ML20035E923
| ML20035E923 | |
| Person / Time | |
|---|---|
| Site: | South Texas |
| Issue date: | 04/14/1993 |
| From: | Beach A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Hall D HOUSTON LIGHTING & POWER CO. |
| Shared Package | |
| ML20035E924 | List: |
| References | |
| EA-93-066, EA-93-66, NUDOCS 9304200076 | |
| Download: ML20035E923 (5) | |
See also: IR 05000498/1993012
Text
.
jkR88Go
.
[
,%
NUCLEAR REGULATORY COMMISSION -
j j .L '
j
REGION IV
$
'I
611 RY AN PLAZA DRIVE, SutT E 400
8
AR LINGTON, T E X AS 76011 -8064
x
e i 4 iwa
-
Docket Nos. 50-498
50-499
License Nos. NPF-76
NPF-80
EA 93-66
l
Houston Lighting & Power Company
ATTN: Donald P. Hall, Group
Vice President, Nuclear
P.O. Box 1700
Houston, Texas 77251
Gentlemen:
SUBJECT: NRC INSPECTION REPORT NO. 50-498/93-12; 50-499/93-12
This refers to the special inspection conducted by Mr. J. I. Tapia of this
office between February 13 and March 18, 1993. The inspection included a
review of activities authorized for your South Texas Project, Units 1 and 2,
At the conclusion of the inspection, the findings were discussed
facility.
with those members of your staff identified in the enclosed report.
-
The inspection consisted of a review of the issues associated with undersized
120 volt vital ac electrical fuses. Within this area, the inspection
consisted of selective examinations of procedures and representative records,
interviews with personnel, and observations of activities in progress.
Based on the results of this inspection, two apparent violations were
identified and are being considered for escalated enforcement action in
accordance with the " General Statement of Policy and Procedure for NRC
Enforcement Actions" (Enforcement Policy), 10 CFR Part 2, Appendix C.
Accordingly, no Notice of Violation is presently being issued for these
inspection findings.
Please be advised that the number and characterization
of the apparent violations described in the enclosed inspection report may
change as a result of further NRC review.
)
'
The first apparent violation involved a failure to include all design loads in
the design of the circuits between the Solid State Protection System Actuation
Cabinets and the corresponding 120 volt Vital AC Ungrounded Instrumentation
and Control Power Distribution Panels as required by 10 CFR Part 50,
Appendix B, Criterion III.
The second apparent violation involved operation of both units in violation of
Technical Specification 3.3.2.
Since initial facility operation, there was
the potential for the actuation relays for safety injection, containment
)
/
9304200076 930414
ADOCK 05000498
.
f
,
W,/,, f u
O
1
D
l
.
-- .
_
.
1
?
,
- Houston Lighting & Power Company
-2-
isolation, main steam line isolation, turbine trip, main feedwater isolation,
and auxiliary feedwater to become inoperable had a main steam line break event
occurred.
l
An enforcement conference to discuss these apparent violations is scheduled
i
for April 22, 1993, at 11 a.m.
The decision to hold an enforcement conference
i
does not mean that the NRC has determined that a violation has occurred or
,
that enforcement action will be taken.
The purposes of this conference are to
discuss the apparent violations, their causes and safety significance; to
provide you the opportunity to point out any errors in our inspection report;
>
'
and to provide an opportunity for you to present your proposed corrective
actions.
In addition, this is an opportunity for you to provide any
l
information concerning your perspectives on:
(1) the severity of the
!
violations, (2) the application of the factors that the NRC considers when it
determines the amount of a civil penalty that may be assessed in accordance
with Section VI.B.2 of the Enforcement Policy, and (3) any other application
of the Enforcement Policy to this case, including the exercise of discretion
-
in accordance with Section VII. You will be advised by separate
correspondence of the results of our deliberations on this matter. No
response regarding these apparent violations is required at this time.
In accordance with 10 CFR Section 2.790 of the NRC's " Rules of Practice," a
copy of this letter and its enclosures will te placed in the NRC Public
Document Room.
