washington, DC 20555 J

Dear Mr. Meyer:

A Florida Power Corporation (FPC) has reviewed NRC draft generic letter

" Availability and Adequacy of Design Basis Information" (ref. FR15885, March 24,

=

1993). FPC has also reviewed the comments submitted to you by NUMARC in their j

April 2, 1993 correspondence. FPC fully endorses the NUMARC comments.

=

f FPC developed our Configuration Management Information System because we recognized the potential for improved efficiency and productivity. The project was managed by FPC personnel and in-house resources were used in the development.

_j Our program has been very successful because of this and because we involved the users in the entire development.

We are concerned that NRC attempts to j

informally regulate this area will not achieve an improvement in overall safety and will only result in unnecessary expenditure of limited utility resources.

3 FPC urges the NRC to reconsider issuing the generic letter.

g Sincerely, j

M P. M. Beard, Jr.

i Senior Vice President e

Nuclear Operations 3:

PMB/RCW: mig "5

s=

3042 0010 930416 50 50FR15885 PDR 5

GENERAL OFFICE: 3201 Thirty-fourth Street South P.O. Box 14042 + St. Petersburg, Florida 33733 + (813) 866-5151 A Florida Progress Company S

- - - - - - - - - - - - - - - - - -