4 Wisconsin Electnc POWER COMPANY 231 w Mcrigm to fkw 2045 wwo*ee. WI 53201-2046 (414)221-234s VPNPD-93-083 NRC-9 3 - 04 9 April 7, 1993 Document Control Desk U.S.
NUCLEAR REGULATORY COMMISSION Mail Station P1-137 1
Washington, DC 20555 i
Gentlemen:
DOCKETS 50-266 AND 50-301 MONTHLY OPERATING REPORTS POINT BEACH NUCLEAR PLANT. UNITS 1 AND 2 B
Attached are monthly operating reports for Units 1 and 2 of the Point Beach Nuclear Plant for the calendar month of March 1993.
Sincerely, W
Bob ink Vice President Nuclear Power MFB/jg cc:
L.
L. Smith, PSCW NRC Regional Administrator, Region III NRC Resident Inspector
~
{
l 9304120157 930331
)
PDR ADOCK 05000226 hV R
PDR I
v Asukudan ofHkynenExm Gwpathm
.m o
OPERATING DATA REPORT
~
DOCKET No. 50-266 DATE:
04/01/93 COMPLETED BY:
Richard F. Arnold TELEPHONE:
(414) 755-6193 OPERATING STATUS
- 1. UNIT NAME:
POINT BEACH NUCLEAR PLANT - UNIT 1 NOTES
- 2. REPORTING PERIOD: March - 1993 3.
LICENSED THERMAL POWER (MWT):
1518.5 4.
NAMEPLATE RATING (GROSS MWE):
523.8
- 5. DESIGN ELECTRICAL RATING (NET MWE):
497.0
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):
509.0.
7.
MAXIMUM DEPENDABLE CAPACITY (NET MWE):
485.0 8.
IF CHANGES OCCUR IN CAPACITY BATINGS (ITEM.S 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
NA 9.
POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): NA
- 10. REASONS FOR RESTRICTIONS, (IF ANY):
0.0 THIS MONTH YEAR TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD 744.0 2,160.0 196,368.0
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 630.0 2,046.0 162,929.3
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 667.3
- 14. HOURS GENERATOR ON LINE 628.9 2,044.9 159,884.3
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 846.9
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 945,978 3,093,553 224,830,526
- 17. GROSS ELECTRICAL ENERGY GENERATED 320,370 1,046,540 75,922,940
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 306,229 1,002,565 72,354,728
- 19. UNIT SERVICE FACTOR 84.5%
94.7%
81.4%
- 20. UNIT AVAILABILITY FACTOR 84.5%
94.7%
81.9%
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 84.9%
95.7%
75.6%
- 22. UNIT CAPACITY FACTOR (USING DER NET) 82.8%
93.4%
74.1%
- 23. UNIT FORCED OUTAGE RATE 0.0%
0.0%
1.6%
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH)*
NONE
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
05/08/93 DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22, 1977 e
---n,i-
._r-
---_--w-
. +
m
,,.,s_s e.-
iL.
[
L L
E E
~
it n
G EE U
A V LN L
3 RI Re 4
4 4
4 3
1 h.
3 l
9 9
9 9
9 7
9 0
9 5
3 9
h 9
EAEW 1
c 0
o 1
4 4
4 4
4 4
a 1
n 6
VDWM e
r 5
A O
B A
5 1
6 l
F.
/
6 t
i 7
P n
2 io p
4 r
-0 1
5 P
A R
4 Y
B D
E O
E E
N N
M T
0 T
A E
1 E
N L
C T
E P
P 1
K E
Y T
M L
A I
O N
A O
E 1
2 3
4 5
6 7
3 9
0 1
D 2
2 2
2 2
2 2
2 2
3 3
D U
D C
T L
E T
V L
N E
E A
L E
VT L
39 G
EE t
P l
A YLN E
9 R
W RI Re 3
3 4
4 4
5 3
4 5
3 1
L A
O EAEW 9
9 9
9 9
9 9
9 9
9 E
l 4
4 4
4 4
4 4
4 4
4 P
L C
VDWM i
A C
T R
O I
U N
A P
N U
M l
Y iC L
I A
A E
D l
B i
E T
T G
N N
A O
I l
O M
l P
EVA Y
A 1
2 3
4 5
6 7
8 9
0 D
1 1
1 1
1 1
1 1
1 2
L E
E VT G
EE A YLN L
RI Re 3
2 2
2 3
5 9
2 9
1 9
9 9
9 9
9 9
8 8
7 EAEW 4
4 4
4 4
4 4
4 4
4 VDWM A
O P
a R
20
)
Y 00 9
A F 1 1
2 3
4 5
6 7
8 9
0 D
D 0
1 P(
POINT BEACll NUCLEAR PLANT Docket No.