,
Should you have any questions concerning this inspection, we will be pleased
to discuss them with you.
Sincerely,
!
f
\\
- fL hD
l
. Bill Beach, Director
,
Division of Reactor Projects
Enclosure:
Appendix - NRC Inspection Report
50-498/93-03; 50-499/93-03 w/ attachment
1
cc w/ enclosure:
Houston Lighting & Power Company
ATTN: William J. Jump, Manager
Nuclear Licensing
P.O. Box 289
Wadsworth, Texas 77483
!
_
. _ _
-
--- - -
.-
. - . - - .
- - -
r
.
Jiouston Lighting & Power Company
-3-
i
City of Austin
j
Electric Utility Department
i
ATIN:
J. C. Lanier/M. B. Lee
P.O. Box 1088
i
City Public Service Board
'
ATTN:
R. J. Costello/M. T. Hardt
P.O. Box 1771
San Antonio, Texas 78296
Newman & Holtzinger, P. C.
l
ATTN: Jack R. Newman, Esq.
1615 L Street, NW
Washington, D.C.
20036
i
i
Central Power and Light Company
'
ATTN:
D. E. Ward /T. M. Puckett
P.O. Box 2121
Corpus Christi, Texas 78403
INP0
'
Records Center
1100 Circle 75 Parkway
Atlanta, Georgia 30339-3064
Mr. Joseph M. Hendrie
50 Bellport Lane
Bellport, New York 11713
Bureau of Radiation Control
State of Texas
1101 West 49th Street
Judge, Matagorda County
,
Matagorda County Courthouse
!
1700 Seventh Street
Bay City, Texas 77414
i
Licensing Representative
Houston Lighting & Power Company
Suite 610
l
Three Metro Center
Bethesda, Maryland 20814
7_
_ _ . . _ _ . _ _ _ . _ . _ . _ _ _ _ _ _
_ ..
9
i
!
Houston Lighting & Power Company
-4-
Houston Lighting & Power Company
ATTN: Rufus S. Scott, Associate
General Counsel
P.O. Box 61867
Houston, Texas 77208
.-
. _ _
_ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ . _ . _ . _ _ _ _ _ _ . _ . _ _ _ _ _ _ _ _ _ . _ _ _ _ _ .
_ - _ _ _ _ _
. _ . . .
- _ _ . . .
,.
.-
-
.
APR 1 4 1913
Houston Lighting & Power Company
-4_
bcc to DMB (IE14)
bcc distrib. by RIV:
J. L. Milhoan
Resident Inspector
i
Section Chief (DRP/0)
Lisa Shea, RM/ALF, MS: MNBB 4503
MIS System
DRSS-FIPS
RIV File
Project Engineer (DRP/D)
R. Bachmann, OGC, MS: 15-B-18
Section Chief (DRP/TSS)
G. F. Sanborn, EO
J. Lieberman, OE, MS: 7-H-5
W. L. Brown, RC
A. B. Beach, D/DRP
,
F
i
l
l
s
GF3[pdborn
E0'
M
D;
RIV: SRI'\\e
C:DRP/
JL . erman
All _
h
JITapia/if
TFStetka
d&74/93
4/'J/93
4/7/93
.s4-
3
4/Vg/93
l
l
t
- - ...
AR 141993141993Houston Lighting & Power Company
-4-
bcc to DMB (IE14)
bcc distrib. by RIV:
J. L. Milhoan
Resident Inspector
Section Chief (DRP/D)
Lisa Shea, RM/ALF, MS: MNBB 4503
MIS System
DRSS-FIPS
RIV File
Project Engineer (DRP/D)
R. Bachmann, OGC, MS: 15-B-18
Section Chief (DRP/TSS)
G. F. Sanborn, EO
J. Lieberman, OE, MS: 7-H-5
W. L. Brown, RC
A. B. Beach, D/DRP
l
RIV:SRIk '
C:DRP/
E0, /
D RP !
JITapia/lr
TFStetka
G Q dborn
JL
an
A
477/93
4/1/93
4/'j/93
)
/93
4/q/93
,
l
'