Forwards Insp Repts 50-498/93-12 & 50-499/93-12 on 930213- 0317.Identified Violations Being Considered for Escalated Enforcement Action
ML20035E923
Person / Time
Site: South Texas  
Issue date: 04/14/1993
From: Beach A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Hall D
HOUSTON LIGHTING & POWER CO.
Shared Package
ML20035E924 List:
References
EA-93-066, EA-93-66, NUDOCS 9304200076
Download: ML20035E923 (5)


See also: IR 05000498/1993012

Text

.

jkR88Go

UNIT ED ST ATES

.

[

,%

NUCLEAR REGULATORY COMMISSION -

j j .L '

j

REGION IV

$

'I

611 RY AN PLAZA DRIVE, SutT E 400

8

AR LINGTON, T E X AS 76011 -8064

x

e i 4 iwa

-

Docket Nos. 50-498

50-499

License Nos. NPF-76

NPF-80

EA 93-66

l

Houston Lighting & Power Company

ATTN: Donald P. Hall, Group

Vice President, Nuclear

P.O. Box 1700

Houston, Texas 77251

Gentlemen:

SUBJECT: NRC INSPECTION REPORT NO. 50-498/93-12; 50-499/93-12

This refers to the special inspection conducted by Mr. J. I. Tapia of this

office between February 13 and March 18, 1993. The inspection included a

review of activities authorized for your South Texas Project, Units 1 and 2,

At the conclusion of the inspection, the findings were discussed

facility.

with those members of your staff identified in the enclosed report.

-

The inspection consisted of a review of the issues associated with undersized

120 volt vital ac electrical fuses. Within this area, the inspection

consisted of selective examinations of procedures and representative records,

interviews with personnel, and observations of activities in progress.

Based on the results of this inspection, two apparent violations were

identified and are being considered for escalated enforcement action in

accordance with the " General Statement of Policy and Procedure for NRC

Enforcement Actions" (Enforcement Policy), 10 CFR Part 2, Appendix C.

Accordingly, no Notice of Violation is presently being issued for these

inspection findings.

Please be advised that the number and characterization

of the apparent violations described in the enclosed inspection report may

change as a result of further NRC review.

)

'

The first apparent violation involved a failure to include all design loads in

the design of the circuits between the Solid State Protection System Actuation

Cabinets and the corresponding 120 volt Vital AC Ungrounded Instrumentation

and Control Power Distribution Panels as required by 10 CFR Part 50,

Appendix B, Criterion III.

The second apparent violation involved operation of both units in violation of

Technical Specification 3.3.2.

Since initial facility operation, there was

the potential for the actuation relays for safety injection, containment

)

/

9304200076 930414

PDR

ADOCK 05000498

.

f

,

W,/,, f u

O

PDR

1

D

l

.

-- .

_

.

1

?

,

Houston Lighting & Power Company

-2-

isolation, main steam line isolation, turbine trip, main feedwater isolation,

and auxiliary feedwater to become inoperable had a main steam line break event

occurred.

l

An enforcement conference to discuss these apparent violations is scheduled

i

for April 22, 1993, at 11 a.m.

The decision to hold an enforcement conference

i

does not mean that the NRC has determined that a violation has occurred or

,

that enforcement action will be taken.

The purposes of this conference are to

discuss the apparent violations, their causes and safety significance; to

provide you the opportunity to point out any errors in our inspection report;

>

'

and to provide an opportunity for you to present your proposed corrective

actions.

In addition, this is an opportunity for you to provide any

l

information concerning your perspectives on:

(1) the severity of the

!

violations, (2) the application of the factors that the NRC considers when it

determines the amount of a civil penalty that may be assessed in accordance

with Section VI.B.2 of the Enforcement Policy, and (3) any other application

of the Enforcement Policy to this case, including the exercise of discretion

-

in accordance with Section VII. You will be advised by separate

correspondence of the results of our deliberations on this matter. No

response regarding these apparent violations is required at this time.

In accordance with 10 CFR Section 2.790 of the NRC's " Rules of Practice," a

copy of this letter and its enclosures will te placed in the NRC Public

Document Room.