50-266 Unit Name Point Beach. Unit 1 UNIT SIIUTDOWNS AND POWER REDUCTIONS Date April 1.1903 Completal Ey R. F. Arnoi,1 REPORT MONTH M ARCH - 1993 Telephone No.
414/755 4 193 Method of Shutting No.
Date Type' Duration Rea mn*
Down Licenwe Event Sy stem Component Cause and Corrective Action 1
3/27/93 S
115.1 C
1 NA NA NA NA 1
'F: Forced
?Reason:
' Method:
" Exhibit G - Instructions -
5: Scheduled A Equipment Failure (explain) 1 - Manual for preparation of B - Maintenance or Testing 2 - Manual Scram data entry sheets C - Refueling 3 - Automatic Scram LER file (NUREG-0161)
D - Regulatory Restriction 4 - Continuation of E - Operator Training &
Previous Shutdow Licensing Exam 5 - Reduced Imad F - Administrative 6 - Other (explain)
' Exhibit I - Same Soutre G - Operational Error (explain)
II - Other (explain) l l
PBF W28b l
(03-90)
_. _ _ - -. ~. - _.., _ _ _ _.. _ _. -. _....
.. _ _... _. _ _.. _.. -.,_._.__ _. _-...-,-..~
e DOCK 5T NO.
50-266 UNIT NAME Point Beach Unit 1.
DATE April 1, 1993 COMPLETED BY R.
F. Arnold TELEPHONE 414/755-6193 j
i i
l Unit 1 operated at approximately 411 MWe net durit.g the report
)
period. The unit was shutdown for refueling outage on 3/27/93.
4 Licensee Event Report 266/301 93-002-00, Inoperability of Both Emergency Diesel Generators, was submitted.
Supplement 3 to Licensee Event Report 266/301 92-004-00, Improper Sequencing of Emergency Safety Features, was submitted, j
Safety-related maintenance included:
l
- 1. Replaced G01 emergency diesel generator fuel oil transfer i
pump motor to pump coupling.
I 2.
Replaced lubricating oil pump on G01 emergency diesel generator.
3.
Increased torque switch settings for service water crossconnect valve operator.
l 4.
Replaced screws for pantograph link mounting hardware on 480V safeguards load center.
I a
I
[
i i
l r
h 1
n h
e 7
m
O*ERATING DATA REPORT DOCKET No. 50-301 DATE:
04/01/93 COMPLETED BY: Richard F.
Arnold TELEPHONE:
(414)755-6193 OPERATING STATUS 1.
UNIT NAME:
POINT BEACH NUCLEAR PLANT - UNIT 2 NOTES 2.
REPORTING PERIOD:
March - 1993
- 3. LICENSED THERMAL POWER (MWT):
1518.5
- 4. NAMEPLATE RATING (GROSS MWE):
523.8
- 5. DESIGN ELECTRICAL RATING (NET MWE):
497.0
- 6. MAXIMUM DEPENDABLE CAPACITY (GROS 5 MWE):
509.0 7.
MAXIMUM DEPENDABLE CAPACITY (NET MWE):
485.0 8.
IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
NA 9.