,

Should you have any questions concerning this inspection, we will be pleased

to discuss them with you.

Sincerely,

!

f

\\

fL hD

l

. Bill Beach, Director

,

Division of Reactor Projects

Enclosure:

Appendix - NRC Inspection Report

50-498/93-03; 50-499/93-03 w/ attachment

1

cc w/ enclosure:

Houston Lighting & Power Company

ATTN: William J. Jump, Manager

Nuclear Licensing

P.O. Box 289

Wadsworth, Texas 77483

!

_

. _ _

-

--- - -

.-

. - . - - .

- - -

r

.

Jiouston Lighting & Power Company

-3-

i

City of Austin

j

Electric Utility Department

i

ATIN:

J. C. Lanier/M. B. Lee

P.O. Box 1088

Austin, Texas 78767

i

City Public Service Board

'

ATTN:

R. J. Costello/M. T. Hardt

P.O. Box 1771

San Antonio, Texas 78296

Newman & Holtzinger, P. C.

l

ATTN: Jack R. Newman, Esq.

1615 L Street, NW

Washington, D.C.

20036

i

i

Central Power and Light Company

'

ATTN:

D. E. Ward /T. M. Puckett

P.O. Box 2121

Corpus Christi, Texas 78403

INP0

'

Records Center

1100 Circle 75 Parkway

Atlanta, Georgia 30339-3064

Mr. Joseph M. Hendrie

50 Bellport Lane

Bellport, New York 11713

Bureau of Radiation Control

State of Texas

1101 West 49th Street

Austin, Texas 78756

Judge, Matagorda County

,

Matagorda County Courthouse

!

1700 Seventh Street

Bay City, Texas 77414

i

Licensing Representative

Houston Lighting & Power Company

Suite 610

l

Three Metro Center

Bethesda, Maryland 20814

7_

_ _ . . _ _ . _ _ _ . _ . _ . _ _ _ _ _ _

_ ..

9

i

!

Houston Lighting & Power Company

-4-

Houston Lighting & Power Company

ATTN: Rufus S. Scott, Associate

General Counsel

P.O. Box 61867

Houston, Texas 77208

.-

. _ _

_ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ . _ . _ . _ _ _ _ _ _ . _ . _ _ _ _ _ _ _ _ _ . _ _ _ _ _ .

_ - _ _ _ _ _

. _ . . .

- _ _ . . .

,.

.-

-

.

APR 1 4 1913

Houston Lighting & Power Company

-4_

bcc to DMB (IE14)

bcc distrib. by RIV:

J. L. Milhoan

Resident Inspector

i

DRP

Section Chief (DRP/0)

Lisa Shea, RM/ALF, MS: MNBB 4503

MIS System

DRSS-FIPS

RIV File

Project Engineer (DRP/D)

R. Bachmann, OGC, MS: 15-B-18

DRS

Section Chief (DRP/TSS)

G. F. Sanborn, EO

J. Lieberman, OE, MS: 7-H-5

W. L. Brown, RC

A. B. Beach, D/DRP

,

F

i

l

l

s

GF3[pdborn

E0'

M

D;

RP

RIV: SRI'\\e

C:DRP/

JL . erman

All _

h

JITapia/if

TFStetka

d&74/93

4/'J/93

4/7/93

.s4-

3

4/Vg/93

l

l

t

- - ...

AR 141993141993Houston Lighting & Power Company

-4-

bcc to DMB (IE14)

bcc distrib. by RIV:

J. L. Milhoan

Resident Inspector

DRP

Section Chief (DRP/D)

Lisa Shea, RM/ALF, MS: MNBB 4503

MIS System

DRSS-FIPS

RIV File

Project Engineer (DRP/D)

R. Bachmann, OGC, MS: 15-B-18

DRS

Section Chief (DRP/TSS)

G. F. Sanborn, EO

J. Lieberman, OE, MS: 7-H-5

W. L. Brown, RC

A. B. Beach, D/DRP

l

RIV:SRIk '

C:DRP/

E0, /

D RP !

JITapia/lr

TFStetka

G Q dborn

JL

an

A

477/93

4/1/93

4/'j/93

)

/93

4/q/93

,

l

'