POWER LEVEL TO WHICH RESTRICTED, IF ANY (N?T MWE):
NA
- 10. REASONS FOR RESTRICTIONS, (IF ANY):
NA THIS MONTH YEAR TO DATE CUFULATIVE
- 11. HOURS IN REPORTING PERIOD 744.0 2,160.0 181,153.0
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 731.7 2,147.7 158,423.6
- 13. REACTOR RESERVE SHUTDOWN HOURS 4.0 4.0 233.9
- 14. HOURS GENERATOR ON LINE 723.3 2,139.3 156,121.8
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 302.2
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1,065,780 3,186,072 223,832,333
- 17. GROSS ELECTRICAL ENERGY GENERATED 364,970 1,093,230 76,093,350
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 349,200 1,047,099 72,533,506
- 19. UNIT SERVICE FACTOR 97.2%
99.0%
86.2%
- 20. UNIT AVAILABILITY FACTOR 97.2%
99.0%
86.3%
]
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 96.8%
100.0%
81.9%
- 22. UNIT CAPACITY FACTOR (USING DER NET) 94.4%
97.5%
80.6%
- 23. UNIT FORCED OUTAGE RATE 2.8%
1.0%
1.0%
- 24. SHUTDOWNS SCHEDULED OVER NFXT 6 MONTHS (TYPE, DhTE, AND DURATION OF EACH):
Refueling Outage, 09/25/93, 50 Days
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUPt NA DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22, 1977
. ~.
4 POINT BEACH NUCLEAR PLANT DOCKET NO.
50-301 AVERAGE IM 8LY UNIT POWER LEVEL UNIT NAME Point Beach. Unii 2 MONTH M ARCH - 1993 DATE
.boril 1.1993 COMPLETED BY R. F. Ameld TELEPilONE 414/755-6193 AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET
_D3Y MWe NET DAY MWe NET I
35 11 492 21 496 i
2 6
12 494 22 496 3
_495 13 496 23 496 i
4 494 14 496 24 497 5
495 15 496 25 495 6
495 16 496 26 496 7
498 17 495 27 494 8
497 18 495 28 26 9
481 19 497 29 180 10 490 20 495 30 492 31 494' 2
PBF-0028a (03-90)
_ -,. _ _ ~.
n h
.m2 si u
L_c.
L POINT BEACil NUCLEAR PLANT Docket 'io.
50-301 Unit Name Point Beach. Unit 2 l
UNIT SIIUTDOWNS AND POWER REDUCTIONS Date April 1.1993 Completed By R. F. Arnold REPORT MONTil M ARCil - 1993 Telephone No.
d 14/755-6193 Method or Shutting Duration Down Licensee Event System f..iponent Cause and Corrective Action No.
Date Type' Olours)
Rea son' Reactop Report No.
Code' Code' To Prevent Recurrence 1
3/78/93 F
20.7 0
3 301/9343024F)
IIA TURBIN Operator errur while performing surve;11ance test of the turbine trip mechanism.
Investigation with respect to root cause in progress.
'F: Forced Reason:
' Method:
' Exhibit G - Instructions 2
S: Scheduled A - Equipment Failure (explair.)
1 - Manual for preparation of B - Maintenance or Testing 2 - Manual Scram data entry sheets C - Refueling 3 - Automatic Scram LER file (NUREG-0161)
D - Regulatory Restriction 4 - Continuation of E - Operator Training &
Previous Shutdown Licensing Exam 5 - Reduced lead F - Administrative 6 - Other (explain)
Exhibit I - Same Source 8
G - Operational Error (explain) 11 - Other (explain) t k
PDF-0028b (03-90)
l 5
-i DOCKET NO.
50-301 UNIT NAME Point Beach Unit 2 DATE April 1, 1993 COMPLETED BY R.
F. Arnold TELEPHONE 414/755-619s Unit 2 operated at approximately 492 Mwe net throughout the i
report period.
Unit 2 experienced one automatic scram as a result of operator error while performing surveillance testing of turbine trip mechanisms. A root cause evaluation is in progress.
t LER 301/93-002-00 will be submitted.
I Safety-relat ed maintenance included:
- 1. Replaced mechanical seal on component cooling water pump.
2.
Replaced screws for pantograph link mounting hardware on 480V j
safeguards load center.